Airbus

OVERVIEW

Based on technology from Eaton, an existing system was upgraded quickly and successfully to state-of-the-art standards in terms of monitoring, safety and personnel protection.

Location: Hamburg, Deutschland

Challenge: Modernization of an existing low voltage main distribution unit for increased system availability and safety.

Solution: Modan switchgear, BreakerVisu logging and visualisation system, IZM and NZM circuit breakers, Smart-Wire-DT wiring system, diagnostic systems for continuous temperature monitoring, Arcon arc fault protection system.

Results: Good-as-new system equipped with extensive monitoring functionality connected to the control system enabling data examination even for individual circuit breakers, unexpected temperature spikes at critical points are reported early and switchoff is quick and reliable in the event of an arc fault.

No featured products in this case study

Contact Eaton Electric by clicking the button below to find out which products were used in this case study.

More inspiration from Eaton Electric

View inspiration
PPL Training installs the latest in adaptive evacuation lighting at fire safety training sites across England

PPL Training installs the latest in adaptive evacuation lighting at fire safety training sites across England

Warwick University

Warwick University

The Florian Hotel, Amsterdam, The Netherlands

The Florian Hotel, Amsterdam, The Netherlands