Macs Automated Bollards Systems Ltd are delighted to have completed the supply and installation of two 275/800 automatic bollards, located at Hampton Court Palace for Historic Royal Palaces in Richmond upon Thames. The rising bollards have been implemented as a way for Historic Royal Palaces to implement a system to control vehicle access to traffic using this road link, and to help improve safety and efficiency for the residents and pedestrians.
No featured products in this case study
Contact Macs Automated Bollard Systems Ltd by clicking the button below to find out which
products were used in this case study.