NBS Source
I'm a manufacturer

This case study is no longer available.

Profab provide a sound solution for ceiling access at Battersea Power Station development.

OVERVIEW

Profab were approached by Simpson Haugh Architects to provide acoustic ceiling access panels for use on Phase 1 of the Battersea Power Station development. As a luxury residential development, it was vital that the panels combined both performance and aesthetics. We developed an access panel which could be manufactured in single or multiple leaf configurations, could be operated on hidden push catches, and which also included a full acoustic gasket seal. The product was successfully tested at The Technology Centre to meet the project requirements, and we are happy to be supplying this quality product to such a prestigious project.

No featured products in this case study

Contact Profab Access Ltd by clicking the button below to find out which products were used in this case study.

More case studies from Profab Access Ltd

View all case studies (15)
Profab Access Ahead of the Curve with Fire Testing

Profab Access Ahead of the Curve with Fire Testing

Three brands, one objective – safe access all areas

Three brands, one objective – safe access all areas

Parkgate Hotel, Cardiff

Parkgate Hotel, Cardiff

Aungier Street Student Accommodation

Aungier Street Student Accommodation