NBS Source
I'm a manufacturer

Geschwender Lockers at Nottingham Emmanuel School

OVERVIEW

Installer: LSA Projects Ltd and Geschwender

Product: Geschwender Lockers and Metra Locking System

LSA supplied almost 1000 lockers to Nottingham Emmanuel High School as part of a regeneration project in 2008. The lockers were commissioned by the school and designed by Geschwender to make the most of the space available in the curved concourse of the school.

Lockers were also installed with Metra electronic locking, the school chose an RFID system which used the students existing ID cards to open their allocated locker when presented to the central access panel. Using existing cards meant that the school had minimal ongoing running costs as cards can be set-up and replaced by school staff without needing to order replacement keys or locks for students.

Electronic locking also makes locker allocation and re-allocation easy and straightforward, master computers are managed by the school allowing remote access to lockers for changing user access settings and opening individual lockers without the key card if required.

Products featured in this case study

View all products (19)
Geschwender Lockers

Geschwender Lockers

More case studies from LSA Projects Ltd

View all case studies (51)
University of Bedford Luton Campus

University of Bedford Luton Campus

St Johns School Leatherhead

St Johns School Leatherhead

Orchard Brae School

Orchard Brae School

Wymondham Leisure Centre

Wymondham Leisure Centre

More case studies from Lockers

View all case studies (35)
Investment bank project, Lockers

Investment bank project, Lockers

Laminate Lockers & Z Lockers at 72 Welbeck Street, London

Laminate Lockers & Z Lockers at 72 Welbeck Street, London

Heated Lockers at the Innovation Hub, Production Park

Heated Lockers at the Innovation Hub, Production Park

Ipswich Town Football Club Project

Ipswich Town Football Club Project