IKO worked with Brindley Asphalt on this school. The school has 900 pupils, works include replacing the defective waterproof covering, incorporating new tapered insulation to current building regulations and creating falls to remove the drainage of the surface water. Also, replacement of windows and M&E plant to the kitchen area.
This was a highly complicated insulation design due to the deflection and backfalls within the existing roof. The roof had several different interfaces such as adjoining roof level, rooflight and specialist M&E equipment.
COMPLEXITY AND WORKMANSHIP
There were many changes in elevation and some very neat workmanship was observed, the largest Insulation board was over 350mm deep. In most areas, tapered insulation schemes were designed to alter points/elevations of drainage run-off due to existing issues of ground-level flooding experienced by the site.
THE EXCEPTIONAL ACHIEVEMENTS ON COMPLETION OF THIS PROJECT WERE
Contact IKO PLC by clicking the button below to find out which products were used in this case study.
Allenby Barracks
Jesus College
Waverley Court
Colchester County High School