CPS Manufacturing was awarded the seating and staging contract for the 2012 main media and press hub. 1,000 Cadet C6 chairs were installed in the media centre. The chair is cost-effective and durable. CPS also designed, manufactured and installed the purpose-built staging system.
Contact CPS Manufacturing Co LLP by clicking the button below to find out which products were used in this case study.
Alexandra Palace Theatre Restoration Seating, Orchestra Pit and Staging
Villa Cross Church of God Prophecy Auditorium Seating
Exeter Cathedral Staging
Grimsby Leisure Centre Swimming Pool Spectator Seating