NBS Source
I'm a manufacturer

Maintainable Waterproofing solutions

OVERVIEW

The scope of the works was to design, specify and install a suitable waterproofing solution to 2 large properties engineered from ICF construction which required waterproofing. Areas where attention from a skilled specialist were required, was to the rear and two side walls which were earth/ground retaining.


When specifying a suitable waterproofing solution, consideration to the final use of the building, designing a system to be maintainable and repairable along with a deep understanding of BS 8102:2009 is essential in ensuring project success.

From a waterproofing design perspective, we use three grades to define waterproofing systems.


These 3 grades are:


Grade 1 – Some water seepage and damp are tolerable depending on the intended use

Grade 2 – No water penetration is acceptable

Grade 3 – No dampness or water penetration is acceptable


In existing basements and new build properties which will be habitable, Grade 3, is always required.

Products featured in this case study

View all products (74)
Koster Repair Mortar Plus

Koster Repair Mortar Plus

Delta Dual V4 Packaged Pump Station

Delta Dual V4 Packaged Pump Station

Delta MS20 - Cavity Drainage Membrane

Delta MS20 - Cavity Drainage Membrane

Delta Bespoke 1000 Series - Mercury Foul Packaged Pump Station

Delta Bespoke 1000 Series - Mercury Foul Packaged Pump Station

Koster Polysil TG 500

Koster Polysil TG 500

More case studies from Delta Membrane Systems Ltd

View all case studies (37)
Basement Waterproofing

Basement Waterproofing

Flood Recovery – Grade II Listed Building

Flood Recovery – Grade II Listed Building

BRE Flood Reilient Test Home

BRE Flood Reilient Test Home

The Gunnery, Kent

The Gunnery, Kent

More case studies from Concrete repair mortars

View all case studies (13)
Koster Flooring Systems, 96 Middlesex St. London

Koster Flooring Systems, 96 Middlesex St. London

Koster Floor coatings to a domestic garage.

Koster Floor coatings to a domestic garage.

Aintree Racecourse - Koster Flooring Systems to Grandstand

Aintree Racecourse - Koster Flooring Systems to Grandstand

Koster Flooring Systems - Protection to Concrete bund

Koster Flooring Systems - Protection to Concrete bund

More case studies from High-density polyethylene (PE-HD) studded sheets

View all case studies (4)
Waterproofing the London School of Economics

Waterproofing the London School of Economics

Structural Waterproofing Mixed Commercial Development

Structural Waterproofing Mixed Commercial Development

Remedial Basement Waterproofing

Remedial Basement Waterproofing

Future Proofing Waterproofing Multi Level Commercial New Build Structure

Future Proofing Waterproofing Multi Level Commercial New Build Structure

More case studies from Private packaged pumping stations

View all case studies (3)
Basement Extension to a Grade 2 Listed Building, London

Basement Extension to a Grade 2 Listed Building, London

Structural Waterproofing Mixed Commercial Development

Structural Waterproofing Mixed Commercial Development

Remedial Basement Waterproofing

Remedial Basement Waterproofing

More case studies from Slip plane bituminous emulsion paint primers

View all case studies (2)
Structural Waterproofing Mixed Commercial Development

Structural Waterproofing Mixed Commercial Development

Remedial Basement Waterproofing

Remedial Basement Waterproofing