Designed by Silver Thomas Hanley (STH) Architects, the structural additions provide four extra levels of useable space above the existing emergency department. As a construction-managed project, the design and construction teams were able to work in concert to ensure all specifications were correct and appropriate at every stage of the work. Having considered the project challenges, including site constraints, access and speed in which the project needed to be completed, CW175 was chosen for its flexibility, engineering and structural integrity.