NBS Source
I'm a manufacturer

This case study is no longer available.

A Cladding Refurbishment Project with Specific Colouring Requirements

OVERVIEW

The appearance of the current cladding was in need of improvement and with the client requiring a specific colour, IKO were approached. IKO Polimar CRS was chosen as it ticked all the relevant boxes for the client – a single coat repair system that provide a tough, durable finish with excellent erosion, weather and UV resistance and a 10 year material guarantee.

No featured products in this case study

Contact IKO UK by clicking the button below to find out which products were used in this case study.

More case studies from IKO UK

View all case studies (1)
Dixons Croxteth Academy, Liverpool

Dixons Croxteth Academy, Liverpool