NBS Source
I'm a manufacturer

Sandy Park Hotel, Exeter

OVERVIEW

Sandy Park is a four-star Courtyard by Marriott Hotel. At nine-storeys, the L-shaped hotel will feature leisure facilities on the ground floor and a restaurant on the top floor. The development comprised of the demolition of a bungalow to construct a 250 bedroom hotel, which has access to the existing Sandy Park rugby club stadium complex via a footbridge. The new hotel site is situated alongside the M5 to the south of the main stadium car park adjacent to Old Rydon Lane.


Cellecta’s HiDECK Overlay 18 was specified by Sigmat in this project as the overlay flooring solution. It’s ideal for flooring applications incorporating an underflooring heating system due to its high thermal conductivity which provides rapid reaction times, saving on running costs. In addition, its high density makes it perfect for a variety of acoustic applications.


DNA Integrated Construction was awarded this 24,000m² contract to construct this development in Exeter.

Products featured in this case study

View all products (31)
HiDECK - High Conductivity Structural Floorboard

HiDECK - High Conductivity Structural Floorboard

HEXATHERM® XFLOOR 250

HEXATHERM® XFLOOR 250

More inspiration from Cellecta Ltd

View inspiration
Wisteria Lodge, Broadstone

Wisteria Lodge, Broadstone

Wick Lane, Hackney Wick

Wick Lane, Hackney Wick

Admirals Quay, Southampton

Admirals Quay, Southampton

Alexandra House, Portsmouth

Alexandra House, Portsmouth

More inspiration from Fibre-reinforced gypsum floorboards

View inspiration
Kings Cross Residential Acoustic Flooring System

Kings Cross Residential Acoustic Flooring System

Duhamel Place

Duhamel Place

Merchant Quay

Merchant Quay

Case Study: Redevelopment of the Historical Ice Works Building in Worcester

Case Study: Redevelopment of the Historical Ice Works Building in Worcester

More inspiration from Extruded polystyrene (XPS) boards

View inspiration
Bloomberg European HQ

Bloomberg European HQ

Library of Birmingham

Library of Birmingham

Case Study - Proteus Hot Melt® - The Tottenham Experience

Case Study - Proteus Hot Melt® - The Tottenham Experience

Case Study: Summerleaze, Somerset

Case Study: Summerleaze, Somerset