NBS Source
I'm a manufacturer

Thomas Keble School

OVERVIEW

Remagin’s Thruwall solution was selected by D&G Contracting Ltd for a new three-storey teaching block at Thomas Keble School.

D&G carried out the SFS package on the new teaching block, which is situated in near Stroud. The scheme to redevelop the existing site will include a mix of new build and refurbishment elements and is set to complete at the end of 2024.

Products featured in this case study

View all products (5)
ETW 134F - Thruwall® Solutions for the Building Envelope - Non-Loadbearing SFS In-fill System

ETW 134F - Thruwall® Solutions for the Building Envelope - Non-Loadbearing SFS In-fill System

ETW 112F - Thruwall® Solutions for the Building Envelope - Non-Loadbearing SFS In-fill System

ETW 112F - Thruwall® Solutions for the Building Envelope - Non-Loadbearing SFS In-fill System

ETW 113D - Thruwall® Solutions for the Building Envelope - Non-Loadbearing SFS In-fill System

ETW 113D - Thruwall® Solutions for the Building Envelope - Non-Loadbearing SFS In-fill System

ETW 114F - Thruwall® Solutions for the Building Envelope - Non-Loadbearing SFS In-fill System

ETW 114F - Thruwall® Solutions for the Building Envelope - Non-Loadbearing SFS In-fill System

ETW 213D - Thruwall® Solutions for the Building Envelope - Non-Loadbearing SFS In-fill System

ETW 213D - Thruwall® Solutions for the Building Envelope - Non-Loadbearing SFS In-fill System