NBS Source
I'm a manufacturer

This case study is no longer available.

Aerotel, Terminal 3, Heathrow Airport

OVERVIEW

The Transit Hotel at Heathrow Airport Terminal 3, required the installation of shallow wetroom drainage and waterproofing solutions into 82 guest suites.

No featured products in this case study

Contact CCL Building Products Ltd by clicking the button below to find out which products were used in this case study.