NBS Source
I'm a manufacturer

This case study is no longer available.

Bath Rugby Club use Magply on Light Gauge Steel Frame

OVERVIEW

Arena 1865 had to take several design criteria into consideration including provision of fire protection to safeguard the 4,500 spectators the steel framed structure can accommodate, while rigidity, all round durability and ease of installation were important. Simon Pugh-Jones outlined ‘We looked at a full range of board solutions including high performance gypsum and recycled plastic, but when we got into the science and the costings, it soon became clear the only board which ticked all the boxes was Magply’. Some 2000 m2 of the Magply 9mm boards were consumed in the main passageway beneath the Stand.

No featured products in this case study

Contact IPP Ltd by clicking the button below to find out which products were used in this case study.