NBS Source
I'm a manufacturer

"steel and aluminium frames"

952 results found

Sort by:

Showing 1-36 of 149

Sponsored
Adagio Apartments, WA

Adagio Apartments, WA

Capral Aluminium

The term ‘adagio’ is an instruction to slow down and function at a leisurely pace, which makes it an appropriate name for the recently completed apartment complex. Designed by Hanssen Pty Ltd, minimalist design principles are apparent in the building’s sleek lines, as evidenced in the strong use of high-performance window systems, doors and balustrades; low-maintenance aluminium framing; and a simple linear design promoting an outward-looking connection to the environment. The affordability, strength, adaptability and quality of manufacture of the Capral Apartment Collection made it our ‘material of choice’ for the Adagio high-rise.
Sponsored
Optus Stadium, WA

Optus Stadium, WA

Capral Aluminium

The stadium’s innovative design – a collaboration between HASSELL, Cox and HKS – feels distinctly local, with architecture and landscaping that reflect the state’s proud sporting, cultural and Aboriginal heritage. Wrapping the stadium with a bronze facade made of anodised aluminium to reflect State’s unique geology, and intertwining it with LED lighting to show the home-team colours, is a testament to the engineering ingenuity. The façade colours reflects WA’s unique geology, with the browns and ochres representing the colours of the North West of Australia – the Kimberley region.
Sponsored
Bridge of Remembrance, TAS

Bridge of Remembrance, TAS

Capral Aluminium

Renowned Melbourne architecture firm Denton Corker Marshall was responsible for designing the bridge’s striking appearance. ‘The design respects the site’s cultural heritage and environmental values, providing the physical and mental space to pause and reflect,’ says Neil Bourne, Director at Denton Corker Marshall. The elegantly twisting bridge connects both sides of Hobart’s broad entrance highway in a distinctive entry portal. This much-anticipated civic project’s major design feature is 180 metres of Capral aluminium sheeting, skirting the bridge.
Sponsored
Family Connections, VIC

Family Connections, VIC

Capral Aluminium

Steve Domoney Architecture took on the challenge of designing a home for clients with children. This project came with a clear vision of a spacious family home, contemporary in line and warm in tone. The dining room has Capral AGS windows opening at exterior ground level to a fernery, while high-level Capral AGS 419 Flushline Framing System beyond the kitchen provides views to distant trees in the south-east. The formal lounge opens to a generous decking and garden behind.
Sponsored
Snowy Mountains, NSW

Snowy Mountains, NSW

Capral Aluminium

Nestled in the craggy splendours of New South Wales’ Snowy Mountains region, the stunning home innovatively employs every advantage of Schuco’s environmentally sustainable window and door suites. Henry and Kate Lance of Lance Workshop Architecture expands on Schuco’s key role in the project’s myriad standout features. While there were logistical challenges with installing the windows, they were all overcome. To make sure everything went according to plan when installing those hefty Schuco units, spider cranes were used on this challenging site to safely lift and install some of the larger window units securely into place.
Sponsored
ABC Melbourne Office, VIC

ABC Melbourne Office, VIC

Capral Aluminium

The ABC project in Melbourne’s Southbank precinct represents a bold union of the national broadcaster’s multiple aims and responsibilities. With its bold style, internal and external openness and highly innovative use of technology, the ABC’s Victorian headquarters embodies socially responsible design. The central design theme of transparency is perfectly suited to the Capral curtain wall, window and door systems throughout. The building, which designer Cox Architecture characterise as fostering a ‘dynamic, integrated and visually transparent environment which promotes interaction across program teams’, also invites ‘greater public interest and participation’.
Sponsored
University Hospital Geelong Expansion, VIC

University Hospital Geelong Expansion, VIC

Capral Aluminium

Designed by Silver Thomas Hanley (STH) Architects, the structural additions provide four extra levels of useable space above the existing emergency department. As a construction-managed project, the design and construction teams were able to work in concert to ensure all specifications were correct and appropriate at every stage of the work. Having considered the project challenges, including site constraints, access and speed in which the project needed to be completed, CW175 was chosen for its flexibility, engineering and structural integrity.
Sponsored
Ivy 95 Residences, Broadbeach, QLD

Ivy 95 Residences, Broadbeach, QLD

Alspec

Durable architectural grade aluminium framing products provide peace of mind for residents of these luxury seaside apartments.
Sponsored
Quest Springfield Central, QLD

Quest Springfield Central, QLD

Alspec

Alspec’s extensive range of aluminium framing products provide the ideal attractive, functional and durable windows and doors for this new hotel near Brisbane.
Sponsored
Thuringowa RSL, Townsville, QLD

Thuringowa RSL, Townsville, QLD

Alspec

The exciting product partnership combining Alspec aluminium window framing with Breezway dual-glazed louvre systems is highlighted in this redevelopment of an RSL club in North Queensland.
Sponsored
Pridham Hall, University of SA

Pridham Hall, University of SA

Alspec

A new multi-purpose sports and social centre at University of South Australia has utilised Alspec aluminium framing products in its eye-catching angular design.
Sponsored
Dubai International Airport - Concourse 4, Dubai

Dubai International Airport - Concourse 4, Dubai

Rondo Building Services Pty Ltd

Rondo Steel Stud Drywall Framing System will be used in the construction of the Dubai International Airport - Concourse 4 project.
Sponsored
State Aquatic Centre, SA

State Aquatic Centre, SA

Rondo Building Services Pty Ltd

This massive project took two years of construction to complete, and Rondo’s technical services team were able to provide design solutions for challenging areas in the project. This included a heavy gauge 150mm Steel Stud Wall Framing System which required alignment with and concealment of the structural frame of the building, and a 6 metre high internal dividing wall that was subjected to higher internal pressures due to the louvres installed.
Sponsored
Christchurch Justice and Emergency Services Precinct, NZ

Christchurch Justice and Emergency Services Precinct, NZ

Rondo Building Services Pty Ltd

Rondo was called upon to supply our market leading Seismic Wall and Ceiling System including Steel Stud & Track Drywall Framing, KEY-LOCK Concealed Suspended Ceilings, and DUO Exposed Grid Ceiling Systems.
Sponsored
ABC Studios, QLD

ABC Studios, QLD

Rondo Building Services Pty Ltd

Rondo was able to provide a solution to suit the projects’ specific design criteria by using readily available materials and technical support. The wall framing for the MPS room consisted of over 31m of 150mm Steel Stud and Track, including noggings.
Sponsored
Blue Cross Age Care, VIC

Blue Cross Age Care, VIC

Rondo Building Services Pty Ltd

MP Group were charged with managing the installation and finishing of all internal and external walls and this is also where Rondo offered our support. With the external structural steel framing having been installed 150mm out of position, Rondo’s Technical Services Team came to the rescue and designed an external stud wall system using our MAXIframe External Wall Framing System to ‘fill the gap,’ including design of special header bracing details to support the wall.
Sponsored
Queensland Cotton Dalby Gin Storage Sheds, QLD

Queensland Cotton Dalby Gin Storage Sheds, QLD

Metroll

Built by FKG Group, Queensland Cotton's Dalby Project involved the construction of two large steel framed sheds with a total floor area of almost 20,000m2. Metroll is proud to have been involved in the supply of materials to this significant expansion of storage facilities.
Sponsored
Lambton Square, NZ

Lambton Square, NZ

Rondo Building Services Pty Ltd

The $11.3 million dollar renovation of Lambton Square required Rondo product throughout including our Key-Lock Concealed Ceiling System, Steel Stud Wall framing system and various other Rondo components for the fixing of plasterboard and feature panels.
Sponsored
105 Mitchell St, NT

105 Mitchell St, NT

Rondo Building Services Pty Ltd

Rondo has played a major role in the nearly 5,000m2 ‘105 on Mitchell Street’ hotel redevelopment. Rondo has so far provided about 8,000m2 of KEY-LOCK Concealed Suspended Ceiling System and 76mm Steel Stud Drywall Framing to this project.
Sponsored
Skycity Casino & Hotel, SA

Skycity Casino & Hotel, SA

Rondo Building Services Pty Ltd

The KEYLOCK Concealed Suspended Ceiling System, Steel Stud and Track Wall Framing System, and XPRESS Drywall Grid Ceiling System have been integrated throughout the project. Rondo’s long-term relationship with Ceiling & Wall Contractors enables the project to run smoothly and the onsite coordination is exemplary.
Sponsored
Baldivis High School, WA

Baldivis High School, WA

Rondo Building Services Pty Ltd

Rondo provided technical design specifications when it came to the development and execution of an SAW Tooth ceiling which is featured in the main areas of the school building. BSHS will feature Rondo’s popular KEY-LOCK Suspended Ceiling System, Steel Stud and Track and EXANGLE products throughout the internal building frame.
Sponsored
Townsville Hospital, QLD

Townsville Hospital, QLD

Rondo Building Services Pty Ltd

Rondo has so far provided over 10,000lm of various wall and ceiling systems, including Rondo Steel Stud Drywall Framing System, KEY-LOCK Suspended Ceiling System and DUO Exposed Grid Ceiling System. More complicated designs arose when it was discovered that the high cyclonic winds would affect the facade of the building.
Sponsored
Parramatta Square, NSW

Parramatta Square, NSW

Rondo Building Services Pty Ltd

Rondo provided a range of market leading wall and ceiling systems for both buildings 3 and 4. Our KEYLOCK Concealed Suspended Ceiling System and Steel Stud and Track Wall Framing System were used for the internal fit out, completed by AUSTRAL Interiors. SMTM Projects used our 1.15 BMT Stud and Track with top hats.
Sponsored
Bankwest Stadium, NSW

Bankwest Stadium, NSW

Rondo Building Services Pty Ltd

Rondo has worked alongside Lend Lease to build a stadium that will benefit Western Sydney’s sporting culture immensely. The stadium required continuous onsite reviews including the change of design by our technical team. Rondo’s Steel Stud and Track Wall Framing system was used for the external walls in addition to our Top Hats and Top Hat cleats.
Sponsored
King George Park

King George Park

RBA Group

The King George Park features the following RBA products:RBA8847-156 – Stainless Steel Toilet | Ambulant SuiteRBA4150-101 – Accessible Compliant Backrest | StandardRBA4040-300 – 40° LH + 300 Straight | Grab Rail SetKB200-01 – Koala Kare Baby Change Table Horizontal | GreyB2890 – Jumbo Toilet Roll HolderRBA8847-428 – Stainless Steel Toilet | Accessible SuiteRBA4090-450 – 90° Grab Rail, Ambidextrous | AmbulantRBA8889-186 – Curvalinear™ BasinB295x14 – Accessible Compliant Stainless Steel ShelfB715E – Bobrick Elan Hand Dryer | StainlessB165-1824 – Glass Mirror with Stainless Frame | BudgetRBA8864-100 – Basin | Wall MountedRBA1083-607 – Water Saving Tap | Satin Stainless 5.0L/m
Sponsored
Ocean Keys, WA

Ocean Keys, WA

Rondo Building Services Pty Ltd

Ocean Keys is a major shopping destination in Clarkson, one of Perth’s new fast growing suburbs. This $100 million expansion completed in October 2014 included the addition of retail and fresh food stores and new residential apartments. The shopping complex is now 65% larger with a total floor space of 35,000m². Rondo supplied Key- Lock Concealed Ceiling System and steel framing for the extensive plasterboard soffits and bulkheads on the project.
Sponsored
Fiona Stanley Hospital, WA

Fiona Stanley Hospital, WA

Rondo Building Services Pty Ltd

Rondo has supplied 80,000l/m of DUO Exposed Grid Ceiling System and 148,000 L/M of Steel Stud Drywall Framing System to three of the main buildings. As the design required a variety of special length products, Rondo has been producing large quantities of these items in advance and storing them at the Rondo warehouse in WA to enable quick supply and install for contractors on site, which ensures the project can progress at a rapid rate.
Sponsored
Burj Khalifa

Burj Khalifa

Boon Edam Australia Pty Ltd

The Burj Khalifa – formerly the Burj Dubai – is a legendary building that can only be described in superlatives. At 828 metres high, it is the tallest building in the world. The Burj Khalifa has 160 floors, more than any building in the world. The building also has the highest floor, the highest façade made of aluminium and glass, the highest nightclub and the highest restaurant, the highest service lift and the lift with the longest travel distance. Finally, the building has the highest positioned revolving doors ever installed in a façade worldwide. In less than 30 years, Dubai has become the leading city in the Middle East and is known for its architectural and technical excellence. The Burj Khalifa has become the symbol of this progress. The Burj Khalifa also takes the title of the highest structure in the world back to the Middle East; the Great Pyramid of Giza used to hold the title 4 millennia ago. International Collaboration The tower was designed by architectural firm Skidmore, Owings & Merril, known for their designs for the Willis Tower (formerly the Sears Tower) and the new One World Trade Center in New York. The three-pronged design is based on the spider lily desert flower and consists of three elements around a central core, with the elements spiralling upwards. It can rightly be called an international project: the construction team consisted of Samsung Engineering & Construction employees from South Korea in collaboration with Besix from Belgium and Arabtec from the United Arab Emirates. The UK consultancy Hyder Consulting was responsible for overseeing construction of the building. In total, companies from more than 30 different countries contributed to the construction of the Burj Khalifa. A Windy Challenge The wind is quite a challenge when building a skyscraper of this size. Without additional measures, the top of the building would move so much from side to side due to the wind that people would become seasick. Dubai is also regularly tested by the shamals: sandstorms that can last for days. As the outer façade of the Burj Khalifa contains an enormous amount of glass, these weather conditions presented a considerable challenge. The three-part design proved to be the solution because the spiral floors break the wind currents around the building, resulting in a stable structure. The World's Highest Revolving Doors Skidmore, Owings & Merril's design includes an observation platform on the 124th floor of the building. Two glass revolving doors provide access to this room. At 442 metres above the ground, these are the highest positioned revolving doors ever installed in the façade of a building. The revolving doors must also be able to withstand an extremely high wind load of at least 3000 Pascal, which corresponds to an F3 class tornado. The Burj Khalifa required two automatic revolving doors with a diameter of 3,000 mm and a total height of 2,700 mm; the cover could only be 300 mm high with the motor installed. Generally speaking, a revolving door with these specifications would only be able to withstand wind loads of up to 689 Pascal. It was clear, then, that not every revolving door manufacturer could supply an entrance that met these requirements. Challenge Accepted Koninklijke Boon Edam was one of only two companies invited to devise a system for this challenge. There were two main problems that had to be solved: the round sides of the revolving door had to be strong enough to resist the wind, and the door set had to be properly fixed so the door wings could not be blown off during a storm. Boon Edam worked closely with Mace, the Hyder Consulting Group, Samsung Engineering and Construction and Turner Construction, the subcontractor, to develop a system that met all these requirements. During the first phase of the process, the second company invited to tender had to give up because their design did not meet the challenging conditions on the 124th floor. Boon Edam persisted in its efforts, and after conducting various wind load and glass tests, it became possible to adapt the construction of the Tourniket to the requirements of the Burj Dubai. A Tornado-Proof Revolving Door at the Burj Khalifa Our proposal for the Burj Khalifa consisted of a Tourniket with specially reinforced door frames twice the width and thickness of a normal revolving door. These were securely anchored with special bolts under the floor to guarantee the structure's rigidity. Although most revolving doors are installed on the top of the subfloor, this door was installed under the top finish layer of the concrete floor. To guarantee the stability of the door set, an extra-thick steel frame was added to the structure. This allows the door wings to easily withstand the wind pressure. Expansion on the 148th Floor in 2014 Boon Edam installed the same specially designed Tourniket revolving door on the 148th floor as on the 124th floor. However, the new project brought an extra challenge: transporting all of the materials from the basement of the building to the 148th floor. First, the materials had to be transported in one lift to the 111th floor. They were then transferred to a second lift, from where everything had to be moved manually from the 149th floor to the 148th floor, to the door's location. Special Projects Based on Standard Solutions The revolving doors we created for the Burj Khalifa were an extreme challenge. The experience and expertise of our technicians combined with the tried and tested technology of the Tourniket enabled us to develop a successful solution. Both revolving doors are now used daily and give visitors a spectacular view of Dubai. The glass design beautifully complements the modern façade of the observation platform and puts Dubai's beautiful skyline in the spotlight.
Sponsored
University of Sydney Queen Mary Building

University of Sydney Queen Mary Building

RBA Group

The University of Sydney Queen Mary Building features the following RBA products:B2890 – Jumbo Toilet Roll HolderB2111 – Vertical Soap DispenserB2112 – Horizontal Soap DispenserB262 – Paper Towel DispenserB1658 1639 – Accessible Compliant MirrorRBA4090-301 – 90° RH + 300 Straight Grab Rail SetRBA4000-090 – 900mm Straight Grab RailRBA4177-161 – Aluminium Shower Curtain TrackRBA4177-999-002 – Taffeta Shower CurtainRBA4090-450 – 90° Ambulant Grab RailRBA4000-060 – 600mm Straight Grab RailB819687 – Folding Shower SeatB683 x 24 – Stainless Steel ShelfB295 x 14 – Accessible Compliant Shelf
Sponsored
Icnssc, QLD

Icnssc, QLD

Rondo Building Services Pty Ltd

Rondo worked closely with Wadsworth Contracting providing KEY-LOCK Concealed Ceiling Systems, Panther Access Panels, plastering beads as well as external 92mm framing, soffit framing, internal 76 & 64mm wall framing.
Sponsored
Subi Centro North Precinct, WA

Subi Centro North Precinct, WA

Rondo Building Services Pty Ltd

Teaming up with contractor Metrex Wall and Ceiling Specialists, Rondo was given the challenge of providing specification details for external wall framing, low height double leaf balustrade framing and external bulkhead stud wall framing, as well as providing a fully engineered design solution for the external façade.
Sponsored
Crown Towers, WA

Crown Towers, WA

Rondo Building Services Pty Ltd

The tower corridors to the hotel rooms followed a slight curve and the Rondo Technical Services Team were engaged to provide many engineered designs for both internal and external wall framings, as well as internal ceilings and external soffit framings. This included Stud & Track, MAXIframe External Wall Framing System, EXANGLE Finishing Sections and PANTHER Access Panels, all needed to meet the detail required throughout the tower and podium levels.
Sponsored
Dublin Airport

Dublin Airport

SAS International Australia

SAS International designed and manufactured a range of solutions for the new 75,000 square metres Terminal 2 at Dublin Airport, Ireland. According to Dublin Airport the new second terminal will be capable of comfortably handling up to 15 million passengers per year. Specification demanded that durability, ease of maintenance and acoustics were considered. SAS International worked with architects Pascall + Watson to design the ceiling solution answering the architect’s brief to factor in ongoing maintenance conducted by Facilities Management teams in the future. The design of these large sized ceiling panels required careful consideration at design stage to ensure they would be manageable when working at a height. Designed and developed specifically for Dublin Airport was 35,000 square metres of ceiling systems, installed in the main departure area, walkways and baggage handling areas. This solution looks like any other suspended metal ceiling system as it provides an aesthetically pleasing flush finish. But where this product differs is its ingenious way of allowing access to the ceiling void and services for ongoing essential maintenance. This is of particular benefit in high traffic areas such as Dublin airport as it enables a corridor to remain in use rather than having to close off the entire route. SAS International manufactured the 20,000m2 of large aluminium frames for the fabric ceilings which creates a striking central feature. Working closely with SAS International were local installers Platt and Reilly who applied the stretched fabric to the frames on-site and hoisted them into position. Creating a comfortable environment for traveller and worker was helped with the use of acoustic floating rafts and perforated metal ceiling solutions (with integrated acoustic pads) to provide the necessary acoustic control for this project. Lighting was suspended neatly between the rafts to also provide a modern finish to the corridors. In addition Perimeter heating and air handling grilles also enhance the experience.
Sponsored
Caves Beach Hotel, Lake Macquarie, NSW

Caves Beach Hotel, Lake Macquarie, NSW

Alspec

Featuring many Alspec window and framing products
Sponsored
Kurrawa Surf Club, Broadbeach QLD

Kurrawa Surf Club, Broadbeach QLD

Alspec

Gold-hued aluminium louvres adorn the Kurrawa Surf Club at Broadbeach, an impressive new landmark.
Sponsored
Westin Hotel, WA

Westin Hotel, WA

Rondo Building Services Pty Ltd

Wall types can vary significantly on such a large project, and the Rondo team were required to design a framing system solution that would be suitable for the vast majority of the project. Due to large wall heights to the ballroom areas, Rondo MAXIJamb members were required and specific Rondo engineered design detail was provided for bathroom wall locations, where the Rondo framing was to support stone linings.

Showing 1-36 of 149

Feedback