OVERVIEW
Working on our home turf, Lionweld Kennedy were contracted by Middlesbrough Football Club to design, fabricate and supply vital walkways, handrails, press platforms and vomitory stairs.
It is vital for clubs such as Middlesbrough FC to have accessible and safe walkways due to the crowds which can be expected.
Opened in August 1995, the now 34,742 capacity stadium, was built in only 32 weeks. At the time it was the biggest new football stadium to be built since the war.
Along with the Transporter and Newport bridges, the Riverside Stadium is one of the landmarks of the Middlesbrough skyline.
Lionweld Kennedy are based in Middlesbrough, with many members of our team supporting the club, therefore we were more than excited to get started on the work for the stadium.
Steel Stair Treads - 20mm Ball Proof - Open Steel Grating
Safegrid Forge Welded Steel Grating - 20mm Ball Proof - Steel Grating and Open Mesh Flooring
Safegrid Forge Welded Steel Grating - 35mm Ball Proof - Steel Grating and Open Mesh Flooring
Steel Stair Treads - 35mm Ball Proof - Open Steel Grating
Handrail Tubular Stanchions
Chirag Oil Field
GDF Suez Cygnus Bravo
Shah Deniz
Solan Topside
Stauning Whisky’s distillery - gratings
New Air BP Jet Fuel Station - plank gratings
HMS Victory - plank gratings
Platforms and stairs for grandstand systems - plank gratings
ASF 5006 Handrailing at Bradford Library Steps
ASF 5006 post and rail, post and panel and step handrailing, Sale Town Hall
White City, London. Illuminated handrailing
Hilton Garden Inn, Terminal 2, Heathrow Airport
New Air BP Jet Fuel Station - plank gratings
Chirag Oil Field
Clair Ridge Oil Field
North Pole Depot