This was an interesting waterproofing operation designed and installed by the contracting staff at the BriggsAmasco branch in Glasgow,which solved a ten-year old ingress problem to the roof terrace entrance to the Anderson Building over the lecture theatres below. After extensive exploration, new falls were established, waterproofing was by a hot melt system followed by insulation, topped by a wearing service of decorative paving slabs.
Contact Briggs Amasco Ltd by clicking the button below to find out which products were used in this case study.
Briggs Amasco smooth surface at King's Cross platform redevelopment
Westfield Shopping Village
Aberdeen Airport
Gateshead Bus Station