This case study is no longer available.
OVERVIEW
London Stadium (formerly and also known as Olympic Stadium) is a multi-purpose outdoor stadium at Queen Elizabeth Olympic Park London.
Project/doors:
21 Fire and Security shutters (2010)
50+ Fire and Security shutters (2015)
The challenge
Hart assisted with the specification prior to the award. Technical collaboration was ongoing ensuring that integration and operation of the shutters went smoothly with safety and continuity in mind. Hart was subject to strict working practices and the factory was visited to review progress and audit Hart's quality system procedures.
The solution
2010 - Manufacture, supply, deliver and install 21 Fire Resistant and Security Shutters to the Olympic Main Stadium requiring advance battery backup and operational features. 2015 - Manufacture, supply, deliver and install over 50 Security and Fire shutters to the new build including kiosk shutters, security entrances and POD buildings surrounding the arena.
The success
Hart was chosen out of 50+ door companies to supply all of the roller shutters to the London 2012 Olympic main stadium. Hart was again awarded all of the roller shutters under much competition on the stadium transformation project in 2015 which was transformed to cater for the multi-use environment.
The review:
“You should be commended for the cooperation, commitment and effort applied by your entire team. From early design discussions to your final commissioning activities of the 50 new shutters onsite, it was a pleasure to work with such proactive and knowledgeable organisation.” Jon Pepper, Project Manager, Balfour Beatty
Contact Hart Door Systems Ltd by clicking the button below to find out which products were used in this case study.
Jaguar Land Rover
Required Testing and Certification Regime For CE marked fire shutters
HSBC UK
ExCel London Phase II - Fireroll Acoustic