The Project Design team had the outline brief that the residential scheme had to achieve BREEAM Excellent Code for Sustainable Homes Level 4. Due to the specifiers concerns over fire performance the original external wall insulation (EWI) specification also called for a mineral wool insulation to be incorporated within the system. Upon consultation with Dryvit, the Project Design team selected the Dryvit Outsulation Rail system for use as it met the outline design intent for the project, whilst …