NBS Source
I'm a manufacturer

"liquids damage protection systems"

1,223 results found

Sort by:

Showing 1-36 of 158

Sponsored
Robust passive fire protection for major ice hockey stadium - Jordal Amfi Stadium Norway

Robust passive fire protection for major ice hockey stadium - Jordal Amfi Stadium Norway

Hempel

At the new 6,000-seater Jordal Amfi ice hockey stadium in Oslo, Norway, player and spectator safety is a top priority. The stadium owner wanted a coating system which included passive fire protection, so, when Danish-based Give Steel was contracted to produce the steel structures, they had to not only meet the customer specification for fire protection but also consider the logistics of the project.The steel pieces were produced in Denmark, and Give Steel needed a coating system that was robust enough to protect the steel during transportation and erection onsite.
Sponsored
Iconic Maison de l’Ordre des Avocats fire-protected by Hempafire Pro 315

Iconic Maison de l’Ordre des Avocats fire-protected by Hempafire Pro 315

Hempel

With a glass façade symbolising the transparency of justice and a glossy metal exoskeleton, the new Maison de l’Ordre des Avocats (House of the Paris Bar Association) is a stunning addition to the French capital’s new Batignolles judicial city. For the building owner, safety is a top priority. Therefore, the exoskeleton needed a proven passive fire protection coating that would enable the steel to maintain its load-bearing capacity for up to 60 minutes during a fire, giving those inside valuable extra time to evacuate.The challenge Specialist paint application and surface treatment company ROTH & Cie was contracted to apply the passive fire protection coating system. ROTH & Cie has worked with Hempel for many years and was keen to work with us on this project. However, due to the project schedule, the tubular exoskeleton framework was delivered to the construction site with a competitor’s epoxy primer already applied. ROTH & Cie therefore wanted a Hempel passive fire protection system that would work with the existing primer. Also, as building aesthetics are important in the overall design, the exoskeleton needed a high-quality matt satin finish. The solution Our solution was to specify a system of Hempafire Pro 315 and Hempathane 55750. A single component intumescent coating, Hempafire Pro 315 complies with the EN 13501-2 standard for the fire classification of construction products. It is optimised to provide 60 minutes of passive fire protection, as well as partial protection up to 90 minutes. In addition, thanks to its exceptionally low loadings, Hempafire Pro 315 requires significantly lower dry film thicknesses than competitor products. As a result, ROTH & Cie could apply the coating in a thinner coat, significantly reducing paint consumption, application time and project costs. The full system was completed with Hempathane 55750, a polyurethane topcoat with quick crosslinking properties that provides the matt satin appearance required by the specifications. Our dedicated passive fire protection R&D Centre in Barcelona, Spain verified that Hempafire Pro 315 could be applied on top of the existing primer. The entire system was spray applied using an electric airless pump, which is ideal for construction sites as it does not require an air compressor. The project is just another in a long line of successful collaborations with ROTH & Cie, which also include previous passive fire protection coating projects, most notably La Halle Secrétan covered market and La Samaritaine department store, both in Paris.At a glance Project Name: Maison de l’Ordre des Avocats (House of the Paris Bar Association) Customer: ROTH & Cie System: Hempafire Pro 315 + Hempathane 55750 Volume: 4,080 litres
Sponsored
Termimesh - Protecting Historical Landmarks – Norwood Oval Adelaide

Termimesh - Protecting Historical Landmarks – Norwood Oval Adelaide

Termimesh

Termi Home & Commercial (SA) were proud to be a part of the historic Norwood Oval Redevelopment project in Adelaide, South Australia. As one of the most iconic football grounds in Adelaide only a non chemical termite management solution would do. We designed and installed the Termimesh System keeping in mind both the historical significance and the new facilities.The suitability of the Termimesh system for this project is based on its flexibility, which was necessary due to complex external geometry of the new construction and integration with the existing buildings. This presented challenges in performing remedial work. For example the Sir Edwin Smith Grandstand is heritage listed meaning minimal work was allowed to the external façade. This is where the strength of our termite management system lies. It can be customised for each individual project. Our estimating and design team will work alongside the architect, marking up plans and explaining how the system is applied to the design. Which in the case of the Norwood Oval was extremely important. We are on hand during the construction phase to iron out any challenges that may arise ensuring the installation process is simple, smooth and straightforward.Termimesh has maintained our position as market leader in termite protection in the South Australian construction industry for over 25 years, with a strong domestic and commercial portfolio. We are one of few companies that are triple certified to AS48001, ISO9001 and ISO14001 which delivers additional peace of mind for our clients.CONSTRUCTION TEAMSchiavello ConstructionOur team has a good relationship with the lead contractor, Schiavello, having worked on past projects together. They knew our capability and after a detailed review of the construction programme, we were sure we could meet their requirements. As a supporter and sponsor of the Norwood Football Club, Schiavello recognised the significance of the project for the community.  PROJECT DETAILSClient                          City of Norwood, Payneham & St Peters. Specifying Architects                                    Tridente ArchitectsInstallation Year                                              2019Installation Duration                                      7 monthsProject Value                                                    $9 mil TECHNICAL DETAILSInstallation Type                                             NumberService penetrations                                     200Column blockouts                                          7.5 LM                 Cluster penetrations                                     4Control joints                                                   315 LMConstruction joints                                        73 LMSaw cut service penetrations                    147 LMConcrete slab pours                                      NumerousPerimeter                                                          147 LMKey Termimesh Personnel                          Drew Wilson- Account Development ManagerShane Waye, Senior EstimatorAnthony Bennett- Operations Field Manager
Sponsored
Louvre Museum Expo - Duc de Luynes, France

Louvre Museum Expo - Duc de Luynes, France

Guardian Glass (Australia)

In museums, glass displays protect valuable artefacts from damage or distress, whilst presenting them in the best possible light. Sometimes the glass itself can act as an obstruction to the view. Unwanted glare, reflections or reduced lighting levels can obstruct visitors’ views through the glass, preventing precious works of art from being seen clearly and in their original colour and detail.
Sponsored
Government Building Parramatta

Government Building Parramatta

Tremco

Challenge750m2 roof with a large quantity of vents, air conditioning units and other equipment on the roof. Add to this problem damaged aging torch membrane, combined with Governments regulations regarding solar absorption and reflectivity of the building posed a real challenge for the applicator when determining a solution for the job.A second challenge for this job is the location of the building was located in the built up CBD of Parramatta with neighbours in close proximity, which meant the solution needed to be neighbourhood friendly.SolutionGiven the complexity of solution required for such a job AlphaGuard BIO is the only product which ticks all the boxes. AlphaGuard BIO is an extremely high performing composite waterproofing system, designed with a focus on roofing restoration. Due to AlphaGuard BIO being a liquid, it makes it ideal for jobs where there are machinery on the roof which needs to be worked around.AlphaGuard BIO has the ability to be installed over various existing roofing membranes in order to minimise tenant disruption and extend the life of the roof for an additional 20 years.It cures to form a durable rubber membrane surface that provides a lasting and easy-to clean waterproof coating. AlphaGuard BIO may be used to apply a seamless, monolithic waterproof membrane to concrete, primed metal, or existing roofing membrane surfaces.AlphaGuard BIO’s low VOC will minimise offensive odours to current tenants and applicators. The white top coat provides high solar reflectance, reducing the building’s operation costs and complying with Section J1.3(b) of the 2019 NCC.
Sponsored
Sunshine Coast University Hospital

Sunshine Coast University Hospital

Construction Specialties

Being one of the largest public healthcare precincts in Australia at 160,000 m² and spread across 20 hectares of land at Birtinya north of Brisbane, we present the 750 bed Sunshine Coast University Hospital (SCUH). The SCUH has been designed for Queensland Health to be a world class health facility providing exceptional healthcare to its patients as part of Queensland Health’s vision for the future.Incorporated within this Hospital’s health precinct, this state-of-the-art facility offers numerous services for staff and patients. With all that the SCUH has to offer, it was vital that all the equipment and fittings that were required needed to be compliant, safe, practical and had an exceptional appearance. This is where the CS Group was able to provide a portfolio of products to the project that were both practical and aesthetically pleasing.All hospitals have high volumes of wheeled corridor traffic, these day-to-day movements are commonly encountered in a busy hospital. Due to this traffic, it is difficult to keep walls in their original pristine condition. To try to limit the damage that can be caused by wayward trolleys and gurneys, wall protection is put in place.Construction Specialties have supplied a portfolio of products to the SCUH to meet these needs. Starting with their corner protection for the gyprock walls, the CS Group’s VA 250N corner guard can be found throughout the Hospital in both 90 and 135 degree configurations protecting salient corners from damage. Protecting the walls from damage is CS Model SCR-48N crash rail, a 152 mm wide x 32 mm deep Acrovyn crash rail that is installed in the Hospital in both single and double runs for maximum protection. CS Model HRB-4CN Acrovyn handrail, which also acts as a high-level bump rail, completes the wall protection package.Posing a separate challenge to designers were the two Isolation Wards. Both are located within the Hospital in such a way that neither has access to an external window. Rather than have patients stare at blank walls during their stay, CS were asked if we had a solution to the problem. Our graphic imaging product, Acrovyn by Design was suggested as a possible solution and was accepted. Both wards now have a full height wall mural of a relaxing beach scene to look at rather than a typical blank white hospital wall alongside their beds.With such large footprints, each floor of the Hospital required extensive use of expansion joint covers. Construction Specialties were called on to help with the design and specification of expansion joint covers for the project. The CS Group’s SGR Model expansion joint cover was selected for the project as it is available in various widths, the Hospital being 5 floors, as well as allowing a flush mounted finish. The SGR was also chosen for its ability to accommodate wheeled traffic and meet the stringent requirements of infection control associated with a hospital project.Beautiful and practical are two words that can be used to describe the Sunshine Coast University Hospital. An amazing project featuring various CS products throughout the Hospital.
Sponsored
Polaris Data Centre

Polaris Data Centre

Construction Specialties

To protect the priceless infrastructure and mission-critical IT information in Australia’s first custom built, high-tech data centre, Polaris, Project Manager Thiess turned to the leading manufacturer of specialist building products, Construction Specialties.Integral to the $121 million construction was the regulation of airflow to safeguard the computer hardware; Construction Specialties’ customised performance louvres were the only product in Australia able to meet this construction challenge.Boasting 14,000m2 of floor space on 5 storeys with 7000m2 of raised floor over three data centre levels, the project, based in Springfield, Queensland, is the largest of its kind in Australia and will be Queensland’s only Tier 3+ data collection point.So important were the Construction Specialties performance louvres to the development, much of the building design was driven by the positioning, material specifications and design of the louvres.Lawrence Issa, Project Manager for Construction Specialties, and project partners Darryl Wright and Steve Emery of Project Sales worked closely with the Polaris construction team from project inception to completion to devise the most effective weatherproofing and airflow option for the building which also matched the intended aesthetic.“In-depth collaboration with the Polaris team led to the selection of our Architectural Line Louvres, of which two types were used – our RS7305a and LSM louvre models,” Lawrence said. “Unlike other louvres on the market, this range prevents up to 99% water penetration and maximises airflow, while also complementing the building facade as the horizontal louvre frames selected are hidden from view.“Our performance louvres cover 345m2 of the exterior building and are specifically customised in terms of size, shape and colour for the data centre,” Lawrence said.Miguel Thievent, Senior Project Engineer at Thiess, remarks that the CS Louvres perform to the highest standard, which was essential in meeting the building specifications.“It was vital we didn’t compromise on weather proofing and airflow,” Miguel said. “For example, we have six generators integral to maintaining the whole IT system in case of power failure which would not run if the airflow was affected or they were damaged by rain.“The Construction Specialties performance louvres were the only ones on the market that could guarantee damage would not occur as a result of bad weather conditions,” Miguel said.Construction Specialties’ performance louvres are at the leading edge of louvre design and are tested under real world conditions to meet the maximum standards demanded.Construction Specialties offers a broad selection of louvres under 3 main categories:Storm Resistant/Performance Louvres – The main objective of Performance Louvres is to allow the passage of air, whilst providing the area beyond the room with protection from rain penetration.Standard Louvres – A standard louvre will provide the maxiumum airflow required, but with minimal rain defence.Screening Louvres – Screening louvres, are low cost solutions that hide plant or other equipment from view.CS Louvre systems are available in a comprehensive range of finishes and colours, ensuring there is a Construction Specialties Louvre system to suit most aesthetic and performance needs.Louvre panels are factory assembled in a controlled and quality assured environment and provided to site in a fully finished modular form; thus, allowing for trouble-free and fast installation.A comprehensive range of accessories including insect/bird mesh and blanking panels in various materials and finishes is available to complete the application.
Sponsored
The Beverly, Broadbeach Waters

The Beverly, Broadbeach Waters

ECOCLEAN

LOCATIONBroadbeach Waters, QueenslandCOLLABORATIONDesigned by: Smek DesignBuilder: Live BuildBRIEFPreserve and protect the concrete elements of the high-end residential homeMATERIAL & APPLICATIONECOCLEAN Concrete Sealer(Specified concrete on the project including the bar area, front fence, and garden bed)OUTCOMEThe Beverly is a stunning $7.7mil high-end residential building sitting right on the water at Broadbeach Waters QLD. It was a pleasure for our QLD team to work in such a fantastic location. Our Concrete Sealer will keep the concrete looking clean, allow water to bead off the concrete and reduce carbonation which will extend the asset life of the concrete.TESTIMONIALWorking with ECOCLEAN has been a stress-free experience. The whole process was professional and positive from start to finish. The work is perfection. The concrete-look colour stain is seamless and the sealer used for all our pre-cast concrete panels have not had any issues with water damage or staining. I would highly recommend them and would be using them for all future projects.Ryan and Guech Venville, Homeowner
Sponsored
New Royal Adelaide Hospital

New Royal Adelaide Hospital

Construction Specialties

The core function of a hospital is to attend to the physical, emotional, and mental needs of its patients. Also, the environment must be comfortable, clean, and serene to assist with a patient’s recovery. New Royal Adelaide Hospital (NRAH) is a perfect example of a state-of-the-art facility that provides a great service for city of Adelaide and surrounding regions.This 800-bed hospital is the largest hospital in South Australia. Sprawling across 25 acres, containing open green spaces throughout the precinct to assist with healing and relaxation, a commercial zone with underground car park and featuring a comprehensive range of clinical care to an estimated 85,000 inpatients and 400,000 outpatients each year.Many CS products were specified and installed in the development of the New Royal Adelaide Hospital. Our expansion joint covers were installed throughout the interior and exterior of the hospital, these expansion joint covers are critical for the development of the hospital to safely accommodate extreme building movement. An example would be the expansion joint SJHD, this seismic metal floor cover can be used in both interior and exterior settings and can provide 760mm of plus movement during a seismic event, and the expansion joint SGR is perfect for interior applications, it is hygienic and accommodates lightweight wheeled equipment, making it ideal for the NRAH. Our expansion joint covers offer a range of sizes, aesthetics, and performance variations. Each model perfectly suited for different environments.Our Acrovyn products were also installed throughout the NRAH. Acrovyn provides wall and door protection throughout the interior space of the building. In an environment like a hospital where there’s a lot of foot traffic and wheeled movement, it is imperative to have your walls protected from any potential impact. Our SCR-64N crash rail was installed throughout the hospital, mainly in the corridors to protect the walls from the bed carts. The HRB-10C, our handrail/crash rail combination is another product installed, which our ligature resistant featured component (a common feature used in behavioural health facilities) and the HRB-10C was supplied in both our Acrovyn Solid Colours and our Acrovyn Woodgrain as the handrail component. Throughout the hospital, the corners were also protected from damage by installing Acrovyn and Stainless-Steel corner guards. Both corner guards are a simple yet effective solution in protecting the vulnerable areas of the hospital. For hospital settings, Acrovyn is an environmentally friendly product, that is pleasing to the eye but also very functionable.The NRAH has been operating since 1841 and it was a privilege to have CS products featured throughout the hospital.
Sponsored
Invermay House

Invermay House

Sculptform

Using our Tongue & Groove Cladding system, Moloney Architects created this stunning Spotted Gum timber cladding facade which meets the BAL 29 requirements of the project. Clear Oil coating provides protection for the timber while allowing it to naturally grey, blending into the colour palette of the hillside.
Sponsored
Multi-level Apartments with Enclosed Balcony, NSW

Multi-level Apartments with Enclosed Balcony, NSW

Breezway Australia Pty Ltd

Designed by Tony Owen Partners, Breezway Altair Louvre Windows were recommended to the Developer by the Architects at Tony Owen Partners due to their visually appealing aesthetics, the products full certification and compliance with Australian Standards, and Breezway’s strong reputation in the window industry. Altair Louvres with the Stronghold System have been strategically placed on the corner of the building as a key visual feature. Being a high quality window system, Altair Louvres will provide protection from the elements and are restricted to comply with Fall Prevention requirements.
Sponsored
Preserving a World Heritage Site

Preserving a World Heritage Site

Atlantis

APPLICATION: Road CellPROJECT LOCATION: Chan Chan PeruPROJECT DETAILS: Protecting Walkways and Preventing erosionPROJECT COMPLETION: Sep 2016Chan Chan, the largest City of the pre-Columbian era in South America is now an archaeological site in La Libertad Region, 5 kilometres west of Trujillo Peru. Chan Chan is located in the mouth of the Moche Valley and was the capital of the historical empire of the Chimor from 900 to1470, when they were defeated and incorporated into the Inca Empire. The city Chan Chan spanned 20km2 and had a dense urban centre of 6 km2.The increasing popularity of the site forced the authorities to consider how to protect the walkways and to provide drainage, to remove rain water from the site to prevent erosion. The solution was to use the Atlantis® Road CellTM 53mm drainage cell. This installation made Chan Chan the second World Heritage site in all of Peru to have a highly technical system of protection of the original pavement installed and it covered almost the entire tourist circuit with the exception of the funeral zone.A layer of water proof membrane was laid down on the walkway and the the Atlantis® Road CellTM 53mm drainage cells were clipped together on the water proof membrane and filled with gravel. Thus providing protection for the walkway and also providing a drain for directing rain water away from the archaeological site to ameliorate erosion. Also it facilitated the access of visitors, especially those with disabilities, by providing a firm stable walk way.In all 1,700 m2 of the Atlantis® Road CellTM 53mm drainage cell were laid, and filled with gravel.
Sponsored
Macquarie University Car Park Turf Cell

Macquarie University Car Park Turf Cell

Atlantis

APPLICATION: 52mm Turf CellPROJECT LOCATION: North Ryde NSWPROJECT DETAILS: Macquarie University Permeable Overflow Car ParkPROJECT COMPLETION: March 2017Established in 1964, Macquarie University began as a bold experiment in higher education. Built to break from traditions: to be distinctive, progressive, and to be transformational. Today its pioneering history continues to be a source of inspiration as they celebrate their place among the best and brightest minds.When Macquarie University’s existing cark park became too small for the amount of cars now using it, it was decided to construct an overflow car park. However, not just any car park, but in keeping with their innovative thinking, an environmentally friendly permeable car park. Of course the Atlantis® Turf CellTM system was chosen, so that turf covered parking spaces could be provided.The project required 9,843sq. m of Atlantis® Turf CellTM system, which is constructed from 480mm x 260mm x 52mm panels and has a rigid interlocking clipping system and is made from high quality recycled polypropylene. The project was undertaken by J & G Excavations and Asphalting (NSW) Pty Ltd.The Turf CellTM cells were laid on a bed of permeable soil, and filled with sandy soil and turf was then placed on top of the linked Atlantis® Turf CellTM cells and rolled with a heavy roller to press the roots into the soil in the cells, where they were protected from compaction and could grow freely both horizontally and vertically.The Turf CellTM system is another Atlantis invention, and is specifically suited for car parks, access roads, aircraft taxiways and helicopter landing pads as it has the following features:a high load bearing of approximately 4000t/sq. M;protects the root system of grass from compaction, while allow for vigorous horizontal and vertical root growth;permits surface water absorption and infiltration;has a long use life; andaesthetically, the system allows the grass to fill in completely, creating a lush lawn with an invisible reinforcement structure.
Sponsored
Functional Coatings - Parramatta Leagues Club Carpark

Functional Coatings - Parramatta Leagues Club Carpark

ECOTONE

CollaborationArchitects: HassellBuilder: ADCO ConstructionsBrief Protection of the carpark’s white appearance from staining, soiling and future graffiti strikes.Material & ApplicationECOCLEAN Porosity SealerECOCLEAN Self-Cleaning CoatingOutcomeAfter a number of years since application, the car park continues to self-clean and keep its as-new white appearance through the photocatalytic properties of our ECOCLEAN dual coating system. Harmful compounds are continuously broken down when they come into contact with a coated surface in addition to benefiting from graffiti resistance.Testimonial“This is an example of our functional and protective coatings removing the barriers to having white or fair-faced concrete or cladding in building designs. Their self-cleaning, anti-carbonation, anti-fungal, and graffiti resistant properties mean buildings look as good as new, enabling fresher and lighter colours to be more prevalent in our built environment.”Tony Watling, CEO ECOTONE & ECOCLEAN, Australia & New Zealand
Sponsored
Margaret Whitlam Grandstand – Waverly Oval

Margaret Whitlam Grandstand – Waverly Oval

Tremco

​About the ProjectThe sporting history of Waverly Oval dates from the 1880s when the Waverley Cricket Club gained approval to construct a pitch. Football codes also began using the park at this time. In 1890, the oval was created, and in 1898 the Waverley District Baseball club was founded at the oval.The first pavilion was built by the Waverley Cricket Club in the 1890s and Council built a second pavilion in 1908 with expanded facilities for the benefit of the cricketers and the public. This Pavilion was replaced in 1939 with an Inter War Functionalist style building. In April 2012 the new Waverley Park Pavilion was named the Margaret Whitlam Recreation Centre, in honour of the long association the late Margaret Whitlam (AO) had with the Waverley area. The pavilion was chosen because of its civic, community and recreational facilities incorporating several important aspects of Margaret Whitlam’s life.ProblemRemediation of the pedestrian areas of Margaret Whitlam Grandstand was completed 5 years ago but unfortunately was not successful due to product failure (not Tremco). Council contacted Tremco to provide an acceptable solution with the requirements that the new system needed to come with a 15 year warranty.The challenge of this project was not the 15 year warranty period, but the need for a low odour solution due to the area being in a Public/Government venue. Not all membranes have Low VOC properties.SolutionTremco recommended Vulkem 350/951NF/951NF for the job, which is not only low odour but also offers a 15 year warranty period as required from the council. Tremco offering onsite support throughout the project gave the council confidence in our product.Vulkem 350/951NF/951NF, is a composite waterproofing system comprised of tough-curing liquid polyurethane. It cures to form a durable rubber membrane surface that provides a lasting and easy-to-clean waterproof and trafficable coating. Textured surfaces for traffic will use an aggregate-laden top membrane to aid in wear and slip resistance.
Sponsored
Permeable Car & Trailer Park

Permeable Car & Trailer Park

Atlantis

Snapper Creek Car Park was developed as an environmentally friendly permeable car park. As such the Atlantis® Turf CellTM and Atlantis® Gravel CellTM systems were chosen, to provide gravel driveways and grass parking areas, thus preventing compaction of the soil and to protect the grass and to stabilize the gravel and provide a permeable car park.The parking areas were divided into car only parking and car & trailer parking.The area, consisting of natural sandy material, was excavated to a depth of 300mm, and a tensar grid was placed into the excavation and the excavated material placed back on top of the tensar grid and compacted.A layer of 100mm of gravel was then place on the areas where the Atlantis® Gravel CellTM modules were to be used and the Atlantis® Gravel cellTM modules positioned thereon and filled with gravel.The Atlantis® Turf CellTM modules were installed and filled with soil and then the area was grass seeded; no turf was used. The project was completed in mid 2014 and was at that stage semi grassed and in use.The project required 4,300sq. m of Atlantis® 52mm drainage cell, which are 480mm x 260mm x 52mm panels and have a rigid interlocking clipping system and are made from recycled polypropylene.In August 2017, the operators of the car park, which is still operating, were contacted and they stated that they were extremely happy with the condition of the car park, even though it has heavy traffic as there is a boat ramp there, and some areas have been flooded by Snapper Creek.The Atlantis® Turf CellTM & Atlantis® Gravel CellTM systems are specifically suited for car parks, access roads, aircraft taxiways and helicopter landing pads as it has the following features:a high load bearing of approximately 4000t/sq. M;protects the root system from compaction, while allow for vigorous horizontal and vertical root growth;permits surface water absorption and infiltration; andhave a long use life.
Sponsored
The Icon - St Kilda

The Icon - St Kilda

Interpon Powder Coatings

A bold and significant new development has emerged in St Kilda as a ‘liveable Lego tower’, rising in tiered rainbow cubes that appear to balance like building blocks. Aptly named The Icon, the distinctive new building is wrapped in expanded aluminium mesh that changes colour as sunlight moves.The inspiration of artist Matthew Johnson, who worked with Jackson Clements Burrows Architects to conceptualise the distinctive complex, was achieved with Interpon Powder Coating on board as a collaborative partner.“My vision for the project was for people look up and see something interesting, to see something that is in a sense iconographic – as a marker or reference point,” explains Matthew.Interpon were involved with the project “right from the start”, explains Gareth Connell, Regional Specification, Interpon. Their association began after they were introduced to Pace Developments to discuss colour and product selection for the external façade.“We work closely with Interpon, and Pace asked us to quote with the product already powder coated,” says Ian Dunstan, southern regional sales manager at Locker Group, who manufacture perforated and expanded metal. Interpon were able to step in and develop the colour range separately, to meet the design brief and provide an ultra-durable coating system that meet the expectations of all parties.“The team at Interpon were very accommodating, engaged and professional in taking the concept on board,” says Matthew. “We were able to manifest unique colours based on the ratios I created with their chemist, inventing a whole new series of colours. This was crucial, as each level is depicted in different colour hue variations from earth to sky, which cross reference the nature of the geographical and environmental stratums. This flux of seasonal change is portrayed through subtle tonal gradation. Working with Interpon was a very fluid operation.”Interpon has collaborated on several high profile property developments and high rises over the years – although perhaps none quite as unique or with as many distinct characteristics as The Icon. “The nature of expanded aluminium mesh is such that it is formed by shearing and expanding aluminium sheet to create the ‘3D form’ effect. A visually appealing system for a façade, the shearing of the metal can present issues with very sharp edges, particularly in aggressive coastal environments,” Gareth explains.“Part of understanding this project was to comprehend as many elements as possible. Given the location was in St Kilda, with the bay just over 1.5km away, environmental considerations such as UV degradation, exposure to corrosive sea salts and prevailing winds needed to be considered.”After reviewing available data, such as Bureau of Meteorology weather patterns and local geography and topography maps, a specific duplex or two-layer powder finishing system was specified.“This consisted of a controlled preparation process for the expanded aluminium sheets. An epoxy barrier primer (was specified) to provide enhanced protection and to build the sharp edges in order to minimise issues associated with filiform corrosion. And the ultra-durability polyester powder top coat was developed in 34 distinct colours,” Gareth says.After the colour range was developed, it was applied by powder coating specialists Mansutti Bros. Lead by managing director Claude Mansutti, the team refinished hundreds of mesh panels over a period of nine months.“It was a major benefit to be using powder coating because, unlike liquid paints, powder is cured once it comes out of the oven and it’s ready to go once it’s cooled down. If they were painted, the drying phase could delay the process from refinish to installation by up to two weeks. It meant we were able to keep to a very strict schedule,” Claude says.“The project involved a lot of large spreadsheet work. There were 17 floors and over 30 colours, with panels in 15 sizes; it was quite a matrix to work with. But the end result is so different and so unique. It’s an interesting design and I’m sure it’s going to be a talking point for the area for many years.”
Sponsored
Rosewood Aged Care

Rosewood Aged Care

Markham Global PTY LTD

There were two sets of challenges involved in the Rosewood Aged Care.Firstly, waterproofing the basement. The basement was excavated around a heritage-listed building, which had to stay undamaged for the duration of the works. Piles and shotcrete were implemented for the construction, but there was no scope to install a membrane due to space and other limitations. The Markham BASE-TECT system was ideal for this situation.Second were the requirements for moisture control and permanent hygiene protection for the interior floor slabs of the residential parts of the building. This is a more routine challenge, faced by aged care facilities with concrete floor slabs. AQURON 2000 MEDI+ was selected for concrete curing enhancement and permanent hygiene sealing.
Sponsored
Sea Temple Apartments

Sea Temple Apartments

Tremco

About the ProjectSea Temple is unrivalled as THE 5-star resort in Port Douglas. The beautifully manicured grounds, stylish accommodation, world class facilities and spectacular 3000m2 central swimming lagoon, places Sea Temple in another league when compared with other resorts in the region. Sea Temple Luxury Apartments is a collection of 6 stunning 2 and 3 bedroom Swim-out and Penthouse apartments within the Pullman Sea Temple resort complex. The apartments have been selected for their ideal positions within the resort, relaxed atmosphere and unparralled quality facilities set the scene for pure enjoyment.The ChallengeWhen you are working with one of the most prestigious resorts in Port Douglas where the highest quality of facilities, services and experiences are expected, you need to provide unparalled results. Also when your guests are paying a premium price, your solution needs to be low odour so as to not disrupt the experience of paying guests whilst the work is being completed. The harsh North Queensland conditions demand a high quality product strong enough to withstand all types of weathering. So when Sea Temple Apartments discovered a problem with their waterproofing a high quality but aesthetically pleasing solution was the only option.Tremco SolutionWith the contractor previously using liquid membranes, a more robust and durable solution was needed which would also provide the warranty, demanded of a high quality building such as Sea Temple.Having previously completed many other successful projects with Tremco Systems, the applicator had trust in the Tremco solution, and a dual layer of Tremproof Torch 3000 seemed the logical choice for this end high development. The low VOC and odour levels of Tremproof Torch 3000 helped seal the deal in the built up 5 star accommodation to reduce neighbourhood discomfort.
Sponsored
Silkstone State School Parking Bays

Silkstone State School Parking Bays

Atlantis

APPLICATION: 52mm Drainage Cell.PROJECT LOCATION: Silkstone Qld.PROJECT DETAILS: Parking Bays at the Silkstone Primary School.PROJECT COMPLETION: Sep 2013.Atlantis system saves big old tree.At Silkstone State school Qld. a contentious issue arose. The school required car parking and a sealed one at that. But, in the proposed car park was a huge old tree. The tree could be cut down and the roots dug out or the tree couldbe left, with open soil above the root system to allow for infiltration to keep the tree healthy; but this would lose atleast six car spaces. What was to be done?The answer turned out to be simple – keep the tree, but surround the tree with Atlantis® Gravel Cell™ 52mm cells.Hence while the rest of the car park was sealed, the areaaround the tree was prepared and the 52mm cells werelaid and clipped together there and filled with 10mmgravel. This area was of sufficient size to provide 3 carplaces on each side of the tree and a driveway in frontof the tree, while at the same time allowing rainfall toinfiltrate through the gravel into the root system.Thus we had a win-win situation. Not only was the treesaved, and money saved on not having to remove it, butthe root system of the tree was protected by the GravelCell™ system, and six extra car spaces were created.
Sponsored
Resin Guard - Style Closet

Resin Guard - Style Closet

Real World Epoxies Pty Ltd

Protective epoxy flooring in a photography studio.
Sponsored
Resin Guard - Xstrata Zinc

Resin Guard - Xstrata Zinc

Real World Epoxies Pty Ltd

Protective epoxy flooring in mining maintenance workshop.
Sponsored
Resin Guard - United Christian Broadcasters

Resin Guard - United Christian Broadcasters

Real World Epoxies Pty Ltd

Protective epoxy flooring in the building of a radio broadcaster.
Sponsored
Resin Guard - Residential Living Area

Resin Guard - Residential Living Area

Real World Epoxies Pty Ltd

Protective epoxy flooring in residential living area.
Sponsored
Resin Guard - RWE Research Labs

Resin Guard - RWE Research Labs

Real World Epoxies Pty Ltd

Protective epoxy flooring in a warehouse and research lab.
Sponsored
Resin Guard - Lavender CE

Resin Guard - Lavender CE

Real World Epoxies Pty Ltd

Protective epoxy flooring in a large warehouse and manufacturing facility.
Sponsored
Seaside Home, Casuarina NSW

Seaside Home, Casuarina NSW

Alspec

Invisi-Gard - Ultimate Protection for your Seaside Home
Sponsored
Emu Bay, Kangaroo Island SA

Emu Bay, Kangaroo Island SA

Alspec

Our superior sliding doors, windows and framing solutions provide maximum durability and protection.
Sponsored
St Mark's Catholic College

St Mark's Catholic College

ECOCLEAN

COLLABORATIONArchitect: Morson GroupBuilder: Reitsma ConstructionsBRIEFApplication to the coloured precast concrete and compressed fibre cement sheeting of the newly built auditorium.MATERIAL & APPLICATIONECOCLEAN Porosity SealerECOCLEAN Self-Cleaning CoatingOUTCOMEThe ECOCLEAN team was engaged to find solutions that would protect the appearance of the facades of the St Mark’s Catholic College auditorium which included easy graffiti removal. The award-winning project is protected by our long-lasting functional coatings for years to come.
Sponsored
Portsea Surf Life Saving Club

Portsea Surf Life Saving Club

ECOCLEAN

LOCATIONPortsea, Victoria – AustraliaCOLLABORATIONArchitect: CarrBuilder: IB ProjectsDeveloper: Portsea Surf Life Saving ClubBRIEFPortsea Surf Life Saving Club was given an $8 million contemporary redevelopment where part of the brief was to protect the glass and external concrete to reduce maintenance costs and dirt build-up.ECOCLEAN were engaged to coat the building’s glass windows (including the observation room) and all external concrete with our protective Self-Cleaning Coating. The coated surfaces will self-clean and look as new with the added benefits of purifying the air the that comes in contact with.MATERIAL & APPLICATIONECOCLEAN Glass TreatmentECOCLEAN Self-Cleaning GlassECOCLEAN Porosity SealerECOCLEAN Self-Cleaning CoatingOUTCOMEThe redevelopment of the surf club not only brings the building into the present but our ecofriendly and sustainable coatings will keep the concrete and glass protected and clean well into the future.
Sponsored
Bayview, NT

Bayview, NT

Alspec

Combining the ventilation qualities of wide glass louvre windows with the protection of Invisi-Gard security screens ensures this Darwin home stays cool and secure.
Sponsored
Newmarket Residences & Figtree Pocket Apartments

Newmarket Residences & Figtree Pocket Apartments

ECOCLEAN

LOCATIONRandwick, New South WalesCOLLABORATIONDeveloper: CBUS PropertyArchitect: Bates Smart and Smart Design StudioBuilder: GanellenApplicator: Master CoatingBRIEFPreserve and protect concrete elements of Figtree Pocket apartments and Newmarket Residences.MATERIAL & APPLICATIONECOCLEAN Porosity CoatingECOCLEAN Self-Cleaning CoatingOUTCOMEOur invisible eco-friendly coatings will seal and protect the high-end concrete from water ingress and atmospheric carbonation. The coating will also provide self-cleaning properties via photocatalysis which utilises daylight, rain and moisture to self-clean external surfaces.
Sponsored
University of Sydney - FASS Building

University of Sydney - FASS Building

Construction Specialties

The PL-5700 is designed to work effectively with the interior louvre blades to provide unparalleled air intake and water protection performance. This model louvre was specified for the University of Sydney FAAS Building
Sponsored
Crescent Head Surf life saving club

Crescent Head Surf life saving club

ECOCLEAN

COLLABORATIONArchitect: Neeson Murcutt ArchitectsDeveloper: Surf Life Saving NSWBRIEFNeeson Murcutt Architects needed a solution that would protect the glazed ceramic tile roof on the $2.2 million rebuild of the Old Kempsey-Crescent Head Surf Life Saving Club. They wanted to avoid grime and salt accumulation on the roof system with minimal maintenance from the volunteers and to reduce maintenance costs.The architect designed the outside surfaces so they would be durable in the marine environment and easy to maintain. With difficult access to the roof, the builders decided on ECOCLEAN to help with maintenance and cleaning of glazed ceramic roofingMATERIAL & APPLICATIONECOCLEAN Porosity SealerECOCLEAN Self-Cleaning CoatingOUTCOMEUsing the power of daylight, rainwater and dew, ECOCLEAN created a self-cleaning roof that continually breaks down algae, mould and organic matter, which can cause unsightly stains. The Crescent Head Surf Club went on to win three awards including the NSW Sulman Medal for Public Architecture.
Sponsored
Royal Hobart Hospital

Royal Hobart Hospital

Construction Specialties

Acrovyn by Design, was the ideal product to promote a fun and healing environment in the children's unit of the Royal Hobart Hospital. Displaying images that portray an Antarctic theme throughout 47 bedheads of the hospital for the use of aesthetics and protecting the walls of the hospital.
Sponsored
Mother Teresa Catholic College, WA

Mother Teresa Catholic College, WA

Termimesh

Mother Teresa Catholic College, WALocation – Baldivis, Perth, Western Australia      Installation Duration - 3 monthsInstallation Year – 2019                             Project Value - $15-20 millionSpecifying Architects – Parry and Rosenthal Architects TECHNICAL DETAILInstallation Type                                             NumberService penetrations                                     150Cluster penetrations                                      11Control joints                                                   700 LMConcrete slab pours                                       Grid pattern - numerousPerimeter                                                           500 LM  BACKGROUNDMother Teresa Catholic College is a progressive co- educational facility in the fast-growing suburb of Baldivis, 60 kilometres south of Perth in the City of Rockingham.The school opened in 2013 and in 2018/19 a Stage 3 Capital Development Program called for the construction of junior-secondary class-rooms and associated facilities, playing fields, courts, grounds, and extended parking. REQUIREMENTThe College’s ongoing plans for facility enhancements represents a significant investment and is worth protecting with the most effective pre-construction termite management system.The College caters for students from pre-kindergarten to Year 12. Chemical termite controls were not an option because of toxicity issues, making a clean and environmentally safe physical termite barrier the correct solution.APPROACHA typical WA site, the college’s location is predominantly flat, with sandy soils and substrates. In general, this type of environment poses a high risk for termite attack common to this region of Western Australia. SOLUTIONThe main challenge with the installation came from the rammed earth exterior walls. Their natural composition can chip easily, so nailing or sealing the termite barrier onto the wall was not practical.Our solution was to install Termimesh cold joint /paver trays to the perimeter of the concrete slab edge. These protected the concealed entry point between the slab and wall. They also engaged into the external pavement instead of against the rammed earth wall itself.BENEFITSThe Termimesh System which comprises of our 725 grade stainless steel mesh, Termiparge bonding cement and high grade stainless steel clamps not only met their strict requirement of no chemicals it will also continue to provide them with reassurance and peace of mind the comes with our market leading Pledge Guarantee. The Pledge Guarantee provides the client with a 10 year guarantee that requires no annual inspections during that initial period. The client then has the option to extend this on an ongoing basis by having an approved annual inspection.

Showing 1-36 of 158

Feedback