NBS Source

Battersea Power Station

by Briggs Amasco Ltd

Briggs Amasco designed, supplied and installed a mastic asphalt roadway without hindrance to other on-site trades with a 40 mm Permapark asphalt application providing long term protection to the Permatec Waterproofing installed to the haul roads at the Battersea Project London. The Permatec waterproofing was required to be installed early to allow the installation of the energy centre below podium level, it was determined pre-contract that the waterproofing would not be able to withstand the high traffic loads that would transit the podium during construction, various protection methods were reviewed and Mastic Asphalt was the only product...

Products featured in this case study

View all products (8)
FlexiPhalte

FlexiPhalte

More case studies from Briggs Amasco Ltd

View all case studies(88)
Briggs Amasco smooth surface at King's Cross platform redevelopment

Briggs Amasco smooth surface at King's Cross platform redevelopment

Westfield Shopping Village

Westfield Shopping Village

Aberdeen Airport

Aberdeen Airport

Gateshead Bus Station

Gateshead Bus Station