This was an interesting waterproofing operation designed and installed by the contracting staff at the BriggsAmasco branch in Glasgow,which solved a ten-year old ingress problem to the roof terrace entrance to the Anderson Building over the lecture theatres below. After extensive exploration, new falls were established, waterproofing was by a hot melt system followed by insulation, topped by a wearing service of decorative paving slabs.
No featured products in this case study
Contact Briggs Amasco Ltd by clicking the button below to find out which
products were used in this case study.