by IPP Ltd
Recently completed 3,600m2 roof over the auditorium and sports hall uses perforated metal decking to span the main steelwork. Magply specified to carry 150mm of Hardrock DD underlay and a further 60mm of Hardrock Multifix insulation covered by a Sarnafil single ply roofing membrane. Stevie Jones, commented: “This is a large installation of some 3,600 square metres, with the auditorium and the higher level roof over the sports complex, both featuring the use of the Magply. They are being mechanically fixed to the decking prior to installing the two layers of Rockwool and then the Sarnafil membrane..”