NBS Source
I'm a manufacturer

""

2,352 results found

Sort by:

Showing 37-72 of 110

Sponsored
Fire Rated Curtain Wall Performance in Dramatic Weather Conditions

Fire Rated Curtain Wall Performance in Dramatic Weather Conditions

SAFTI FIRST

As far as extreme environments go, Wisconsin has some of the most dramatic in North America. During the winter months, temperatures regularly dip well below freezing, and in the summer months the temperatures can reach up to 90 degrees Fahrenheit with significant humidity levels for extended periods of time. Given these dramatic weather conditions, the materials chosen for the building envelope should not only protect building occupants from the elements, but ensure their comfort as well.
Sponsored
New 45 Minute Fire Rated Glass Makes Visual Connectivity Possible, Beautiful and Affordable at Campus Housing

New 45 Minute Fire Rated Glass Makes Visual Connectivity Possible, Beautiful and Affordable at Campus Housing

SAFTI FIRST

The design limitations of fire rated ceramic glass have finally given way to a revolutionary new product like SuperClear® 45-HS-LI, a truly clear 45 minute fire rated glass that meets all fire, safety and hose stream requirements at a fraction of the price of ceramics. See how the design team at EYP used SuperClear® 45-HS-LI to their advantage at the 1,197-bed Quad on the University of Houston campus.
Sponsored
Cost Considerations for
Prepainted Sheet Steel Cladding

Cost Considerations for Prepainted Sheet Steel Cladding

Trimet Building Products

This Fact Sheet has been written to describe some of the factors that affect the cost of prepainted sheet steel cladding products. The most significant factors are: colour, paint system, order quantity, Fabricator's inventory and profile selection. Recognition of the impact of these factors can help you select a prepainted sheet steel cladding system to fit the aesthetic and durability requirements of your project, and still stay within a budget. 
Sponsored
CSSBI 21M-2017:
Standard for Steel Farm Roofing and Siding

CSSBI 21M-2017: Standard for Steel Farm Roofing and Siding

Trimet Building Products

PREFACE One of the objectives of the Canadian Sheet Steel Building Institute is the development of product standards to promote sound construction using safe building practices. This Standard is intended to further this objective by providing to buyers, manufacturers and installers of steel farm roofing and siding, information which can be used or adopted by reference where desired. The requirements contained herein are in accordance with accepted engineering principles, augmented by experience. They include recommendations covering steel thicknesses, minimum metallic coating designations, as well as design, manufacture and installation in general.
Sponsored
Environmental Product Declaration 
Roll Formed Steel Panels

Environmental Product Declaration Roll Formed Steel Panels

Trimet Building Products

Environmental Product Declaration Roll Formed Steel Panels
Sponsored
Reflectivity of Prefinished Sheet Steel

Reflectivity of Prefinished Sheet Steel

Trimet Building Products

It’s a fact that buildings consume two thirds of all the electricity produced in North America and one third of all the energy produced in North America. While it is recognized that cooling and heating costs can be reduced by adding insulation under the roof surface, there is a diminishing return on the strategy of increasing insulation to conserve energy costs. This is where “cool roofing” can play a role in further reducing the energy consumed, and in minimizing the Heat Island effect created in the big urban cities. Cool roofing relies on the properties of reflectivity and emissivity of the roofing material. Reflectivity Reflectivity is the ability of the roof to reflect solar radiation back into the atmosphere. Its primary measure is solar reflectance - the proportion of the total solar radiation that is reflected back to the atmosphere. Any solar radiation that is not reflected is absorbed into the building envelope, requiring further energy to cool the building; or partially convected into the atmosphere increasing the ambient air temperature in the surrounding environment (Heat Island effect). The measure of reflectivity is the Solar Reflectance Index (SRI) which takes into account the properties of the material as well as the cooling effect of wind passing over the roof. The SRI for a low slope roof will be 0 for standard black (reflectance 0.05, emittance 0.90) and 100 for standard white (reflectance 0.80, emittance 0.90).
Sponsored
Repainting Factory
Prefinished Metal Panels

Repainting Factory Prefinished Metal Panels

Trimet Building Products

Introduction Prefinished sheet steel is used on many building products from wall cladding, to architectural roofing to interior panels. Prefinished sheet steel has been used in Canada for over 30 years and there may be sites were the paint surface is in need of repainting. This bulletin is intended to give some guidance on repainting prefinished panels. Due to the diversity of factory applied prefinished systems, and the diversity of potential field applied repaint systems, it is impossible to offer one comprehensive repaint procedure for all possible situations. However, it is possible to offer a set of guidelines to be considered in every potential situation.
Sponsored
CSSBI SSF 24-07:
Natural Finish Metallic Coatings - Attractive but not Architectural

CSSBI SSF 24-07: Natural Finish Metallic Coatings - Attractive but not Architectural

Trimet Building Products

Architects and Specification Writers are increasingly selecting unpainted metallic coated steels for architectural roofing and cladding applications on building exteriors where they want a “Silver” metallic finish. This is occurring more frequently, and even on “prestige” type projects. The Canadian Sheet Steel Building Institute whose fabricator members manufacture a wide variety of building panel profiles for roofing and cladding applications, are being asked to supply unpainted (natural finish) galvanized or resin coated 55% Aluminum-Zinc coated steel for these architecturally exposed end uses. Oftentimes, these materials are specified because the designer finds the natural finish of these products very appealing and sometimes because of material cost savings opportunities. This Fact Sheet has been developed to provide guidance in material selection and provide information on the Architectural Metallic Finishes that are available for highly visible steep slope roofing and cladding applications. 
Sponsored
Fastener Guide for Sheet Steel Building Products

Fastener Guide for Sheet Steel Building Products

Trimet Building Products

Fastener Guide for Sheet Steel Building Products
Sponsored
CSSBI SSF 21-06:
Low Sloped Steel Roofing - The Winners in Life Cycle Cost Analysis

CSSBI SSF 21-06: Low Sloped Steel Roofing - The Winners in Life Cycle Cost Analysis

Trimet Building Products

An independent assessment of the life cycle cost for various low slope roof systems revealed that steel roofing had the longest life span, no leaks due to material failures, and the lowest overall maintenance cost.
Sponsored
How To Series - Pre-finished Sheet Steel for Retrofit

How To Series - Pre-finished Sheet Steel for Retrofit

Trimet Building Products

Preface This How To Series publication is an educational tool intended to give guidance to anyone specifying sheetsteel building products. This particular publication deals with the retrofit of the building envelope utilizing sheet steel. This is a generic guide giving the basic details and should only supplement the specific recommendations or design guidance published by the manufacturer appropriate to their own products. The material presented in this publication has been prepared for the general information of the reader. While the material is believed to be technically correct and in accordance with recognized good practice at the time of publication, its should not be used without first securing competent advice with respect to its suitability for any specific application. Neither the Canadian Sheet Steel Building Institute norites Members warrant or assume liability for the suitability of the material for any general or particular use.
Sponsored
USA-made Fire Rated Glass Helps UC Merced Achieve Triple Zero Sustainability

USA-made Fire Rated Glass Helps UC Merced Achieve Triple Zero Sustainability

SAFTI FIRST

The Merced 2020 Project, an ambitious, $1.2B, extensive expansion of the UC Merced campus, is “the largest public-private partnership social infrastructure project completed in U.S. history,” according to the university’s website. This includes new facilities used for academic, administration, laboratories, housing and recreation. This was truly exciting, and it struck a chord with SAFTI FIRST® because Merced is home to our manufacturing facilities.
Sponsored
Utah Business School Features Dramatic Fire Rated Glass Wall

Utah Business School Features Dramatic Fire Rated Glass Wall

SAFTI FIRST

The David Eccles School of Business on the University of Utah campus features a 28- x 18-ft 2 hour interior glass wall with a 90 minute full-vision door in an exit enclosure/stairwell. The architects selected fire rated glass to meet fire rating requirements while providing maximum visibility and natural daylighting in the space. The project’s specifications also required the fire rated glass to have the same optical clarity as the adjacent non-rated glass systems.
Sponsored
Fire Rated Glazing Adds Visual Appeal to Parking Garages

Fire Rated Glazing Adds Visual Appeal to Parking Garages

SAFTI FIRST

Codes required fire wall separations between parking garages and businesses, markets, homes and other uses. Architects can replace entire walls with glass to open up buildings like never before. For example, SuperLite® II-XL in GPX® Architectural Series Framing by SAFTI FIRST® is a USA-made fire resistive transparent wall system that blocks radiant heat and meets the same stringent ASTM E-119/ UL 263/ NFPA 251 code requirements that any opaque fire rated wall must meet.
Sponsored
Fire Resistive Transparent Walls Transform Stairwells and Exits to Inviting, Light-filled Spaces

Fire Resistive Transparent Walls Transform Stairwells and Exits to Inviting, Light-filled Spaces

SAFTI FIRST

To preserve the building’s open design and to extend natural light further in the building, the architects incorporated fire resistive glazing in the areas that required a 2-hour fire rating, particularly in the stairwells and exit passageways at the new Kent State University College of Architecture and Environmental Design.
Sponsored
Cincinnati Art Museum Renovation Features Transparent Stairwell

Cincinnati Art Museum Renovation Features Transparent Stairwell

SAFTI FIRST

When the Cincinnati Art Museum embarked on an $11 million renovation, the architects wanted the entrance and main stair to be as inviting as possible. Transparent, fire rated glazing from SAFTI FIRST® was a key component of the design solution. To maximize the vision area in door itself, SuperLite® II-XL 60 in GPX® Builders Series Temperature Rise full-lite doors. In some of the stairwell doors in less prominent locations, SAFTI FIRST® provided SuperLite® X-90 for the vision panels under 100 sq. inches.
Sponsored
Fire Resistive Glass Floors Make a Dramatic Statement in Nashville’s Historic Neighborhood

Fire Resistive Glass Floors Make a Dramatic Statement in Nashville’s Historic Neighborhood

SAFTI FIRST

SAFTI FIRST® became aware of the new 21c Museum Hotel project when the design team called looking for an economical option for a unique fire rated application for a boutique hotel in Nashville’s historical Printers Alley neighborhood. The design featured a glass floor on the 2nd level that would also act as a light well. In order to comply with fire rated code requirements, the transparent floor needed to meet a 1-hour fire resistive rating.
Sponsored
Medical Center Maximizes Natural Daylight with Fire Rated Glass

Medical Center Maximizes Natural Daylight with Fire Rated Glass

SAFTI FIRST

Central to the new UC Davis Medical Center Surgery and Emergency Services Pavilion's design was a large skylight that allows natural light to vertically flow into the atrium area and other light wells throughout the building. However, they also wanted to let light flow horizontally into the adjacent hallways, rooms, etc. Because the walls in the atrium and light wells have to meet a 2-hour rating, Stantec Architects approached SAFTI FIRST® for a solution. Large portions of the 2 hour atrium and light well walls were made “transparent” with the use of SuperLite® II-XL 120 in GPX® Framing.
Sponsored
Utah Junior High Adds Fire Rated Glass to Corridors

Utah Junior High Adds Fire Rated Glass to Corridors

SAFTI FIRST

AJC Architects of Salt Lake City, Utah looked to SAFTI FIRST® when it came time to renovate the media center and build a new counseling center for North Layton Junior High School. They realized they could take advantage of a clear fire-rated glazing to keep the look of the media center and provide an open, welcoming entrance to the new counseling center.
Sponsored
Glass Curtain Wall Lets Light In and Keeps Fire Out

Glass Curtain Wall Lets Light In and Keeps Fire Out

SAFTI FIRST

Prairie Hills Junior High School's south-facing elevation features a glazed aluminum curtain wall that incorporates PPG Solarblue and PPG Solarban 60 glazing. Parts of the curtain wall had to meet a two-hour rating because it was adjacent to a two-hour block wall through the building's interior. SAFTI FIRST® supplied SuperLite® II-XL 120 IGU in GPX® Curtain Wall Framing in order to meet ASTM E-119/NFPA 251/UL263 requirements.
Sponsored
Light-Filled Transit Center Receives Honor with the Help of Fire Resistive Butt-Glazed Glass Walls

Light-Filled Transit Center Receives Honor with the Help of Fire Resistive Butt-Glazed Glass Walls

SAFTI FIRST

Bringing the outside in was an important design element for the newly opened BART Milpitas Transit Center. ASTM E-119/UL 263/CAN ULC S101 rated, fire resistive SuperLite® II-XLB 60 butt-glazed walls were used for the 1 hour light wells to allow abundant natural light to flow vertically and horizontally through two levels – from the entrance/ticketing level and all the way down to the tracks where the train cars are.
Sponsored
Fire Rated Glazing Gets Visitors ‘In the Spirit’ of Historic Bourbon Distillery

Fire Rated Glazing Gets Visitors ‘In the Spirit’ of Historic Bourbon Distillery

SAFTI FIRST

As America celebrated National Bourbon Day on June 14, downtown Louisville also celebrated the highly anticipated grand opening of the Old Forester Distillery. This event is also touted as a triumphant return of America’s first bottled bourbon in continuous production by the same family before, during, and after Prohibition to Whiskey Row. See how SAFTI FIRST®’s fire rated glass walls helped create an immersive visitor center with a fully operational distillery, cooperage and bottling line.
Sponsored
Fire Resistive Glass Opens New Doors for Adaptive Reuse Project

Fire Resistive Glass Opens New Doors for Adaptive Reuse Project

SAFTI FIRST

Adaptive reuse, or the process of taking an old building or structure and repurposing it for something other than what it was originally designed for, has gained a lot traction with developers and architects alike – and for many good reasons. For one thing, it is more economical and sustainable to work with an existing structure than to demolish an old building, clean up the site, and rebuild with entirely new materials. It also helps preserve historical structures that add character to the community, as well as reduce urban sprawl. For the multifamily sector, we’ve seen adaptive reuse applied to old schools, government buildings, warehouses, etc. because these structures are usually centrally located in many downtown areas.
Sponsored
Glazing Offers a Fire and Hurricane Rated Solution for US Veterans

Glazing Offers a Fire and Hurricane Rated Solution for US Veterans

SAFTI FIRST

The new Orlando VA Medical Center needed glazing that would not only provide light and transparency, but fire and hurricane protection and improved energy performance. SuperLite® II-XL in GPX® Hurricane Framing from SAFTI FIRST® was installed in exterior fire-rated locations that were exposed to the elements. These assemblies were rigorously tested and certified for fire and radiant heat protection for up to two hours, large missile impact, air and water infiltration, and cyclic wind loading.
Sponsored
Army Hospital Features First-ever Fire Resistive, Blast Rated Curtain Wall that Meets DoD Antiterrorism Standards

Army Hospital Features First-ever Fire Resistive, Blast Rated Curtain Wall that Meets DoD Antiterrorism Standards

SAFTI FIRST

The Department of Defense (DoD) published the Unified Facilities Criteria (UFC) 4-010-01 Antiterrorism Standards for Buildings as a mandatory guideline to mitigate the threats of terrorism against buildings and ensure the safety of the individuals that inhabit them. It applies to all newly constructed DoD Components, DoD inhabited buildings, billeting and high-occupancy housing, as well as already inhabited buildings where the renovation costs are 50% or more than the value of the building (for a complete list, please see UFC 4-010-01 section 1.8).
Sponsored
Beautiful 2-Hour Glass Floor Brings Light and Protection to San Francisco’s Union Square Station

Beautiful 2-Hour Glass Floor Brings Light and Protection to San Francisco’s Union Square Station

SAFTI FIRST

SAFTI FIRST® provided a unique, artistic 2-hour fire resistive glass floor to the new Union Square Station in San Francisco. This glass floor acts as a lightwell and designed to improve wayfinding by welcoming commuters into the concourse level while meeting all the fire rated code requirements. Because SAFTI FIRST®’s products are proudly USA-made, it met the Buy America requirements of the project as well.
Sponsored
Fire Rated Glazing Helps Historic University Preserve its Past

Fire Rated Glazing Helps Historic University Preserve its Past

SAFTI FIRST

The new Robert B. Aikens Commons at the University of Michigan Law School was built on an unused grassy courtyard between Hutchins Hall and the legal research building. The proximity of the new common area to historic Hutchins Hall posed a unique challenge. The building code required a 2 hour fire rated barrier between them. The architects specified SuperLite® II-XL 120, a clear, fire resistive glazing product that meets the ASTM E-119 wall standard for up to 2 hours.
Sponsored
Fire Rated Glazing Helps Achieve Unobstructed, Floor-to-Ceiling Views in 2-Hour Atrium Wall

Fire Rated Glazing Helps Achieve Unobstructed, Floor-to-Ceiling Views in 2-Hour Atrium Wall

SAFTI FIRST

There is a growing trend in office space design that favors increased opportunities for connectivity and collaboration among its occupants. In buildings with multiple floors, this can be a challenge as the vertical separation between floors makes face-to-face encounters less likely to happen. One way to get around this is by incorporating an atrium. See how fire rated glass helped the designers meet the fire rated requirements for this atrium while providing clear, unobstructed views.
Sponsored
The Miracle of 520 West 20th Street

The Miracle of 520 West 20th Street

SAFTI FIRST

The architects at Morris Adjmi wanted large, 11-ft. tall glass walls to highlight the breathtaking views for the reimagined Warehouse in New York City’s growing architectural wonderland of Chelsea. However, the building was on a lot line, mandating 2 hour fire walls. SAFTI FIRST® made this dream a reality by supplying the largest tested and listed 2 hour fire resistive glazing available today. The inclusion of low-iron glass in the fire-resistive glazing units ensured superior clarity and aesthetic continuity with the adjacent non-rated windows. The fire resistive units incorporated high performance glazing and were filled with argon for energy efficiency and occupant comfort.
Sponsored
Fire Rated Switchable Glass Provides Privacy and Fire Protection at the University of Chicago Medical Center

Fire Rated Switchable Glass Provides Privacy and Fire Protection at the University of Chicago Medical Center

SAFTI FIRST

The new 10-story “Center for Care and Discovery” building in the University of Chicago Medical Center’s campus is dubbed as the “hospital of the future” for its high-tech design and groundbreaking scientific work. At 1.2 million square feet, it is one of the largest buildings at the campus and has already transformed the skyline of Chicago’s south side.
Sponsored
Fire Rated Glass Contributes to Salt Lake City Public Safety Building’s Sustainable and Resilient Design Goals

Fire Rated Glass Contributes to Salt Lake City Public Safety Building’s Sustainable and Resilient Design Goals

SAFTI FIRST

The Salt Lake City Public Safety Building in Utah is the first U.S. Public Safety Building to achieve both a net-zero rating and LEED Platinum status and designed to survive a 7.5 magnitude earthquake and remain fully functional afterwards. This ensures that the city’s emergency operations center can survive and help the city recover in the event of an earthquake or a similar disaster. Fire rated glass contributes to achieving sustainable design goals by maximizing daylight penetration deep within a building and shared artificial lighting between spaces. It also ensures that occupants can exit the building safely in the event of an earthquake, which can damage sprinkler systems and render them ineffective.
Sponsored
Fire Rated Glass Helps SFPUC Building Achieve LEED Platinum

Fire Rated Glass Helps SFPUC Building Achieve LEED Platinum

SAFTI FIRST

The new San Francisco Public Utilities Commission Headquarters combines maximum daylighting and fire safety with a multi-story, fire rated glass stairwell from SAFTI FIRST. Dubbed as the "greenest building in North America," this Class A LEED Platinum office building features a transparent, 2-hour fire rated stairwell, situated prominently near the main entrance. SAFTI FIRST supplied SuperLite II-XL 120 in GPX Architectural Series Wall Framing and SuperLite II-XL 90 in GPX Builders Series Temperature Rise Door starting from the lobby all the way to the topmost floor.
Sponsored
Florida Condos Install Fire and Hurricane Rated Glass Wall Assemblies

Florida Condos Install Fire and Hurricane Rated Glass Wall Assemblies

SAFTI FIRST

SAFTI FIRST® developed, engineered and successfully tested the first-ever fire and hurricane rated assembly for the Las Olas Beach Club and Condominium, a luxurious multi-family residence in Ft. Lauderdale, FL. The architect wanted to design the units with as much glazing as possible so residents can enjoy views of the surrounding area from their homes.
Sponsored
Fire Rated Security Glass at Plaquemines Parish Detention Center

Fire Rated Security Glass at Plaquemines Parish Detention Center

SAFTI FIRST

Plaquemines Parish Detention Center was one of the major structures devastated by Hurricane Katrina in 2005. In rebuilding, designers L. R. Kimball looked for an all-in-one clear, wire-free glazing solution that protects against fire, bullets and forced entry. SAFTI FIRST® supplied a complete single-source tested and listed assembly that was easy to install and maintenance-free.
Sponsored
Technical College Renovation Features Fire Rated Glass Walls

Technical College Renovation Features Fire Rated Glass Walls

SAFTI FIRST

Central to the building's design are several simulation labs, practice labs, and mock operating rooms where students can observe instructors and each other as they perform their tasks. Because these labs are in areas where a 1-hour fire rating has to be maintained, the architects chose to combine vision, transparency, and fire safety with SuperLite® II-XL 60 in GPX® Architectural Series framing.
Sponsored
Clear, Fire Resistive Butt-Glazed Walls Create Transparent, Connected and Code-compliant Stairwell

Clear, Fire Resistive Butt-Glazed Walls Create Transparent, Connected and Code-compliant Stairwell

SAFTI FIRST

The University of Wisconsin School of Business Grainger Hall’s east and west wings are now linked by a state-of-the-art Learning Commons that encourages collaboration through technology and design. To achieve maximum transparency while meeting code requirements, the architects specified 9 ft. tall, clear, fire resistive butt-glazed walls using SuperLite® II-XLM in GPX® Architectural Series perimeter framing.

Showing 37-72 of 110

Feedback