Heat Mat ramp heating system installed at the Waste Recycling Group's Greatmoor Energy from Waste Facility, Buckinghamshire

OVERVIEW

The facility will convert 300,000 tonnes of household waste to electricity and hot-water. The structure incorporates a ramp for vehicles to access the incinerator entrance. Contractor Sir Robert McAlpine approached Heat Mat to supply and oversee installation of a ramp heating system for the entrance, allowing year-round access. Specialist constant-Wattage cables with 10m cold tail connections were installed beneath a 210mm concrete and rebar slab. Dual-zone thermostats will control them, and external sensors will monitor conditions for maximum efficiency. Heat Mat will return to the site, due for completion in late 2015, for final commissioning.