WHEN WAS THE PROJECT? June 2018 WHERE IS THE PROJECT? Longhammarvegan, Haugesund WHAT WAS THE BRIEF? WHAT WAS DESIGNED AND INSTALLED? Metalform produced full turnkey design, fab and install steel and glass solution with fixed header and fixed side fields – including double door.
Contact Metalform Group Ltd by clicking the button below to find out which products were used in this case study.
Olivia's Place
Oslo Loft
Jan's Place
Tine's Place