You are viewing content for Canada.

Choose a country to see content for your location. Changing region will navigate you to the homepage.

NBS Source
I'm a manufacturer

""

2,536 results found

Sort by:

Showing 1-36 of 118

Sponsored
Revolutionary Electro Polarization Performance in Campus Germany, Dubai Expo 2020

Revolutionary Electro Polarization Performance in Campus Germany, Dubai Expo 2020

FutureGlass

1.  About the ProjectOne of the most prestigious national pavilions at Expo 2020 Dubai, The German Pavilion, represented the Federal Republic of Germany's commitment to innovation and sustainability. Designed by renowned Berlin-based LAVA Architects, this 4,600 m² architectural showcase demonstrated Germany's leadership in environmental technology and intelligent building solutions through its unique "forest of steel poles" design.Project Specifications:Location: World Expo 2020 Dubai, UAEBuilding Owner: German Federal Ministry for Economic Affairs and EnergyArchitect: LAVA Architects, BerlinFacade Contractor: Future Glazing LLC, UAEMain Contractor: ARGE Deutscher Pavilion EXPO 2020 Dubai GbRInstallation Date: June 2021Exhibition Period: 6 months with over 3 million international visitorsTotal Pavilion Area: 4,600 m²FutureX Eclipse™ Intelligent Glazing Area: 113 m²2. The ChallengeFuture Glass was tasked with creating intelligent facade elements that would perform flawlessly in Dubai's extreme desert climate while maintaining perfect environmental control for millions of international visitors. The architects required a building envelope that could respond instantly to rapidly changing conditions including sandstorms, intense solar radiation, and temperatures exceeding 45°C.The project demanded breakthrough glazing technology that could eliminate mechanical shading systems while providing instant environmental adaptation. The design called for individual glass panels to operate independently whilst maintaining overall design coherence across the pavilion's complex geometry. Additionally, the system needed to be maintenance-free, withstand sandstorm conditions, and deliver consistent performance throughout the six-month exhibition period without any mechanical intervention.Given the prestigious nature of this international exhibition space, any failure or performance degradation would have significant reputational impact, making reliability and consistent operation absolutely critical.3. The OutcomeThe FutureX Eclipse™ installation delivered exceptional environmental control, enabling Campus Germany to maintain perfect occupant comfort for international visitors while showcasing German innovation in intelligent building technology. The electropolarization system responded instantly to Dubai's challenging environmental conditions, providing seamless transitions between maximum transparency and sophisticated solar protection in one second or less.The installation demonstrated zero mechanical shading requirements across the entire facade system, with individual 1.5-meter wide rotatable glass elements operating flawlessly throughout the exhibition period. The success of this project established new benchmarks for intelligent glazing performance in extreme climatic conditions and proved that breakthrough electropolarization technology could transform architectural vision into responsive, high-performance building envelopes.The pavilion's environmental control system impressed over 3 million visitors and received international recognition for its innovative integration of intelligent building technology with sophisticated architectural design.4. Products UsedFutureX Eclipse™ Electropolarization Switchable Glass System:Surface Area: 113 m² of intelligent glazing elementsQuantity: 61 individual switching unitsGeometry: Rectangular configurations with rotational capabilityConfiguration: 28 fixed glass panels, 4 standard doors, and 29 intelligent folding door elementsSwitching Speed: ≤1 second response timePerformance: Neutral colour throughout all switching statesTechnology: Eclipse® electropolarization switching layer with controlled electrical field modulationControl System: Individual panel control with building automation integrationEnvironmental Rating: Designed for extreme desert climate operation including sandstorm resistance
Sponsored
At The Top

At The Top

FutureGlass

About the ProjectTowering above the Dubai skyline, the Burj Khalifa is symbolic of the city’s emergence as one of the world’s top business and tourist destinations. The magnificent tower houses residences, a hotel and various commercial spaces, but its most popular attractions are the two observation decks located at the 124th and 148th floors. For visitors, the enthralling experience of visiting At The Top starts right from the moment they start to queue up to book their tickets. An extraordinary union of tasteful design, precision engineering and meticulous craftsmanship, the entrance lobby to the observation deck was created to give visitors a small glimpse of the beauty that awaits them a hundred storeys higher.The ChallengeWhile procuring the glass for the lobby to Dubai’s most well-known tourist attraction, we left no stone unturned in sourcing the highest grade materials. The customer had very specific needs regarding the colour of the panels. Achieving the right PVB colour combination was one of the biggest challenges we faced on this project. Further, we had to ensure that the glass used was durable and the coloured films did not fade over time. Working with Seele proved to be both demanding and rewarding. The company, known for developing Apple stores across the world, wanted to inspect every single pane of glass so that it met their high quality requirements. 
Sponsored
College of Business

College of Business

FutureGlass

About the ProjectA new educational hub in the heart of Kuwait, the College of Business is known for its impeccable design and breathtaking facade. A part of Kuwait’s much larger Sabah Al Salem University complex, the college building is an interactive teaching and research space where students hone their business skills. The building’s unique architecture, with vertical louvre shades and expansive rooflines, was created to maximise the natural airflow while minimising solar penetration The ChallengeThe building had a roof of approx 4,000 sq. m., which would allow a large amount of heat to enter through the skylight. This posed a big challenge to the architects in order to manage the cooling loads for the building. Our brief was to make the building as energy-efficient as possible, which called for us to find a way to keep heat transmission to a minimum while also maximising light transmission. Finding the appropriate build-up for the skylight was key for the success of the project completion in the short term and for the operation of the building in the long term to ensure sufficient light disbursement and reduction of solar heat gain. The glass make up had to protect the interiors from the harsh sunlight while also ensuring that the sun’s movement did not leave parts of the building in darkness. The idea was to ensure uniform dispersion of sunlight so as to reduce the occurrence of shadows and contrasts within the space. 
Sponsored
Caspian Waterfront

Caspian Waterfront

FutureGlass

Scope of WorkProcess, deliver and install façade cone glazing for the dome.Build Up12mm FT HST Sunguard Neutral 50 + 16mm Black Warm Edge spacer + 88.4 Clear HSProject DetailsCaspian Waterfront is the reimagined building of the original government congress centre. In 2016, local developer Pasha Construction started transforming the building into a 120,000 sq. m. retail entertainment and leisure complex. Located on the shore of the Caspian Sea, the structure opens onto the waterfront on three sides.The retail centre’s unique structure posed a challenge. The building complex has geometric shapes similar to the Sydney Opera House, with shell roofs that reflect the surrounding water. The central flame tower has an eight-angled glass façade inspired by the country’s emblem, the eight-pointed star. Since the building would resemble a place of pride, we had to ensure that our panels surpassed every quality level. Due to the unique triangular shape of the glass panels extra care had to be taken during production, delivery and installation to prevent injury, breakage and damage.At Future Glass, we always prioritise quality. Our state-of-the-art processing facility enabled us to deliver the panels on time with minimal on-site rejections. Today, Caspian Waterfront has become a national symbol of Azerbaijan.
Sponsored
Harbour Central Case Study

Harbour Central Case Study

FutureGlass

About Galliard HomesHaving serviced London’s real estate market for over a quarter of a century, Galliard Homes is the English capital’s largest privately owned residential developer. Over their years in the business, Galliard has become synonymous with regeneration, rejuvenation and reinvention. About Our CustomerProviding a wide range of façade design and engineering services to real estate companies across Europe, Yuanda has been transforming the continent’s skylines for over a decade. By offering a combination of European system design and Chinese materials and fabrication, Yuanda continues to provide world-class and cost-effective façade solutions to the UK, France, Germany and Switzerland. The BriefThe Harbour Central project was conceptualised to transform the London Docklands into an up-and-coming residential area. The project, which comprises 5 residential towers, boasts a total façade area of 63,000 square metres. The façades were designed to superimpose a metal mesh on the shadow box area and showcase the aesthetics of the blocks. Moreover, the team of architects at Rolfe Judd had very precise specialty glazing requirements for the buildings. “We discussed product aesthetics, construction and design considerations. The architect had a specific idea in mind regarding the kind of colour finish they required and Future Glass was able to provide the perfect gold and silver tones that were needed.”- Mr Alain Anthony, Design Director, Yuanda EuropeThe Future Glass SolutionThe search for the perfect glass led us across countries and continents. After an exhaustive search, the silver mesh was procured from Germany while the gold mesh was procured from Italy. Since the glass panels required were of a very large size, an innovative solution was sought by which panels of a maximum size of 1,500 mm x 4,000 mm were created with the metal mesh suspended in the cavity of the IGU. To put concerns about mesh sagging and distortion to rest, a sample panel was provided to the client. For energy efficiency, Climaguard Premium 2T, a high performance Low-E coated glass was procured from Guardian Glass in Europe. The glass itself is made up of a combination of products. The outer-lite is a clear ecoLAM (HS) of 10.76 mm. The expanded metal mesh infill is within a 24 mm black spacer with argon gas. Finally,  the inner lite is a 6 mm clear ecoFACADE (HS). Despite the complicated product combination, the performance specifications were designed to meet the client’s requirements perfectly. A total of about 4,100 square metres of finished insulated glass units with expanded metal mesh were provided for the Harbour Central project.The Future Glass AdvantageAt Future Glass’ state-of-the-art facility in UAE, a dedicated workforce was tasked with ensuring the high-specialty glass was treated in a sterile environment where temperature and humidity could be controlled. Each glass panel is handmade and pieced together under the supervision of qualified engineers. The finished glass panels were placed in IPPC-certified wooden crates for transport. As per local requirements, each piece was individually banded and then shipped to Yuanda’s Shenyani factory. From there, the panels were carefully assembled into a framing system that was delivered to the site in London. Despite the fact that the materials were sourced from various countries, the logistics and operations team took every precaution necessary to ensure zero breakages during the delivery process. In case panels needed to be replaced, we did what was necessary without impacting the timelines, even though it was difficult to procure smaller quantities of mesh from the supplier.
Sponsored
Qatar National Library

Qatar National Library

FutureGlass

About the ProjectThe Qatar National Library covers over 42,000 sq. metres and houses millions of books, e-books, historic texts, manuscripts, periodicals and more. The entire building has been envisioned to look like a single room with clear views of the surrounding areas. Tying into the entire project’s overarching theme, the architect designed the building to resemble a diamond. A sunken patio in the heart of the building provides light to the office spaces while also serving as a transition space between the harsh outdoors and the sanctuary of books inside.The ChallengeThe customer’s vision for the library required panels that offered clear views with minimal to no reflection.
Sponsored
Silicon Central

Silicon Central

FutureGlass

Scope of WorkProcess and deliver double-glazed triangle-shaped units with a dotted frit ceramic design with 50% coverage providing shading to the internal areas. The mall's skylight required 6,000 individual units in multiple configurations with a total area of ….m2Build Up39.52 mm ecoTHERM (IGU) consisting of ecoSHIELD (T) 10 mm COOL-LITE SKN 144, 16 mm spacer, ecoSHIELD (T) 6 mm clear (Guardian), 1.52 mm clear PVB (Trosifol), ecoSHIELD (T) 6 mm clear (Guardian), U-insert (Silicon Dow Corning – 3362)Triangle Glass – 29.52 mm ecoTHERM (IGU + LAMI) consisting of ecoSHIELD (T) 6 mm COOL-LITE SKN 144, 12 mm spacer, ecoSHIELD (T) 5 mm clear, 1.52 mm clear PVB (Trosifol), ecoSHIELD (T) 5 mm clear, U-insert (Silicon Dow Corning – C-3362)Project DetailsThe Lulu Group, known predominantly for its hypermarkets spread across Dubai, decided to create a mall in the heart of the Silicon Oasis Smart City. Silicon Central was designed with sustainability at the forefront, populated by plants, water and natural light.Given Dubai’s harsh summers, we had to ensure the skylight allowed light to pass while filtering heat and minimising glare to ensure shoppers had a comfortable experience. Only 50% of the skylight is transparent, while the rest is opaque. We achieved the shading effect by using dotted ceramic frit in the panels. The main atrium skylight comprised triangle-shaped panels, which complicated the processing due to sharp corners. To ensure the delivery of all 6,000 panels seamlessly, we set up a multi-glass management system to easily track and handle the different glass sizes and codes.The skylight was installed successfully, and Silicon Central has become an integral part of the sustainable Silicon Oasis neighbourhood.
Sponsored
Al Wasl Plaza

Al Wasl Plaza

FutureGlass

Al Wasl Plaza was the heart of Dubai Expo 2020 and continues to remain the focal point of Expo City. The central dome, surrounded by a decorative garden and five buildings, truly reflects the theme, Connecting Minds, Creating the Future. Working on the Al Wasl Plaza required careful thought and consideration. We had to ensure that the three office buildings and two hotels enjoyed unobstructed views of the garden and dome while maintaining energy efficiency and privacy.  The project was designed by Chicago-based architecture firm Adrian Smith + Gordon Gill. Since the project was part of Expo 2020, which invited representatives from around the globe, we had to ensure we met and exceeded global glass and glazing standards. We understood that the buildings were the supporting cast for the dome and gardens, yet they played a crucial role in making the entire plaza the focal point of the Expo.
Sponsored
Korean Pavilion

Korean Pavilion

FutureGlass

Project DescriptionOne of the most awe-inspiring pavilions at the Expo 2020, was the Korean Pavilion embodying the theme “Smart Korea, Moving the World Forward.” It was the fifth-largest exhibit at the Expo, and the entire pavilion was shaped like an octagon. The unique pyramid structure ensured enough light entered the pavilion, while the north façade had rotating cubes that displayed myriad images and colours. To truly revel in the beauty of the pavilion, visitors could walk through the spiral aisles to admire the exhibits inside while still catching glimpses of the extraordinary view.About the ClientEstablished in 1962, the Korea Trade-Investment Promotion Agency (KOTRA) helps expand small and medium local businesses in overseas markets. They also work to attract foreign investment and develop international trade relations. KOTRA is known for spearheading innovative businesses and successfully building mutually beneficial partnerships. They sustain their growth through 127 offices worldwide, with over 15 offices in West Asia, including one in Dubai Media City.The BriefThe client wanted to truly showcase Korea’s forward-thinking vision. They designed a unique façade for the pavilion, with a steep slope on the south to let in adequate light and warmth. On the opposite side, a rotating cube protrudes from the basic slope, creating a dynamic façade that changes with
Sponsored
White City Phase 2

White City Phase 2

FutureGlass

Nestled in the heart of a revitalized West London neighborhood, White City Living offers a unique residential experience. Built on a formerly isolated industrial site, the property boasts stunning views of a serene stream winding through elegant lawns and low-hanging trees. The second phase, launched in 2020, introduces 427 affordable homes with 1-, 2-, and 3-bedroom multi-tenured apartments, featuring expansive open spaces and world-class amenities designed for modern living.About the ClientSt. James, a proud member of the Berkeley Group, is renowned for pioneering urban regeneration across the UK. Known for transforming industrial areas along London's riverside into thriving residential and commercial spaces, St. James leads this project with their visionary approach. Collaborating with SKONTO PLAN and BOYER, they are reimagining this neighborhood into a vibrant hub of activity and tranquility.Our Innovative SolutionTo align with the client’s vision, initial designs considered stick-on stainless steel elements. However, these panels posed challenges, such as frequent maintenance needs and complex installation processes. Our team developed an alternative solution, ensuring durability, ease of maintenance, and seamless integration into the project’s design.
Sponsored
Molson Brewery

Molson Brewery

ACO Canada

Located at the foot of the Cascade mountain range in Chilliwack, the brand-new Molson – Coors was inaugurated in 2019. It has the capacity to produce 300 million litres of beer a year. The brewery is equipped with advanced technologies for operational efficiency, and it is considered Molson’s most modern facility.The plant was designed with optimised equipment layouts that help reduce beer loss and wastage. Hygienic industrial drainage is a major component of the design and ACO drainage was selected for its proven performance.Benefits of ACO StainlessEasy to clean hygienic designStainless steel is highly resistant to corrosionHigh hydraulic efficiency for fast removal of surface waterACO’s experience in drainage for food processing environments
Sponsored
Casa Loma, Toronto

Casa Loma, Toronto

ACO Canada

Casa Loma is a Gothic Revival castle-style mansion and garden in midtown Toronto, Ontario, Canada, that is now a historic house museum and landmark. It was constructed from 1911 to 1914 as a residence for financier Sir Henry Pellatt.Part of the renovations carried out was improving the water management on the exterior terrace located at the back of the building. The requirement was for the stormwater to be collected and disposed of efficiently without creating an unsightly 3D grading of the terrace surface. Linear drainage was the natural selection.ACO KlassikDrain KS100 was chosen for its robustness and ability to withstand Canadian weather conditions. The perforated stainless steel grate will resist corrosion and it is AODA and heelproof compliant, important requirements for this public venue.
Sponsored
Fallsview Casino  Entertainment Centre Niagara Falls, ON, Canada

Fallsview Casino Entertainment Centre Niagara Falls, ON, Canada

Mapei Inc.

Amidst many challenges that were faced by contractors and installers of the newbuild Fallsview Casino Entertainment Centre in Niagara Falls, Ontario, the choice of MAPEI’s single-source solutions for setting materials proved to be a sure bet.
Sponsored
Lofts du Village Mapeheat Installation – Chelsea, QC, Canada

Lofts du Village Mapeheat Installation – Chelsea, QC, Canada

Mapei Inc.

When the people of Canada’s capital region seek relief from city life, they often retreat to the serene, natural beauty found in Quebec’s Gatineau hills. Here, where temperatures can drop to -38°F (-39°C) and snow falls seven months out of the year, heated flooring is a practical luxury. To help recreate a Scandinavian-style getaway for the Groupe Nordik Lofts du Village project, specifiers chose one of MAPEI’s Mapeheat floor-heating systems.
Sponsored
One World Trade Center

One World Trade Center

Master Builders Solutions

Soaring to a height of 1,776 feet (540-meters), the 2.6-million-squarefoot (242,000-square-meter) skyscraper known as One World Trade Center in the lower Manhattan district of New York City is a marvel of design and engineering. Construction of the building, previously called the Freedom Tower, began in April 2006 and at the time was the tallest building in the United States.The Challenge Sustainable design was a central theme to One World Trade Center’s development, with the Port Authority of New York/ New Jersey imposing a strict requirement for the replacement of Portland cement with recycled materials. In addition, extremely high performance concrete was necessary to meet the compressive strength requirements of the steel and concrete structural columns, which ranged from 14,000 psi (97 MPa) to 12,000 psi (83 MPa) for the lower 40 floors and 10,000 psi (69 MPa) to 8,600 psi (59 MPa) for the upper floors. The 12,000 psi (83 MPa) concrete phase of the project was the most challenging, with the engineers, owners and contractors all having their own requirements and specifications.The ResultsThrough Master Builders Solutions‘ Green Sense Concrete mixture optimization service, Eastern Concrete Materials was able to proportion an EF Technology® concrete mixture with 71% cement replacement. The mixture replaced Portland cement with the recycled materials, non-cementitious fillers and specialized admixtures to exceed all the performance targets specified by the One World Trade Center project stakeholders. This EF Technology mixture was used for the 38,000 yd3 (29,000 m3) of concrete needed for the columns through the first 40 floors. To quantify the environmental impact of sustainable concrete for the structure, an Eco-Efficiency Analysis was conducted, using a methodology validated by NSF International, to compare the specialized EF Technology mixture to a reference mixture. Some practical equivalents for these savings are: Water savings equal to 1,177,329 half-liter bottles of waterReduced carbon footprint equal to 1,835,494 gallons of gasolineFossil fuel savings equal to 29,872 barrels of oil
Sponsored
Ontario Court of Justice - Toronto

Ontario Court of Justice - Toronto

Master Builders Solutions

OverviewSet in the heart of downtown Toronto, the Ontario Court of Justice is the largest courthouse in Ontario and a benchmark for contemporary institutional construction. Completed in 2024, the project brings together 63 courtrooms and 10 conference settlement rooms in a LEED® Gold certified facility that reflects modern civic values—transparency, accessibility, and sustainability.Master Builders Solutions Canada Inc. played a key role in ensuring the structural concrete met the performance demands of this high-profile project.The ChallengeDelivering nearly 48,000 m³ of ready-mixed concrete in a downtown location posed numerous technical challenges. The structural design demanded high compressive strength, consistent workability, and durability to support complex load paths, security zones, and a tall atrium enclosed by a 20-metre glass façade.The project team required concrete solutions that would:Maintain workability over long pumping distances and vertical placements,Ensure strength development for critical structural zones (such as core walls and transfer slabs),Limit thermal cracking during curing in massive pours,Integrate seamlessly with staged slipform and rebar installation schedules.These demands were intensified by the need to meet LEED® Gold sustainability targets, tight construction timelines, and high public visibility.The ResultsMaster Builders Solutions Canada Inc. partnered closely with St Marys CBM to optimize concrete performance across all phases of construction. A suite of high-performance admixtures—including water reducers, retarders, and strength-enhancing additives—was deployed to address the project’s structural and logistical complexities.Key contributions included:Enhanced workability retention for long-distance pumping and complex placements, reducing placement time and labour.Improved early- and long-term strength development, enabling faster formwork cycling and reliable performance in high-load areas.Mitigated thermal buildup in mass pours to control cracking and ensure durability over the structure’s lifecycle.Admixture compatibility with supplementary cementitious materials (SCMs), aligning with the project’s environmental goals.By tailoring admixture solutions to the precise performance needs of each mix design, Master Builders Solutions supported consistent quality and efficiency throughout the build.The Ontario Court of Justice now stands not only as a civic institution but also as a demonstration of what is possible when modern structural design and advanced concrete technology are brought together. The project exemplifies how Master Builders Solutions helps construction teams deliver on performance, sustainability, and long-term value.
Sponsored
St. Augustine’s  Roman Catholic Church Dundas, ON, Canada

St. Augustine’s Roman Catholic Church Dundas, ON, Canada

Mapei Inc.

St. Augustine’s Church is a magnificent Gothic-style church constructed in 1863. It was built to satisfy the needs of a small but ever-expanding congregation in Dundas, Ontario, after a spectacular fire destroyed the church of 1827. To protect the structural integrity of the construction, MAPEI products were used to waterproof the front foyer and provide crack isolation.
Sponsored
vivaNext mass-transit terminal construction - Toronto, ON.

vivaNext mass-transit terminal construction - Toronto, ON.

Mapei Inc.

Faced with a tight schedule and challenging weather conditions, Belluz Group Ltd. turned to MAPEI for the range of high-end products and support that was needed to complete a new-build terminal project in the heart of Canada’s biggest city.
Sponsored
Shangri-La Hotel & Condos - Toronto, Ontario

Shangri-La Hotel & Condos - Toronto, Ontario

Mapei Inc.

MAPEI’s self-leveling underlayment, Novoplan 2, was used to prepare the floors of the Shangri-La Hotel condos to receive stunning oak planks from Italy. The wood was installed using Ultrabond ECO 995 adhesive with built-in sound reduction and moisture barrier characteristics.
Sponsored
Skyline Lodge - Highlands, NC, USA.

Skyline Lodge - Highlands, NC, USA.

Mapei Inc.

MAPEI’s Mapeheat™ radiant floor-heating system adds an extra touch of luxury to a five-star lodge.
Sponsored
Slush Puppie Center

Slush Puppie Center

Mapei Inc.

MAPEI products and experience helped ensure smooth-as-ice construction of hockey arena
Sponsored
Porsche Rive-Sud – Saint-Hubert, QC, Canada

Porsche Rive-Sud – Saint-Hubert, QC, Canada

Mapei Inc.

During construction of a luxury automotive dealership, MAPEI products were used for surface preparation, waterproofing, uncoupling protection, and tile and stone installation. High moisture content and a fast-approaching deadline were no match for these products, which produced award-winning results.
Sponsored
Bridgewater Residences  on the Lake and The  Pearle Hotel & Spa Burlington, ON, Canada

Bridgewater Residences on the Lake and The Pearle Hotel & Spa Burlington, ON, Canada

Mapei Inc.

A variety of setting materials and innovative sound-reduction products from MAPEI were all part of completing a new-build complex of luxury residences and a four-star Marriott hotel on Lake Ontario’s north shore.
Sponsored
Project Reference Database

Project Reference Database

LATICRETE International, Inc.

LATICRETE Project Reference Database
Sponsored
Honua Kai

Honua Kai

NanaWall

“We Were Looking for a Product That Would Seamlessly Transform an Indoor Living Space into an Outdoor Space, Yet Still Provide Strong Assurances Against Wind and Rain.”
Sponsored
Mountain Brook

Mountain Brook

NanaWall

Mountain Brook, AL
Sponsored
Dairy Farmers of America

Dairy Farmers of America

NanaWall

Building for The Present and The Future
Sponsored
Fire Resistive Curtain Wall at NYC Midtown Community Court

Fire Resistive Curtain Wall at NYC Midtown Community Court

SAFTI FIRST

The 1890s-era Midtown Community Court in New York City—a New York Historic Landmark—is currently undergoing a five year, $18 million renovation that includes a 9,650-square-foot addition for a new elevator, lobby and stairwell featuring fire resistive glass and curtain wall. The system consists of SAFTI FIRST®’s SuperLite® II-XL 120 IGU in GPX® Curtain Wall System.
Sponsored
Glass Curtain Wall Lets Light In and Keeps Fire Out

Glass Curtain Wall Lets Light In and Keeps Fire Out

SAFTI FIRST

Prairie Hills Junior High School's south-facing elevation features a glazed aluminum curtain wall that incorporates PPG Solarblue and PPG Solarban 60 glazing. Parts of the curtain wall had to meet a two-hour rating because it was adjacent to a two-hour block wall through the building's interior. SAFTI FIRST® supplied SuperLite® II-XL 120 IGU in GPX® Curtain Wall Framing in order to meet ASTM E-119/NFPA 251/UL263 requirements.
Sponsored
Fire Resistive Curtain Wall Helps Hospital Meet Fire and Seismic Requirements

Fire Resistive Curtain Wall Helps Hospital Meet Fire and Seismic Requirements

SAFTI FIRST

Ratcliff was chosen as the architect to design the new three-story, 60,000 square foot San Jose Downtown Health Center that includes urgent care for adults and children, primary care for pediatric, OB/GYN and family medicine, behavioral health services, laboratory, pharmacy and radiology departments. Their design takes advantage of glazing’s ability to draw natural light from the outdoors to create a warm, pleasing atmosphere that promotes healing. Part of the hospital’s exterior curtain wall had to be fire rated for one hour and meet seismic requirements per SB 1953 as well.
Sponsored
Fire Resistive Glass Opens New Doors for Adaptive Reuse Project

Fire Resistive Glass Opens New Doors for Adaptive Reuse Project

SAFTI FIRST

Adaptive reuse, or the process of taking an old building or structure and repurposing it for something other than what it was originally designed for, has gained a lot traction with developers and architects alike – and for many good reasons. For one thing, it is more economical and sustainable to work with an existing structure than to demolish an old building, clean up the site, and rebuild with entirely new materials. It also helps preserve historical structures that add character to the community, as well as reduce urban sprawl. For the multifamily sector, we’ve seen adaptive reuse applied to old schools, government buildings, warehouses, etc. because these structures are usually centrally located in many downtown areas.
Sponsored
Army Hospital Features First-ever Fire Resistive, Blast Rated Curtain Wall that Meets DoD Antiterrorism Standards

Army Hospital Features First-ever Fire Resistive, Blast Rated Curtain Wall that Meets DoD Antiterrorism Standards

SAFTI FIRST

The Department of Defense (DoD) published the Unified Facilities Criteria (UFC) 4-010-01 Antiterrorism Standards for Buildings as a mandatory guideline to mitigate the threats of terrorism against buildings and ensure the safety of the individuals that inhabit them. It applies to all newly constructed DoD Components, DoD inhabited buildings, billeting and high-occupancy housing, as well as already inhabited buildings where the renovation costs are 50% or more than the value of the building (for a complete list, please see UFC 4-010-01 section 1.8).
Sponsored
Fire Resistive Blast and Ballistic Glass Walls in High Security Facilities

Fire Resistive Blast and Ballistic Glass Walls in High Security Facilities

SAFTI FIRST

A building’s design is very much influenced by the function it performs and the perceived threats that it may face – whether it’s from natural disasters, accidents or terrorist attacks – with the latter being a foremost concern for federal courthouses, embassies, government facilities and other high profile buildings. Because of these security concerns, trade-offs have been made when it comes to daylighting, energy efficiency and aesthetics to name a few. The good news is that today, high-performance security glazing make-ups are available to meet the level of protection needed while continuing to provide natural light and a feeling of openness.
Sponsored
Utah Business School Features Dramatic Fire Rated Glass Wall

Utah Business School Features Dramatic Fire Rated Glass Wall

SAFTI FIRST

The David Eccles School of Business on the University of Utah campus features a 28- x 18-ft 2 hour interior glass wall with a 90 minute full-vision door in an exit enclosure/stairwell. The architects selected fire rated glass to meet fire rating requirements while providing maximum visibility and natural daylighting in the space. The project’s specifications also required the fire rated glass to have the same optical clarity as the adjacent non-rated glass systems.
Sponsored
Fire Rated Glazing Adds Visual Appeal to Parking Garages

Fire Rated Glazing Adds Visual Appeal to Parking Garages

SAFTI FIRST

Codes required fire wall separations between parking garages and businesses, markets, homes and other uses. Architects can replace entire walls with glass to open up buildings like never before. For example, SuperLite® II-XL in GPX® Architectural Series Framing by SAFTI FIRST® is a USA-made fire resistive transparent wall system that blocks radiant heat and meets the same stringent ASTM E-119/ UL 263/ NFPA 251 code requirements that any opaque fire rated wall must meet.
Sponsored
Utah Junior High Adds Fire Rated Glass to Corridors

Utah Junior High Adds Fire Rated Glass to Corridors

SAFTI FIRST

AJC Architects of Salt Lake City, Utah looked to SAFTI FIRST® when it came time to renovate the media center and build a new counseling center for North Layton Junior High School. They realized they could take advantage of a clear fire-rated glazing to keep the look of the media center and provide an open, welcoming entrance to the new counseling center.

Showing 1-36 of 118

Feedback