This case study is no longer available.
OVERVIEW
Project Architects GPAD London put forward a brief for the cycle storage facility on the 10, Victoria Street project which required a self-contained unit that could house a large number of cycles within a compact footprint, without compromising the design aesthetic of the surrounding scheme.
Contact urbanspec by clicking the button below to find out which products were used in this case study.
Unit 2, Watchmoor Point
West House, Orpington
Cathedral Hill Industrial Estate, Guildford
University of Nottingham