Manchester Arena, managed and operated by SMG Europe, is one of the busiest venues in the world, and the largest indoor arena in Europe. A leaky roof, specifically in the area where the existing roof of the arena joined the railway station, was causing real concern and disruption.
Following the roof survey, the Technical Team created a bespoke specification, including project specific detail drawings, tapered insulation plans and roof layouts, U-Value Calculations, Wind Uplift Calculations and Condensation Risk Analysis.
No featured products in this case study
Contact Sika Sarnafil by clicking the button below to find out which
products were used in this case study.