OVERVIEW
Sandy Park is a four-star Courtyard by Marriott Hotel. At nine-storeys, the L-shaped hotel will feature leisure facilities on the ground floor and a restaurant on the top floor. The development comprised of the demolition of a bungalow to construct a 250 bedroom hotel, which has access to the existing Sandy Park rugby club stadium complex via a footbridge. The new hotel site is situated alongside the M5 to the south of the main stadium car park adjacent to Old Rydon Lane.
Cellecta’s HiDECK Overlay 18 was specified by Sigmat in this project as the overlay flooring solution. It’s ideal for flooring applications incorporating an underflooring heating system due to its high thermal conductivity which provides rapid reaction times, saving on running costs. In addition, its high density makes it perfect for a variety of acoustic applications.
DNA Integrated Construction was awarded this 24,000m² contract to construct this development in Exeter.
HiDECK - High Conductivity Structural Floorboard
HEXATHERM® XFLOOR 250
Aris House, Lymington Road
Admirals Quay, Southampton
Alexandra House, Portsmouth
Arras Way, Folkestone
Soundis Dry Screed Acoustic Flooring at 83 East Street, Surrey
Soundis Dry Screed Acoustic Flooring with Wood Fibre Resilient Layer at McMillan House, Cheam Common Road, Worcester
Soundis Acoustic Overlay Flooring - Dry Screed Board 33mm at Chessington World of Adventures, London
Soundis Dry Screed Acoustic Flooring at Premier Inn, Lewisham, London
Bloomberg European HQ
Library of Birmingham
Basement Extension to a Grade 2 Listed Building, London
Soundis Underfloor Heating Boards & Acoustic Rubber Matting at Centre Point, London