NBS Source
I'm a manufacturer

Ballards Rise, South Croydon

OVERVIEW

Ballards Rise is home to a development of eight flats (seven 1 bed & one 2 bed) across two interlinked purpose-built blocks. The front block comprises six flats over three floors with two further flats to the rear block over two storeys. This development has regular transport links into central London.


Cellecta’s DECKfon 26T was specified by OB Architecture due to it being the ideal acoustic overlay treatment to improve the performance of the original structural timber decked floor. The tongue and groove on the floorboard make it quick and easy to install, saving time and money.


Excel Construction were supplied 587m² of Cellecta products for this development in South Croydon.

Products featured in this case study

View all products (40)
DECKfon® 17T, 26T, 30

DECKfon® 17T, 26T, 30

More case studies from Cellecta Ltd

View all case studies (102)
Aris House, Lymington Road

Aris House, Lymington Road

Admirals Quay, Southampton

Admirals Quay, Southampton

Alexandra House, Portsmouth

Alexandra House, Portsmouth

Arras Way, Folkestone

Arras Way, Folkestone

More case studies from Particleboards

View all case studies (19)
True Potential Headquarters, Newcastle

True Potential Headquarters, Newcastle

Best Western Plus Vauxhall, London

Best Western Plus Vauxhall, London

Fresh Student Living, Aberdeen

Fresh Student Living, Aberdeen

Anchor Line Aparthotel, Glasgow.

Anchor Line Aparthotel, Glasgow.