NBS Source
I'm a manufacturer

"elevation"

58 results found

Sort by:

Showing 1-7 of 7

Sponsored
Fire Resistive Curtain Wall at Aspen Art Museum

Fire Resistive Curtain Wall at Aspen Art Museum

SAFTI FIRST

Designed by Pritzker prize winning architect Shigeru Ban, the brand new 33,000 sf Aspen Art Museum boasts large exterior glass walls designed to keep the visitors engaged with views of the beautiful Aspen landscape. SAFTI FIRST®’s engineering team provided design assistance and supplied a 2 hour fire resistive curtain wall with SuperLite® II-XL 120 with Starphire Ultra-Clear Glass insulated with Viracon VE13-85 in GPX® Curtain Wall Framing. A woven screen encloses the glass curtain wall to provide shading from direct sunlight.
Sponsored
Porsche Design Tower Sets a New Standard of Cool with the Help of Fire Rated Glass

Porsche Design Tower Sets a New Standard of Cool with the Help of Fire Rated Glass

SAFTI FIRST

Perhaps no other residential high-rise has created more buzz than the highly-anticipated Porsche Design Tower in Sunny Isles, Florida. A collaboration between Dezer Development and the Porsche Design Group, the 60-story, 132-residence luxury tower designed by Sieger Suarez Architects promises to deliver a new standard of cool.
Sponsored
San Diego Highrise Uses Fire Rated Glass on South Facade

San Diego Highrise Uses Fire Rated Glass on South Facade

SAFTI FIRST

Because the Sapphire Towers' south facing elevation was in close proximity to the adjacent property, code regulations required the south façade to either be solid, which was contrary to the design, or to have openings with a minimum fire protection of 45 minutes. SAFTI FIRST® engineered a system that met the uniform design demands and performance requirements for the windows and balconies in all 32 floors in the south-facing elevation.
Sponsored
Fire Resistive Curtain Wall at NYC Midtown Community Court

Fire Resistive Curtain Wall at NYC Midtown Community Court

SAFTI FIRST

The 1890s-era Midtown Community Court in New York City—a New York Historic Landmark—is currently undergoing a five year, $18 million renovation that includes a 9,650-square-foot addition for a new elevator, lobby and stairwell featuring fire resistive glass and curtain wall. The system consists of SAFTI FIRST®’s SuperLite® II-XL 120 IGU in GPX® Curtain Wall System.
Sponsored
Boston Building Protects Property Line with Fire Resistive Curtain Wall

Boston Building Protects Property Line with Fire Resistive Curtain Wall

SAFTI FIRST

The west-facing elevation of The Kensington in Boston, MA, was in close proximity to the property line, prompting the building official to require part of the curtain wall had to meet ASTM E-119/NFPA 251/UL263 for 60 minutes. SAFTI FIRST® supplied SuperLite® II-XL 60 insulated with Solarban 70XL in GPX® Curtain Wall Framing in a continuous span from the seventh to the tenth floors.
Sponsored
Glass Curtain Wall Lets Light In and Keeps Fire Out

Glass Curtain Wall Lets Light In and Keeps Fire Out

SAFTI FIRST

Prairie Hills Junior High School's south-facing elevation features a glazed aluminum curtain wall that incorporates PPG Solarblue and PPG Solarban 60 glazing. Parts of the curtain wall had to meet a two-hour rating because it was adjacent to a two-hour block wall through the building's interior. SAFTI FIRST® supplied SuperLite® II-XL 120 IGU in GPX® Curtain Wall Framing in order to meet ASTM E-119/NFPA 251/UL263 requirements.
Sponsored
Crosstown Condos - 844 Don Mills

Crosstown Condos - 844 Don Mills

Envirospec

Crosstown Condos, a landmark development in Toronto’s Don Mills neighbourhood, represents the future of modern urban living, blending quality construction, sustainability, and thoughtful design. Set adjacent to the upcoming Eglinton Crosstown LRT Line 5, the community offers seamless transit connectivity alongside state-of-the-art amenities.At the core of its expansive outdoor terraces and rooftop patios lies Envirospec’s Canadian-made PAVE-EL Pedestal system, a solution that proves smart infrastructure can deliver long-term value.Challenge:The project included large outdoor amenity spaces across multiple residential towers. These spaces required a raised pedestal system that could ensure perfect levelling, long-term durability, effective drainage, and performance in all seasons — all while being cost- and material-efficient.Solution:Envirospec’s PAVE-EL Pedestal system was selected for its precision engineering, durability, and ease of installation. Unlike screwjack systems that require full pedestals throughout, PAVE-EL’s modular approach allowed installers to use half pedestals along patio edges and quarter pedestals in corners, reducing material requirements significantly.This not only cut material waste but also reduced installation time and labour costs, with installation completed in approximately one-third the time compared to traditional systems. Backed by a 40-year track record of zero product failures and a 25-year warranty, PAVE-EL offers peace of mind along with proven long-term performance. Outcome:Material Savings: Smart use of half and quarter pedestal sizes reduced overall pedestal material needs.Cost & Time Reduction: Faster, simpler installation led to lower labour costs and project efficiency, allowing construction teams to move on to the next stage of the project more quickly.Performance: Patios achieved perfect levelling and drainage, enhancing resident comfort, enjoyment and outdoor usability.Sustainability: The polyethylene-based system is designed to last over 100 years, with a 25-year warranty, aligning with the development’s long-term sustainability goals and reducing environmental impact. Withstands all natural temperatures on Earth. Made in Canada: Supporting local innovation and supply chain reliability.By leveraging the versatility and durability of the PAVE-EL system, Crosstown Condos showcases how innovative construction solutions can elevate both form and function in modern developments.

Showing 1-7 of 7

Feedback