NBS Source
I'm a manufacturer

The Shard

OVERVIEW

Completed in July 2012 the Shard was in construction for 3 years. Grainger’s, are proud to say we supplied our perimeter access flooring pedestals on several their exposed levels. This helps to create the unique shape of the shard. Access flooring has provided over 200 miles of wiring to be hidden underfoot. Making Irvine Sellar's ambition to create such a luxurious space into a reality. 95% of construction material were recycled during the fit out. Including 95% recycled content in pedestals.

Back in 2015, the Grainger family celebrated a 21st Birthday, visiting the Shard. 360 views of the capital, on a clear day provided outstanding memories for such a special occasion. Whilst looking out it was easy to spot various other jobs and projects we had worked on over the years. We were all proud to be a part of the making of The Shard.


Products featured in this case study

View all products (4)
X Pedestal Range

X Pedestal Range

More case studies from Isaac H Grainger & Son Ltd

View all case studies (3)
The Cube

The Cube

Birmingham Library

Birmingham Library

More case studies from Access floor pedestals

View all case studies (3)
The Cube

The Cube

Birmingham Library

Birmingham Library