by IKO PLC
In using IKO Carrara, the college will be neutralising on average, the emissions from up to 6 diesel cars each year. The addition of a darker coloured walkway across the roof falls means it is much easier to stay safe on top of the building when inspections and maintenance are required, while also preventing any water being trapped behind the laps.
Contact IKO PLC by clicking the button below to find out which products were used in this case study.
Portslade Academy - IKO Ultra Prevent
Wythenshawe Hospital - IKO Ultra Prevent and IKO Polimar EC/UV
Westminster Cathedral (Carbon Neutral) - IKO Permaphalt
Replacing the 55,000m2 Roof Area at Euston Station
© 2020 NBS Enterprises Ltd. All rights reserved.
1 / 1