NBS Source
I'm a manufacturer

"general"

319 results found

Sort by:

Showing 1-20 of 20

Sponsored
Aveo Retirement Resort, Bella Vista NSW

Aveo Retirement Resort, Bella Vista NSW

Alspec

High-rise urban retirement resort with generous balconies featuring Alspec Altitude Apartment Sliding Doors.
Sponsored
Double One 3, Teneriffe, Brisbane QLD

Double One 3, Teneriffe, Brisbane QLD

Alspec

Residents of this lifestyle-focused development enjoy uninterrupted city, river and district views thanks to generous balconies enclosed with Alspec’s EndurAl balustrade system.
Sponsored
Kuala Lumpur International Airport, Malaysia

Kuala Lumpur International Airport, Malaysia

Rondo Building Services Pty Ltd

Rondo has supplied our Key-Lock Suspended Concealed Ceiling System to the new KLIA2 terminal. The KLIA2 is built to be Malaysia's Next Generation Hub - an airport hub that will allow seamless connectivity between low-cost and full-service carriers.
Sponsored
Darling Harbour Live, NSW

Darling Harbour Live, NSW

Rondo Building Services Pty Ltd

Designed by leading architects Hassell and Populous, the project is predicted to generate $200 million annual economic benefit for the NSW economy. Partnering with four of its major contractor customers Rondo provided design solutions based on criteria supplied by the architects and project builder Lend Lease for all four buildings.
Sponsored
Westfield Centrepoint, NSW

Westfield Centrepoint, NSW

Rondo Building Services Pty Ltd

Westfield Shopping Centre in Sydney represents the next generation of retail experiences and is quickly becoming one of Westfield’s global flagships. In order to achieve the architectural specifications, Rondo designed a unique suspended ceiling system using boxed Rondo Steel Studs as ceiling joists to accommodate the loading of custom made timber panels.
Sponsored
Ronald McDonald House, SA

Ronald McDonald House, SA

Rondo Building Services Pty Ltd

The project has utilised a various range of Rondo products, including Stud and Track, DUO Concealed Grid System and PANTHER Access Panels to name a few. Rondo generously donated many of these products to this amazing charity, part FOC and part subsidised. With the official opening in May 2011, this house that will lend a hand to thousands of struggling families is sure to make a difference.
Sponsored
QT Hotel Perth, WA

QT Hotel Perth, WA

Rondo Building Services Pty Ltd

For instance, the guest room ensuite walls were mainly comprised of glazed aluminium panels made overseas. Unfortunately, this meant there were minimal tolerances in the set-out. Yet, because the hotel floors were generally the same layout, Rondo created a template system for setting out most of the guest rooms while also ensuring that ceiling heights were set exactly.
Sponsored
Dubai Metro Station, Dubai

Dubai Metro Station, Dubai

Rondo Building Services Pty Ltd

Rondo has supplied an external soffit ceiling frame for the Dubai Metro Station project. The Green Line of the Dubai Metro is the second Dubai Metro light rail line in Dubai. The route starts in Al Ghusais, and runs along Al Nahda Rd and Salahuddin Rd above ground. The Green line runs through Deira and Bur Dubai and generally runs parallel to Dubai Creek.
Sponsored
Mainpoint Apartments, Melbourne, VIC

Mainpoint Apartments, Melbourne, VIC

Caroma

GWA provided a complete solution for Central Equity’s landmark 43-level MainPoint Apartment complex in Melbourne. Ian Carkeek, General Manager - Product and Development at Central Equity said, “The GWA Bathrooms & Kitchens range suited our design concept while at the same time achieving key practical and environmentally sustainable requirements. This, in addition to our long standing, first-hand experience using their products meant it was an easy choice for us.”
Sponsored
Family Connections, VIC

Family Connections, VIC

Capral Aluminium

Steve Domoney Architecture took on the challenge of designing a home for clients with children. This project came with a clear vision of a spacious family home, contemporary in line and warm in tone. The dining room has Capral AGS windows opening at exterior ground level to a fernery, while high-level Capral AGS 419 Flushline Framing System beyond the kitchen provides views to distant trees in the south-east. The formal lounge opens to a generous decking and garden behind.
Sponsored
Breathe Architecture's 'Halo House' bursting with GoodWood Victorian Ash

Breathe Architecture's 'Halo House' bursting with GoodWood Victorian Ash

Australian Sustainable Hardwoods

This design stemmed from the idea of the ‘Halo Effect’ – ‘a natural phenomenon whereby icebergs act as physical refuge for aquatic organisms while simultaneously releasing nutrients to their surroundings and generating a ‘halo’ of energetic life’. The Halo House is the epitome of an Australian modern family home. Breathe Architecture explained “the building reads like a geological feature in a landscape, continually evolving with the passing of time, weather and seasons”. The design represents a ‘breath of fresh air’, using light and natural materials to create a warm and nurturing home.
Sponsored
Functional Coatings - Anzac Memorial

Functional Coatings - Anzac Memorial

ECOTONE

CollaborationArchitects: Johnson Pilton Walker (JPW) and the Government Architect’s Office.Builder: Built.Material & ApplicationFunctional Coatings were applied to precast concrete elements to protect the memorial from carbonation in addition to giving the surface self-cleaning and air-purification propertiesOutcomeA stunningly sustainable multi-award winning project that includes the prestigious Sulman Medal. Our team is so proud to have played a part in the preservation of one of Sydney’s most iconic monuments, a symbol of our history and our future.TestimonialThe Anzac Centenary Project not only realises the vision from our past, it will continue to remind future generations of the contributions made by our servicemen and women.The Right Hon. Clover Moore, Lord Mayor of Sydney
Sponsored
Hayward Field

Hayward Field

ASI JD MacDonald Pty Ltd

Hayward Field has always held a special place in the history and traditions of the University of Oregon, as well as for generations of athletes and fans in the state of Oregon and around the world. As the host site for the 2021 US Olympic Trials and the 2021 Track and Field World Championships, Hayward Field was primed for a 21st century “reimagining” on an epic scale.Understanding that the project’s aesthetic should extend to all areas of the venue, including the restrooms, the design team challenged ASI Group for a solution that aligned with the arena’s sophisticated design. They wanted the restrooms to offer athletes and fans the facilities necessary to maximize their experience, with an added focus on total privacy.ASI rose to the challenge, delivering 144 Alpaco™ Classic Overhead Braced Partitions, along with 36 urinal screens. A perfect blend of simplicity and function, ASI’s exclusive Ultimate Privacy™ offers zero sightline doors and pilasters that meet in a flush finish, with routed, overlapping closures to guarantee total privacy. ASI partitions are offered in a range of standard and custom colors, with crisp design lines, bold hardware options, and superior functionality that’s perfect for high-profile settings like Hayward Field. The self-closing feature of the Alpaco™ doors delivered a sleek, uniform appearance whether the facilities are in use or not.
Sponsored
The Hague, Netherlands

The Hague, Netherlands

Boon Edam Australia Pty Ltd

Mauritshuis is located in the heart of The Hague. It is famous around the world for its premium art collection. The intimate museum rooms of this 17th century monument display over two hundred excellent art works by Dutch and Flemish Masters. Boon Edam installed two special revolving doors in the museum's newly constructed section, one of which is a Tourniket that is 4.6 m high. The underground entrance foyer is actually located six meters below street level, but now with this renovation, as daylight penetrates from all sides, it feels very light and spacious. “Before the renovation, the museum’s entrance on the side of the building was rather cramped,” says architect Hans van Heeswijk at the press preview. In order to create a more generous reception area, he decided to move the main entrance under the forecourt of the listed, seventeenth-century Dutch Classicist house, which had to remain exactly the way it was. It was a feat in itself to connect two buildings underground and to lower the foundation of the new wing. The small surface area and the building's location right next to the Prime Minister's tower made this construction project quite complex. Boon Edam was honoured to supply two special automatic revolving doors that had to suit the new museum wings perfectly.
Sponsored
Shrine of Remembrance

Shrine of Remembrance

Interpon Powder Coatings

A significant Melbourne landmark, Victoria’s Shrine of Remembrance has undergone a major redevelopment by local firm ARM Architecture. Completed in late 2014, the redesign accommodates new requirements of the memorial that have evolved in recent years, while respecting the original design by Hudson and Wardrop, thus ensuring the memorial’s use by future generations.  Built between 1928 and 1934 to honour those who served in the First World War, the Shrine was inspired by the tomb of King Mausolus, one of the seven wonders of the ancient world. In the late 1990s, the Shrine of Remembrance Trustees embarked on a bold plan for the site. Access to the upper levels of the Shrine was problematic, especially for veteran visitors, and public visitation was increasing as younger generations came to understand the legacy of their forebears. Accordingly, the Shrine’s collections were expanding with donations of artefacts from families and a growing need for education facilities and an improved visitor experience became evident.  In 2001, ARM Architecture were commissioned to develop a master plan to develop the Shrine. Following the original 1920s design, ARM proposed four symmetrical zig-zag shaped courtyards, allowing access to the undercroft spaces under the existing structure which now house gallery areas, an auditorium, dedicated education rooms, an archive and offices. Stage 1 of the project saw the Visitor Centre and two of the courtyards completed on the north side of the structure in 2003. Stage 2 expanded the undercroft with the addition of the Education Centre and Galleries of Remembrance, and the final two courtyards. ARM Design Architect Jeremy Stewart explains “It was important that each of the courtyards had a distinct feel”. The open air Student Entry Courtyard offers a separate entrance to the Shrine for school groups, with a large sculptural poppy, the flower of wartime remembrance, suspended overhead. With the colour red notorious for fading on external structures, Interpon Powder Coatings recommended a system that would be colourfast. In a high traffic space that closes for only two days each year, with the additional solemnity of the memorial environment, choosing a product that would last the distance and require minimal maintenance was essential to this project. Interpon’s D2015 Gold Global Warranty offers the Shrine Trustees this assurance. Working with Locker Group, HDM Metal, an experienced fabricator and Interpon Approved Applicators AAF Vic and Powdercoating Services ACT as exclusive warrantors provided further reassurance of the product quality.  The giant overheard poppy features Interpon D2015 Ultriva™ R15 Crimson Matt YG215A and its support structure Interpon D2015 Ultriva™ Ebony YN201A. On the south west diagonal, the Terrace Courtyard features a lush green referencing South East Asian inspired garden. Amidst the greenery, laser cut aluminium panels coated in Interpon D2015 Ultriva™ R14 Waratah Matt YG222A list the names of Victorian towns, providing a reference point for visitors. The zig-zag shape of the terrace courtyards infer irregular exposure to the sun, further emphasising the need for a product of premium quality. “Interpon are interested in and open to ideas”, says Stewart, making this a win-win collaboration for the architects of this redevelopment of Victoria’s premier place of remembrance.  
Sponsored
Ferrero Rocher

Ferrero Rocher

Boon Edam Australia Pty Ltd

Ferrero’s new global HQ gathers in one building with nearly 1,300 people, previously spread over five different offices. The building, with a total floor space of almost 30,000 m², opened in December 2019. The building is designed to evoke the atmosphere of an Italian square: a vast atrium is surrounded by two multi-storey office wings. Boon Edam was appointed to craft and install the golden revolving door, on behalf of facade builder Groven + Portal, who in turn worked for general contractor Felix Giorgetti. The colour of the revolving door makes a visual reference to the world-famous golden chocolate - Ferrero Rocher. The Casa Ferrero administrative building consists of two blocks built on a common basement. It was the combination of these plots, and the architectural skills, that resulted in what you see today: a building that is both impressive and elegant as well as being a pleasant and functional workplace for the employees of the food group. Ferrero’s colours are subtly incorporated into the classic facades, with bronze tones and a gilded effect over the windows as well as the entrance glass panels. This effect was achieved by applying a gold-coloured textile fabric to the laminated glass during the project’s construction. Behind the glass facade of the entrance, the most jaw-dropping area of Ferrero’s headquarters unfolds - a central atrium that connects the two blocks and is entirely covered by a glass roof. The spacious atrium is designed to function as a reception and meeting space. Horizontal circulation between the two blocks is facilitated by connecting walkways with a range of 20 meters. The vertical circulation occurs through panoramic glass elevators. The central atrium’s glass-roofed space is open to life within the company and encourages interaction between employees. This 11-storey building, including six upper levels (ground floor + 5 floors) and five lower levels, adapts perfectly to its urban surroundings. The office areas are spread over nine floors, taking advantage of maximum light for the interior space. Levels -3 to -5 include technical areas and parking spaces. Ferrero’s wish was for a functional and pleasant building for everyone who works there. We think they have achieved this in spades!
Sponsored
Universal Store Driving Sustainability - Industrial market Segment

Universal Store Driving Sustainability - Industrial market Segment

HOLCIM (AUSTRALIA) PTY LTD

How does it work?ECOPact uses alternative materials to reduce the environmental footprint of the concrete mix.ECOPact alone reduces embodied carbon emissions by 30-60% without the use of offsetsSimilar technical qualities of conventional concreteECOPact zero goes one step further buy offsetting the residual emissions of ECOPact concrete to achieve 100 emissions reduction.The issueThe built environment is responsible for 39% of global energy-related emissions. Over a quarter of these emissions arise from running existing buildings, whilst 11% is attributable to the embodied emissions from the construction of new buildings. Did you know – concrete is the most widely used building material in the world? The production of concrete is highly energy intensive and generates significant emissions.Business GrowthAs we continue to grow and expand our store footprint nationally, in 2022 we are building a new home for Universal Store. Our objective is to accelerate our journey to a sustainable future, so we have made it a priority to integrate environmentally sustainable features in the design of this exciting new project. This also entails considering the climate impacts of this project. EcoPact - Zero ConcreteWe will need tons of concrete and other materials for the structure of our new Universal Store home. But the good news is that some pioneers are investing in research and development to deliver carbon neutral concrete.We are working closely with our construction partners - developer TradeCoast Central, and builder McNab to deliver a sustainable building. The Universal Store new purpose-built facility will make use of carbon neutral concrete supplied locally by Holcim. Their EcoPact concrete can be made carbon neutral by compensating for residual carbon emissions. In fact this product is so much better for the planet, it has just won the Best of the Best 2021 Sustainability Awards from Architecture and Design.We chose this product to achieve the following benefits:·Conserve natural resources - the product uses alternative materials (fly ash, blast furnace slag or silica fume) instead of virgin raw materials (mainly limestone and silica). ·Reduce the carbon footprint of the project - this product achieves a reduction of 30-100% of embodied emissions related to concrete usage in comparison to standard concrete. ·Use our influence and leadership to support the transition to a low carbon economy·Demonstrate that a sustainable future is within reach.
Sponsored
Mother Teresa Catholic College, WA

Mother Teresa Catholic College, WA

Termimesh

Mother Teresa Catholic College, WALocation – Baldivis, Perth, Western Australia      Installation Duration - 3 monthsInstallation Year – 2019                             Project Value - $15-20 millionSpecifying Architects – Parry and Rosenthal Architects TECHNICAL DETAILInstallation Type                                             NumberService penetrations                                     150Cluster penetrations                                      11Control joints                                                   700 LMConcrete slab pours                                       Grid pattern - numerousPerimeter                                                           500 LM  BACKGROUNDMother Teresa Catholic College is a progressive co- educational facility in the fast-growing suburb of Baldivis, 60 kilometres south of Perth in the City of Rockingham.The school opened in 2013 and in 2018/19 a Stage 3 Capital Development Program called for the construction of junior-secondary class-rooms and associated facilities, playing fields, courts, grounds, and extended parking. REQUIREMENTThe College’s ongoing plans for facility enhancements represents a significant investment and is worth protecting with the most effective pre-construction termite management system.The College caters for students from pre-kindergarten to Year 12. Chemical termite controls were not an option because of toxicity issues, making a clean and environmentally safe physical termite barrier the correct solution.APPROACHA typical WA site, the college’s location is predominantly flat, with sandy soils and substrates. In general, this type of environment poses a high risk for termite attack common to this region of Western Australia. SOLUTIONThe main challenge with the installation came from the rammed earth exterior walls. Their natural composition can chip easily, so nailing or sealing the termite barrier onto the wall was not practical.Our solution was to install Termimesh cold joint /paver trays to the perimeter of the concrete slab edge. These protected the concealed entry point between the slab and wall. They also engaged into the external pavement instead of against the rammed earth wall itself.BENEFITSThe Termimesh System which comprises of our 725 grade stainless steel mesh, Termiparge bonding cement and high grade stainless steel clamps not only met their strict requirement of no chemicals it will also continue to provide them with reassurance and peace of mind the comes with our market leading Pledge Guarantee. The Pledge Guarantee provides the client with a 10 year guarantee that requires no annual inspections during that initial period. The client then has the option to extend this on an ongoing basis by having an approved annual inspection.
Sponsored
Polaris Data Centre

Polaris Data Centre

Construction Specialties

To protect the priceless infrastructure and mission-critical IT information in Australia’s first custom built, high-tech data centre, Polaris, Project Manager Thiess turned to the leading manufacturer of specialist building products, Construction Specialties.Integral to the $121 million construction was the regulation of airflow to safeguard the computer hardware; Construction Specialties’ customised performance louvres were the only product in Australia able to meet this construction challenge.Boasting 14,000m2 of floor space on 5 storeys with 7000m2 of raised floor over three data centre levels, the project, based in Springfield, Queensland, is the largest of its kind in Australia and will be Queensland’s only Tier 3+ data collection point.So important were the Construction Specialties performance louvres to the development, much of the building design was driven by the positioning, material specifications and design of the louvres.Lawrence Issa, Project Manager for Construction Specialties, and project partners Darryl Wright and Steve Emery of Project Sales worked closely with the Polaris construction team from project inception to completion to devise the most effective weatherproofing and airflow option for the building which also matched the intended aesthetic.“In-depth collaboration with the Polaris team led to the selection of our Architectural Line Louvres, of which two types were used – our RS7305a and LSM louvre models,” Lawrence said. “Unlike other louvres on the market, this range prevents up to 99% water penetration and maximises airflow, while also complementing the building facade as the horizontal louvre frames selected are hidden from view.“Our performance louvres cover 345m2 of the exterior building and are specifically customised in terms of size, shape and colour for the data centre,” Lawrence said.Miguel Thievent, Senior Project Engineer at Thiess, remarks that the CS Louvres perform to the highest standard, which was essential in meeting the building specifications.“It was vital we didn’t compromise on weather proofing and airflow,” Miguel said. “For example, we have six generators integral to maintaining the whole IT system in case of power failure which would not run if the airflow was affected or they were damaged by rain.“The Construction Specialties performance louvres were the only ones on the market that could guarantee damage would not occur as a result of bad weather conditions,” Miguel said.Construction Specialties’ performance louvres are at the leading edge of louvre design and are tested under real world conditions to meet the maximum standards demanded.Construction Specialties offers a broad selection of louvres under 3 main categories:Storm Resistant/Performance Louvres – The main objective of Performance Louvres is to allow the passage of air, whilst providing the area beyond the room with protection from rain penetration.Standard Louvres – A standard louvre will provide the maxiumum airflow required, but with minimal rain defence.Screening Louvres – Screening louvres, are low cost solutions that hide plant or other equipment from view.CS Louvre systems are available in a comprehensive range of finishes and colours, ensuring there is a Construction Specialties Louvre system to suit most aesthetic and performance needs.Louvre panels are factory assembled in a controlled and quality assured environment and provided to site in a fully finished modular form; thus, allowing for trouble-free and fast installation.A comprehensive range of accessories including insect/bird mesh and blanking panels in various materials and finishes is available to complete the application.
Sponsored
Burj Khalifa

Burj Khalifa

Boon Edam Australia Pty Ltd

The Burj Khalifa – formerly the Burj Dubai – is a legendary building that can only be described in superlatives. At 828 metres high, it is the tallest building in the world. The Burj Khalifa has 160 floors, more than any building in the world. The building also has the highest floor, the highest façade made of aluminium and glass, the highest nightclub and the highest restaurant, the highest service lift and the lift with the longest travel distance. Finally, the building has the highest positioned revolving doors ever installed in a façade worldwide. In less than 30 years, Dubai has become the leading city in the Middle East and is known for its architectural and technical excellence. The Burj Khalifa has become the symbol of this progress. The Burj Khalifa also takes the title of the highest structure in the world back to the Middle East; the Great Pyramid of Giza used to hold the title 4 millennia ago. International Collaboration The tower was designed by architectural firm Skidmore, Owings & Merril, known for their designs for the Willis Tower (formerly the Sears Tower) and the new One World Trade Center in New York. The three-pronged design is based on the spider lily desert flower and consists of three elements around a central core, with the elements spiralling upwards. It can rightly be called an international project: the construction team consisted of Samsung Engineering & Construction employees from South Korea in collaboration with Besix from Belgium and Arabtec from the United Arab Emirates. The UK consultancy Hyder Consulting was responsible for overseeing construction of the building. In total, companies from more than 30 different countries contributed to the construction of the Burj Khalifa. A Windy Challenge The wind is quite a challenge when building a skyscraper of this size. Without additional measures, the top of the building would move so much from side to side due to the wind that people would become seasick. Dubai is also regularly tested by the shamals: sandstorms that can last for days. As the outer façade of the Burj Khalifa contains an enormous amount of glass, these weather conditions presented a considerable challenge. The three-part design proved to be the solution because the spiral floors break the wind currents around the building, resulting in a stable structure. The World's Highest Revolving Doors Skidmore, Owings & Merril's design includes an observation platform on the 124th floor of the building. Two glass revolving doors provide access to this room. At 442 metres above the ground, these are the highest positioned revolving doors ever installed in the façade of a building. The revolving doors must also be able to withstand an extremely high wind load of at least 3000 Pascal, which corresponds to an F3 class tornado. The Burj Khalifa required two automatic revolving doors with a diameter of 3,000 mm and a total height of 2,700 mm; the cover could only be 300 mm high with the motor installed. Generally speaking, a revolving door with these specifications would only be able to withstand wind loads of up to 689 Pascal. It was clear, then, that not every revolving door manufacturer could supply an entrance that met these requirements. Challenge Accepted Koninklijke Boon Edam was one of only two companies invited to devise a system for this challenge. There were two main problems that had to be solved: the round sides of the revolving door had to be strong enough to resist the wind, and the door set had to be properly fixed so the door wings could not be blown off during a storm. Boon Edam worked closely with Mace, the Hyder Consulting Group, Samsung Engineering and Construction and Turner Construction, the subcontractor, to develop a system that met all these requirements. During the first phase of the process, the second company invited to tender had to give up because their design did not meet the challenging conditions on the 124th floor. Boon Edam persisted in its efforts, and after conducting various wind load and glass tests, it became possible to adapt the construction of the Tourniket to the requirements of the Burj Dubai. A Tornado-Proof Revolving Door at the Burj Khalifa Our proposal for the Burj Khalifa consisted of a Tourniket with specially reinforced door frames twice the width and thickness of a normal revolving door. These were securely anchored with special bolts under the floor to guarantee the structure's rigidity. Although most revolving doors are installed on the top of the subfloor, this door was installed under the top finish layer of the concrete floor. To guarantee the stability of the door set, an extra-thick steel frame was added to the structure. This allows the door wings to easily withstand the wind pressure. Expansion on the 148th Floor in 2014 Boon Edam installed the same specially designed Tourniket revolving door on the 148th floor as on the 124th floor. However, the new project brought an extra challenge: transporting all of the materials from the basement of the building to the 148th floor. First, the materials had to be transported in one lift to the 111th floor. They were then transferred to a second lift, from where everything had to be moved manually from the 149th floor to the 148th floor, to the door's location. Special Projects Based on Standard Solutions The revolving doors we created for the Burj Khalifa were an extreme challenge. The experience and expertise of our technicians combined with the tried and tested technology of the Tourniket enabled us to develop a successful solution. Both revolving doors are now used daily and give visitors a spectacular view of Dubai. The glass design beautifully complements the modern façade of the observation platform and puts Dubai's beautiful skyline in the spotlight.

Showing 1-20 of 20

Feedback