Asphalt from 1906 Replaced on Major UK Landmark

OVERVIEW

Successful project management and asphalt installation (in accordance with BS 8218:1998) were key to conserving one of the most important architectural structures in the UK. Works were phased to enable continued public access to Stone Gallery sections. The height and highly sensitive fabric of the building meant that all materials were transported to the Gallery via three hoists, requiring careful operation and management. Asphalt was stripped and re-laid in sections to ensure watertightness. Stripping enabled the client to view the condition of the Portland Stone paving beneath the asphalt.