OVERVIEW
We were invited by Kier to come up with a new way of doing things for the Service Riser flooring on phase one of the Perry Barr Residential Scheme in Birmingham last year. When complete, the scheme will provide 1,400 much-needed new homes for Birmingham. Part of a much wider project, it will also act as a catalyst for circa. 5,000 new homes and wider regeneration in the north west of the city – including improved leisure and community facilities along with upgraded transport infrastructure. Phase one includes a mix of one and two-bed apartments and three and four-bed houses, an ‘extra care’-type facility providing housing, a variety of services for the older community and areas of public space, as well as private courtyards and amenity spaces.
For the apartment blocks, 120 GRP Riser Floors were required but, rather than us installing them after the floors were poured, they needed to be cast in by the contractors responsible for the concrete.
There are advantages to doing it this way:
The steel industry has been providing the profiles for this for a while but, if you wanted to use a complete low-maintenance GRP solution, it hasn’t been possible. Our engineers came up with a solution that worked, allowing a seamless integration into the schedule with minimal fuss. The resulting riser duct floors met every requirement and holes for service pipes and cables can be quickly and easily cut in as required with no hot works or sparking hazards.
If you have an idea of a new way of doing things and need a GRP partner to help you develop your thoughts, get in touch today.
GRP RiserDeck Cast-in System - Service Riser Floors
Pumping Station Chamber Renovation
UCL East – New Campus at Stratford
Birmingham Council House
Retro-Fitted Risers
Chirag Oil Field
GDF Suez Cygnus Bravo
Solan Topside
Clair Ridge Oil Field