NBS Source
I'm a manufacturer

"public address systems"

248 results found

Sort by:

Showing 1-29 of 29

Sponsored
Fire Rated Glass Contributes to Salt Lake City Public Safety Building’s Sustainable and Resilient Design Goals

Fire Rated Glass Contributes to Salt Lake City Public Safety Building’s Sustainable and Resilient Design Goals

SAFTI FIRST

The Salt Lake City Public Safety Building in Utah is the first U.S. Public Safety Building to achieve both a net-zero rating and LEED Platinum status and designed to survive a 7.5 magnitude earthquake and remain fully functional afterwards. This ensures that the city’s emergency operations center can survive and help the city recover in the event of an earthquake or a similar disaster. Fire rated glass contributes to achieving sustainable design goals by maximizing daylight penetration deep within a building and shared artificial lighting between spaces. It also ensures that occupants can exit the building safely in the event of an earthquake, which can damage sprinkler systems and render them ineffective.
Sponsored
LEEDing with STEEL 2009

LEEDing with STEEL 2009

Trimet Building Products

Buildings have a profound impact on our natural environment, economy, health and productivity. In North America, the built environment accounts for approximately one-third of all greenhouse gas emissions, energy, water and material consumption and generates similiar proportions of pollution. Indoor air quality is regarded as one of the top environmental health risks today, affecting the well-being, productivity and performance of many people. As concerns increase about sustainability in building design and operation, there is a need to develop a framework for assessing and quantifying buildings so that questions such as, “What is sustainable design?” and “How green is this project?” can be addressed. In response to this, the Leadership in Energy and Environmental Design (LEED) green building rating system was developed to provide such a framework for North America. This document explores how the use of steel structures and components can contribute to achieving a LEED certificate for a building.
Sponsored
How To Series - Pre-finished Sheet Steel for Retrofit

How To Series - Pre-finished Sheet Steel for Retrofit

Trimet Building Products

Preface This How To Series publication is an educational tool intended to give guidance to anyone specifying sheetsteel building products. This particular publication deals with the retrofit of the building envelope utilizing sheet steel. This is a generic guide giving the basic details and should only supplement the specific recommendations or design guidance published by the manufacturer appropriate to their own products. The material presented in this publication has been prepared for the general information of the reader. While the material is believed to be technically correct and in accordance with recognized good practice at the time of publication, its should not be used without first securing competent advice with respect to its suitability for any specific application. Neither the Canadian Sheet Steel Building Institute norites Members warrant or assume liability for the suitability of the material for any general or particular use.
Sponsored
How to series: Light Gauge Steel Roofing and Siding

How to series: Light Gauge Steel Roofing and Siding

Trimet Building Products

Preface One of the objectives of the CSSBI and its members is the development of standards and technical publications that promote safety, performance and good practice. This "How To Series" of publications is an educational tool intended to give guidance to anyone specifying sheet steel building products. This particular publication is published as an aid to building owners as well as roofing and siding installers. It offers simple and practical recommendations for the selection, application and installation of light gauge steel cladding. This is a generic guide giving the basic details and should only supplement the specific recommendations or guidance published by the manufacturer appropriate to their own products. The views expressed in this guide are a collection of installation techniques and do not necessarily reflect those of all member companies of the CANADIAN SHEET STEEL BUILDING INSTITUTE. The material presented in this publication has been prepared for the general information of the reader. While the material is believed to be technically correct and in accordance with recognized good practice at the time of publication, it should not be used without first securing competent advice with respect to its suitability for any specific application. Neither the CANADIAN SHEET STEEL BUILDING INSTITUTE nor its Members warrant or assume liability for the suitability of this bulletin for any general or particular application.
Sponsored
Care and Maintenance of Prefinished Sheet Steel
Building Products

Care and Maintenance of Prefinished Sheet Steel Building Products

Trimet Building Products

Introduction Prefinished sheet steel building products, such as wall and roof cladding, liner sheet, flashing, and associated items, have experienced an enviable growth record during the past twenty years or so. Coil coated prefinished sheet steel in a variety of colours and paint systems has greatly enhanced the appearance of thousands of industrial, commercial, institutional, recreational, residential and farm buildings, providing an economical, durable and attractive alternative to traditional materials. As with all materials, a little care and maintenance pays off handsomely in terms of longevity and repair costs. The recommendations which follow have been learned at first hand and represent the collective industry experience with thin-film paint systems applied to metallic coated sheet steel by the coil coating process. In this publication the term “thin-film paint system” refers to a modified silicone polyester or a fluorocarbon type having a coating thickness about 25µm. When the guidelines listed below have been observed, thin-film paint systems have been used successfully for all types of environments other than severe industrial atmospheres which require special consideration. The guidelines are not intended for barrier coatings, laminates, and new formulations which have different characteristics than the thin-film paint systems on which these guidelines are predicated. 
Sponsored
CSSBI SSF 33-11:
Wet Storage Staining of Galvanized and Galvannealed Steel Sheet

CSSBI SSF 33-11: Wet Storage Staining of Galvanized and Galvannealed Steel Sheet

Trimet Building Products

Introduction Most cold formed steel building products, whether painted or unpainted, are manufactured from a sheet steel material that has some form of metallic coating applied. This metallic coating can be zinc (galvanized), zinc-iron alloy (galvanneal) or a 55% aluminum-zinc alloy (GalvalumeTM). The metallic coating is available in a range of thicknesses to provide the degree of corrosion protection and service life required. One of the concerns expressed by installers relates to the presence of wet storage staining on the products, how this staining impacts the long term performance, and what can be done to remove it. The purpose of this fact sheet is to address some of these issues, allay some fears, and give guidance on proper storage techniques.
Sponsored
USA-made Fire Rated Glass Helps UC Merced Achieve Triple Zero Sustainability

USA-made Fire Rated Glass Helps UC Merced Achieve Triple Zero Sustainability

SAFTI FIRST

The Merced 2020 Project, an ambitious, $1.2B, extensive expansion of the UC Merced campus, is “the largest public-private partnership social infrastructure project completed in U.S. history,” according to the university’s website. This includes new facilities used for academic, administration, laboratories, housing and recreation. This was truly exciting, and it struck a chord with SAFTI FIRST® because Merced is home to our manufacturing facilities.
Sponsored
Fire Rated Glass Helps SFPUC Building Achieve LEED Platinum

Fire Rated Glass Helps SFPUC Building Achieve LEED Platinum

SAFTI FIRST

The new San Francisco Public Utilities Commission Headquarters combines maximum daylighting and fire safety with a multi-story, fire rated glass stairwell from SAFTI FIRST. Dubbed as the "greenest building in North America," this Class A LEED Platinum office building features a transparent, 2-hour fire rated stairwell, situated prominently near the main entrance. SAFTI FIRST supplied SuperLite II-XL 120 in GPX Architectural Series Wall Framing and SuperLite II-XL 90 in GPX Builders Series Temperature Rise Door starting from the lobby all the way to the topmost floor.
Sponsored
Casa Loma, Toronto

Casa Loma, Toronto

ACO Canada

Casa Loma is a Gothic Revival castle-style mansion and garden in midtown Toronto, Ontario, Canada, that is now a historic house museum and landmark. It was constructed from 1911 to 1914 as a residence for financier Sir Henry Pellatt.Part of the renovations carried out was improving the water management on the exterior terrace located at the back of the building. The requirement was for the stormwater to be collected and disposed of efficiently without creating an unsightly 3D grading of the terrace surface. Linear drainage was the natural selection.ACO KlassikDrain KS100 was chosen for its robustness and ability to withstand Canadian weather conditions. The perforated stainless steel grate will resist corrosion and it is AODA and heelproof compliant, important requirements for this public venue.
Sponsored
Steel: unparalleled fire safety

Steel: unparalleled fire safety

Trimet Building Products

Steel: unparalleled fire safety Life safety, and specifically fire protection, has been a primary concern of the building codes. Steel is a non-combustible material and consequently does not burn, provide an ignition source or add fuel load that would enable a fire to spread or grow into a catastrophic event. Steel does not melt at temperatures typically encountered in a building fire. Its non-combustibility and assembly fire ratings do not degrade over the lifecycle of a building. This provides a reduced fire risk, to workers and occupants, minimizes the impact on municipal fire services, decreases the reliance on sprinklers, and results in less property damage and collateral damage to adjacent buildings if a fire should ever occur. • Steel has a melting point of approximately 1,500ºC (2,700ºF). In a typical fire, such as in an office, residential or retail occupancy, the maximum temperature of a fully developed fire will not likely exceed a range of 800ºC to 900ºC (1,500ºF to 1,650ºF), though it could reach a peak of 1,100ºC (2,000ºF) for a short duration. • Building codes recognize the fact that buildings, designed with non-combustible materials like steel, pose less of a fire risk to the public than combustible systems, which are limited to six storeys in height in Canada and 25.9m (85 ft.) in the US. STEEL IS A NON-COMBUSTIBLE MATERIAL AND CONSEQUENTLY DOES NOT BURN, nor does it provide an ignition source or add fuel load that would enable a fire to spread or grow into a catastrophic event. “Changes in the building codes that allow combustible framing in taller and larger buildings have gone too far and it’s created a perfect storm that can quickly overwhelm the ability of the fire service to respond.” CHIEF STEVE LOHR, HAGERSTOWN (MD) FIRE DEPARTMENT
Sponsored
CSSBI 22M-2017:
Standard for Residential Steel Roofing

CSSBI 22M-2017: Standard for Residential Steel Roofing

Trimet Building Products

PREFACE One of the objectives of the Canadian Sheet Steel Building Institute is the development of product standards to promote safety and sound construction practices. This Standard is intended to assist specifiers, designers, buyers, manufacturers, and erectors of sheet steel cladding by providing information which can be adopted by reference where desired. The requirements contained herein are in accordance with sound engineering principles, augmented by experience. They include recommended minimum requirements for such factors as grade of steel, thickness, metallic coating designation, loading and deflections, as well as design, fabrication and erection in general. While the material is believed to be technically correct and in accordance with recognized practice at the time of publication it does not obviate the need to determine its suitability for a given situation. Neither the Canadian Sheet Steel Building Institute nor its members warrant or assume liability for the suitability of the material for any general or particular application. 
Sponsored
CSSBI 23M-2016:
Standard for Residential Steel Cladding

CSSBI 23M-2016: Standard for Residential Steel Cladding

Trimet Building Products

PREFACE One of the objectives of the Canadian Sheet Steel Building Institute is the development of product standards to promote safety and sound construction practices. This Standard is intended to assist specifiers, designers, buyers, manufacturers, and erectors of sheet steel cladding by providing information which can be adopted by reference where desired. The requirements contained herein are in accordance with sound engineering principles, augmented by experience. They include recommended minimum requirements for such factors as grade of steel, thickness, metallic coating designation, loading and deflections, as well as design, fabrication and erection in general. While the material is believed to be technically correct and in accordance with recognized practice at the time of publication it does not obviate the need to determine its suitability for a given situation. Neither the Canadian Sheet Steel Building Institute nor its members warrant or assume liability for the suitability of the material for any general or particular application. 
Sponsored
CSSBI 20M-2017:
Standard for Sheet Steel Cladding for Industrial, Commercial and Institutional Building Applications

CSSBI 20M-2017: Standard for Sheet Steel Cladding for Industrial, Commercial and Institutional Building Applications

Trimet Building Products

PREFACE One of the objectives of the Canadian Sheet Steel Building Institute is the development of product standards to promote safety and sound construction practices. This Standard is intended to assist specifiers, designers, buyers, manufacturers, and erectors of sheet steel cladding by providing information which can be adopted by reference where desired. This Standard replaces the previous edition dated November 2015. The requirements contained herein are in accordance with sound engineering principles, augmented by experience. They include recommended minimum requirements for such factors as grade of steel, thickness, metallic coating designation, loading and deflections, as well as design, fabrication and erection in general. While the material is believed to be technically correct and in accordance with recognized practice at the time of publication it does not obviate the need to determine its suitability for a given situation. Neither the Canadian Sheet Steel Building Institute nor its members warrant or assume liability for the suitability of the material for any general or particular application.
Sponsored
CSSBI SSF 42-15:
Fastening Prepainted Sheet Steel Roofing and Siding

CSSBI SSF 42-15: Fastening Prepainted Sheet Steel Roofing and Siding

Trimet Building Products

Introduction Sheet steel roofing and siding (cladding) is available in a wide variety of profiles, colours and paint systems. The modern prepainted systems used on Canadian-made products will provide decades of beautiful performance before there are any visible signs of deterioration of the paint surface. However, an important component of the cladding system is the fastener used to attach it to the structure. This fastener is not simply a screw; it is part of the roof or wall assembly and should be expected to provide the same long-term performance. This performance is not simply the capacity to safely hold the cladding in place, but also to match the colour and durability of the paint system. The selection of the correct screw for the job is the first step in the creation of a cladding system that will provide long-term performance. The next step is the installation. Installing screws in sheet steel cladding is commonplace and can be done very efficiently. The tool manufacturers have developed a wide range of options for installing fasteners into any type of substrate. Selecting the most appropriate tool will help the installation process.
Sponsored
GPX® Framing with Sunshade Connectors at Doolittle BART Station

GPX® Framing with Sunshade Connectors at Doolittle BART Station

SAFTI FIRST

For BART's Doolittle Maintenance Facility at the new Oakland Airport connector, SAFTI FIRST® provided 60 minute, fire resistive wall openings in the exterior using SuperLite® II-XL 60 insulated with low-e glazing in GPX® Framing with a clear anodized finish. SAFTI FIRST® engineered a connection that allows the structural elements of the GPX® Architectural Series Framing System to support an integral sunshade system, instead of being hung in front of it. The Doolittle Bart Station is one of the first installations of the GPX® Architectural Series System with sunshade connections, which also include SLCC New Instruction and Administrative Building in Salt Lake City, UT.
Sponsored
Cost Considerations for
Prepainted Sheet Steel Cladding

Cost Considerations for Prepainted Sheet Steel Cladding

Trimet Building Products

This Fact Sheet has been written to describe some of the factors that affect the cost of prepainted sheet steel cladding products. The most significant factors are: colour, paint system, order quantity, Fabricator's inventory and profile selection. Recognition of the impact of these factors can help you select a prepainted sheet steel cladding system to fit the aesthetic and durability requirements of your project, and still stay within a budget. 
Sponsored
Fire Resistive Curtain Wall at NYC Midtown Community Court

Fire Resistive Curtain Wall at NYC Midtown Community Court

SAFTI FIRST

The 1890s-era Midtown Community Court in New York City—a New York Historic Landmark—is currently undergoing a five year, $18 million renovation that includes a 9,650-square-foot addition for a new elevator, lobby and stairwell featuring fire resistive glass and curtain wall. The system consists of SAFTI FIRST®’s SuperLite® II-XL 120 IGU in GPX® Curtain Wall System.
Sponsored
Rockwool and Passive Purple

Rockwool and Passive Purple

Intelligent Membranes Canada

Case study of Rockwool and Passive Purple together in a system and how together they are the perfect match for airtight buildings.
Sponsored
Skyline Lodge - Highlands, NC, USA.

Skyline Lodge - Highlands, NC, USA.

Mapei Inc.

MAPEI’s Mapeheat™ radiant floor-heating system adds an extra touch of luxury to a five-star lodge.
Sponsored
Passivhaus CPD Training Facility

Passivhaus CPD Training Facility

Intelligent Membranes Canada

We built the world first Passivhaus CPD training facility / pub, this is the worlds most airtight pub at 0.07ach at 50 pa. This is a twin wall timber frame, it’s 450mm wide insulation Huntsman which is made of thousands of recycled plastic bottles. Huntsman also recycled 1 billion plastic bottles from the sea last year. We have a 7.2 KW system solar panels system that powers the building, it’s got MVHR Nilan. On the external façade we applied Passive Purple External which is airtight up to 0.03ach.
Sponsored
Repainting Factory
Prefinished Metal Panels

Repainting Factory Prefinished Metal Panels

Trimet Building Products

Introduction Prefinished sheet steel is used on many building products from wall cladding, to architectural roofing to interior panels. Prefinished sheet steel has been used in Canada for over 30 years and there may be sites were the paint surface is in need of repainting. This bulletin is intended to give some guidance on repainting prefinished panels. Due to the diversity of factory applied prefinished systems, and the diversity of potential field applied repaint systems, it is impossible to offer one comprehensive repaint procedure for all possible situations. However, it is possible to offer a set of guidelines to be considered in every potential situation.
Sponsored
CSSBI SSF 21-06:
Low Sloped Steel Roofing - The Winners in Life Cycle Cost Analysis

CSSBI SSF 21-06: Low Sloped Steel Roofing - The Winners in Life Cycle Cost Analysis

Trimet Building Products

An independent assessment of the life cycle cost for various low slope roof systems revealed that steel roofing had the longest life span, no leaks due to material failures, and the lowest overall maintenance cost.
Sponsored
CSSBI S8-2018:
Quality and Performance Specification for Prefinished Sheet Steel Used for Building Products

CSSBI S8-2018: Quality and Performance Specification for Prefinished Sheet Steel Used for Building Products

Trimet Building Products

1. SCOPE 1.1 The following specifications shall apply to hot-dipped metallic-coated sheet steel prefinished with colours of proven durability and suitable for exterior exposure as delivered from the coil coater. Proven paint systems for building products have been designed for vertical applications whose surfaces are no more than 30° to the vertical and non-vertical applications whose surfaces ranging from 5° up to 60° to the horizontal. It is not recommended for aggressive atmospheric exposure. 1.2 The prefinish system shall consist of a primer and topcoat continuously applied and cured within the paint manufacturer’s specifications on cleaned, pretreated, metallic-coated substrate. The pretreatment specified shall be zinc phosphate for galvanized steel and metal oxide pretreatment for aluminum-zinc alloy-coated steel, applied in accordance with the pretreatment manufacturer’s specifications.
Sponsored
A Clear Solution for Harvard’s Klarman Hall

A Clear Solution for Harvard’s Klarman Hall

SAFTI FIRST

This new 120,000 square foot, state-of-the-art convening center features a 1,000-seat auditorium that is large enough to host the entire MBA class. The glass atrium floods the multi-purpose lobby with natural light, as well as provides a visual connection between the interior of the building and the outdoor environment. To maximize transparency, SAFTI FIRST® met with the architects during the design phase to create a large, 2-hour, glass wall that separates the lobby from the auditorium while providing a visual connection between them. Since this 2-hour glass wall also serves as the entrance to the auditorium, deciding on a 90-minute door system was of upmost important. SAFTI FIRST®’s in-house engineering department provided design assistance, system details, engineering calculations and support from the planning phase all the way to the submittal process.
Sponsored
Real Steel Cost Advantages – Consider. Choose. Challenge.

Real Steel Cost Advantages – Consider. Choose. Challenge.

Trimet Building Products

Start at the foundation where the loads imposed by a steel frame are up to 50% less than those of a concrete alternative. There is evidence in the field and through third-party case studies and comparative cost studies that steel building systems offer significant cost benefits over competitive building materials when the total cost of construction is considered.
Sponsored
San Diego Highrise Uses Fire Rated Glass on South Facade

San Diego Highrise Uses Fire Rated Glass on South Facade

SAFTI FIRST

Because the Sapphire Towers' south facing elevation was in close proximity to the adjacent property, code regulations required the south façade to either be solid, which was contrary to the design, or to have openings with a minimum fire protection of 45 minutes. SAFTI FIRST® engineered a system that met the uniform design demands and performance requirements for the windows and balconies in all 32 floors in the south-facing elevation.
Sponsored
Lofts du Village Mapeheat Installation – Chelsea, QC, Canada

Lofts du Village Mapeheat Installation – Chelsea, QC, Canada

Mapei Inc.

When the people of Canada’s capital region seek relief from city life, they often retreat to the serene, natural beauty found in Quebec’s Gatineau hills. Here, where temperatures can drop to -38°F (-39°C) and snow falls seven months out of the year, heated flooring is a practical luxury. To help recreate a Scandinavian-style getaway for the Groupe Nordik Lofts du Village project, specifiers chose one of MAPEI’s Mapeheat floor-heating systems.
Sponsored
Utah Business School Features Dramatic Fire Rated Glass Wall

Utah Business School Features Dramatic Fire Rated Glass Wall

SAFTI FIRST

The David Eccles School of Business on the University of Utah campus features a 28- x 18-ft 2 hour interior glass wall with a 90 minute full-vision door in an exit enclosure/stairwell. The architects selected fire rated glass to meet fire rating requirements while providing maximum visibility and natural daylighting in the space. The project’s specifications also required the fire rated glass to have the same optical clarity as the adjacent non-rated glass systems.
Sponsored
Fire Rated Glazing Adds Visual Appeal to Parking Garages

Fire Rated Glazing Adds Visual Appeal to Parking Garages

SAFTI FIRST

Codes required fire wall separations between parking garages and businesses, markets, homes and other uses. Architects can replace entire walls with glass to open up buildings like never before. For example, SuperLite® II-XL in GPX® Architectural Series Framing by SAFTI FIRST® is a USA-made fire resistive transparent wall system that blocks radiant heat and meets the same stringent ASTM E-119/ UL 263/ NFPA 251 code requirements that any opaque fire rated wall must meet.

Showing 1-29 of 29

Feedback