The Dolphin team liaised with TP Bennet architects and Stortford Interiors contractors to ensure that this extensive re-modelling of the interior spaces including washrooms was carried out seamlessly. To date, up to 40 washrooms have been refurbished in this phased roll-out with a crisp, clean and bright washroom design. Despite not being a public building, its employee capacity is in the hundreds with expectations of greeting and hosting for high-end customers. They wanted a washroom that could withstand high volumes of traffic but look beautiful each time it was used.
Contact Dolphin Solutions by clicking the button below to find out which products were used in this case study.
The Shard, London
Dublin Airport, Terminal 2
DEER WALK, THE CENTRE IN MILTON KEYNES, UK
VICTORIA GATE SHOPPING CENTRE LEEDS