NBS Source
I'm a manufacturer

"ceiling"

335 results found

Sort by:

Showing 1-36 of 112

Sponsored
Trust Towers, Abu Dhabi

Trust Towers, Abu Dhabi

SAS International Australia

This unique offset ellipse design tower had to allow the ceiling to flow around the building. A bespoke SAS330 metal ceiling system was specified incorporating trapezoidal panels. Trust Tower forms one of three new tower blocks; part of the Central Market development. The first tower to be completed is tower three a 59-storey commercial office development. The tower is a unique offset ellipse design, to allow the ceiling to flow around the building a bespoke. SAS330 metal ceiling system was specified incorporating trapezoidal panels. Enabling a monolithic finish to the ceiling plane, black service troughs house recessed lighting and other MEP services; this enables maximum acoustic performance to be achieved from the ceiling tiles. Over 900 different sized ceiling tiles were manufactured and installed throughout the project. Metal ceilings provide durability, accessibility to the ceiling void and low maintenance. The life-span of SAS International’s metal ceilings is in excess of 25 years with only very basic maintenance. The entrance mezzanine area features a four-storey high ceiling finished in midnight blue, providing a dramatic entrance to this iconic building.
Sponsored
Gold Coast University Light Rail Station, QLD

Gold Coast University Light Rail Station, QLD

Rondo Building Services Pty Ltd

Contractors Precision Interior Walls and Ceilings (PIWC) primary responsibility was the installation of the specialist linings on curved feature ceilings. PIWC Construction Manager, Ashley O’Connor mentions working closely with Rondo, and using CAD drawings to create a ceiling system before the panels were even made. “We designed and ensured the ceiling systems project’s specific design criteria were met”, said Ashley.
Sponsored
Christchurch Justice and Emergency Services Precinct, NZ

Christchurch Justice and Emergency Services Precinct, NZ

Rondo Building Services Pty Ltd

Rondo was called upon to supply our market leading Seismic Wall and Ceiling System including Steel Stud & Track Drywall Framing, KEY-LOCK Concealed Suspended Ceilings, and DUO Exposed Grid Ceiling Systems.
Sponsored
Manukau Bus Station, NZ

Manukau Bus Station, NZ

Rondo Building Services Pty Ltd

Timber features were used throughout the project, with Decortech acoustic panels used to clad both internal and external ceilings. Rondo, in collaboration with BVT Engineering was engaged to provide design assistance for all external soffits/ceilings, internal walls and ceiling framing.
Sponsored
Commonwealth Law Courts, NT

Commonwealth Law Courts, NT

Rondo Building Services Pty Ltd

Rondo assisted Brett Watson Contracting in providing the featured elliptic curved detail that made the eye catching internal ceiling layout possible. Rondo supplied our KEY-LOCK Concealed Ceiling System to create the coffered ceiling treatments in the main atrium.
Sponsored
Skycity Casino & Hotel, SA

Skycity Casino & Hotel, SA

Rondo Building Services Pty Ltd

The KEYLOCK Concealed Suspended Ceiling System, Steel Stud and Track Wall Framing System, and XPRESS Drywall Grid Ceiling System have been integrated throughout the project. Rondo’s long-term relationship with Ceiling & Wall Contractors enables the project to run smoothly and the onsite coordination is exemplary.
Sponsored
100 Creek Street, QLD

100 Creek Street, QLD

Rondo Building Services Pty Ltd

The Rondo team were engaged in the project to design the ceiling framework for the lobby of the twenty-five-storey building. The Rondo KEY-LOCK suspended ceiling system with radius top cross rail was specified to create the proposed arch ceiling, along with Steel Stud and Track for the walls in other areas of the project.
Sponsored
Townsville Hospital, QLD

Townsville Hospital, QLD

Rondo Building Services Pty Ltd

Rondo has so far provided over 10,000lm of various wall and ceiling systems, including Rondo Steel Stud Drywall Framing System, KEY-LOCK Suspended Ceiling System and DUO Exposed Grid Ceiling System. More complicated designs arose when it was discovered that the high cyclonic winds would affect the facade of the building.
Sponsored
iFly Indoor Skydiving Centre, WA

iFly Indoor Skydiving Centre, WA

Rondo Building Services Pty Ltd

Working directly with sub-contractors Donnybrook Interiors and Architectural Ceiling Systems, Rondo delivered the walls and ceilings for this unique $15million build.
Sponsored
Doha International Airport, Qatar

Doha International Airport, Qatar

Rondo Building Services Pty Ltd

Rondo have supplied the suspended ceiling support frame for a metal panel ceiling which will be used in the construction of the Doha International Airport project.
Sponsored
Matisse Beach Club, WA

Matisse Beach Club, WA

Rondo Building Services Pty Ltd

Rondo worked closely with contractor Future Carpentry and Ceilings providing Rondo 92mm Stud & Track Systems, KEY-LOCK Ceiling Systems and heavy gauge Rondo products externally, throughout the project. A special feature in the design involved an intricate ‘wave’ ceiling feature requiring both convex and concave curved Rondo TCR sections to achieve the desired effect.
Sponsored
Old Treasury Building, WA

Old Treasury Building, WA

Rondo Building Services Pty Ltd

The entire building also featured ceilings acoustically isolated from the old structure where heavy duty isolators were required to be incorporated into the Rondo KEY-LOCK Concealed Suspension System. Similarly Rondo had to design a supplementary suspension system beneath these ceilings to accept a secondary system to support some services and particularly architectural feature ceiling beneath.
Sponsored
Matisse Beach Club, WA

Matisse Beach Club, WA

Rondo Building Services Pty Ltd

Rondo worked closely with contractor Future Carpentry and Ceilings providing 92mm Stud & Track Systems, Key-Lock Ceiling Systems and heavy gauge Rondo products externally, throughout the project. A special feature in the design involved an intricate ‘wave’ ceiling feature requiring both convex and concave curved Rondo TCR sections to achieve the desired effect.
Sponsored
Park Hyatt, NZ

Park Hyatt, NZ

Rondo Building Services Pty Ltd

Due to tight plenum space and extremely congested plenum areas, Rondo’s new Xpress Drywall Grid System was the ideal ceiling system to use. This maximised the ceiling heights in all guest rooms while offering compliant plenum vertical clearances. Contractors implemented Rondo’s intricate feature ceilings and bulkheads throughout the entire building, such areas included the lobby, restaurants and conference areas.
Sponsored
Kurrawa Surf Life Club, QLD

Kurrawa Surf Life Club, QLD

Rondo Building Services Pty Ltd

Rondo and Allcoast worked together to achieve the curved corners in the feature ceiling. Although a great success, it was initially a tricky scenario to tackle due to the difficult shape that a tiered, KEY-LOCK Ceiling offers, including tight bends and corners. To form the curve in the ceiling, the contractor had to utilise plywood and cut to the same shape of the corner. Not only did this provide the desired effect, it added additional strength to the Rondo framework.
Sponsored
South Australian Health & Medical Research Institute (SAHMRI), SA

South Australian Health & Medical Research Institute (SAHMRI), SA

Rondo Building Services Pty Ltd

With a demand for leading scientific research facilities growing year upon year, the South Australian Government commissioned the development of the South Australian Health & Medical Research Institute (SAHMRI). Since the project commenced in 2010, Rondo has supplied our KEY-LOCK Suspended Ceiling System, Steel Stud and Track, DUO Exposed Grid Ceiling System, PANTHER Access Panels, Shaftwall and Walk-About Trafficable Ceiling System.
Sponsored
Eqwater, Paris

Eqwater, Paris

SAS International Australia

Acoustic SAS International metal ceiling systems were installed in the eight-storey Eqwater office building in Paris. SAS International’s SAS330 was installed throughout the office areas in the building. SAS330 is a lay-in metal ceiling tile system that provides functionality and outstanding acoustic performance for a range of cost-effective design options. The practical nature of its structure allows ease of construction and maintenance. The corridors of the building were fitted with SAS International’s SAS205. In some areas it is not possible to use a standard hanging bracket due to the number of services in the ceiling void, SAS205 is supported at the perimeters, up to a maximum width of 3000mm, making it a perfect solution for corridors. Metal offers an inert and inherently hard-wearing surface, making metal ceiling systems both hygienic and a low-maintenance option over the course of their lifespan. Only a simple cleaning routine is required. The lifespan of SAS International’s metal ceilings is in excess of 25 years with only very basic maintenance.
Sponsored
Midland Gate Shopping Centre, WA

Midland Gate Shopping Centre, WA

Rondo Building Services Pty Ltd

Ceiling and Walls Contractors have been a loyal customer to Rondo for almost 20 years. Ceiling and Walls Contractors are highly experienced with Rondo products. Our Rondo Technical Representative was readily available to visit site and provide technical assistance.
Sponsored
Adelaide Convention Centre, SA

Adelaide Convention Centre, SA

Rondo Building Services Pty Ltd

The project has called on our Technical Services Team for wall and ceiling designs, with significant quantities of Rondo systems used in the project including Rondo Stud and Track, KEY-LOCK Concealed Suspended Ceiling Systems and PANTHER Access Panels.
Sponsored
The Podiums, QLD

The Podiums, QLD

Rondo Building Services Pty Ltd

For instance, Superior faced the challenge of creating curved detailed bulkheads and feature ceilings. However, with Rondo’s help using a hybrid of the Rondo KEY-LOCK Concealed Ceiling System and Stud & Track Wall Framing System, they managed to create a great outcome.
Sponsored
Dublin Airport

Dublin Airport

SAS International Australia

SAS International designed and manufactured a range of solutions for the new 75,000 square metres Terminal 2 at Dublin Airport, Ireland. According to Dublin Airport the new second terminal will be capable of comfortably handling up to 15 million passengers per year. Specification demanded that durability, ease of maintenance and acoustics were considered. SAS International worked with architects Pascall + Watson to design the ceiling solution answering the architect’s brief to factor in ongoing maintenance conducted by Facilities Management teams in the future. The design of these large sized ceiling panels required careful consideration at design stage to ensure they would be manageable when working at a height. Designed and developed specifically for Dublin Airport was 35,000 square metres of ceiling systems, installed in the main departure area, walkways and baggage handling areas. This solution looks like any other suspended metal ceiling system as it provides an aesthetically pleasing flush finish. But where this product differs is its ingenious way of allowing access to the ceiling void and services for ongoing essential maintenance. This is of particular benefit in high traffic areas such as Dublin airport as it enables a corridor to remain in use rather than having to close off the entire route. SAS International manufactured the 20,000m2 of large aluminium frames for the fabric ceilings which creates a striking central feature. Working closely with SAS International were local installers Platt and Reilly who applied the stretched fabric to the frames on-site and hoisted them into position. Creating a comfortable environment for traveller and worker was helped with the use of acoustic floating rafts and perforated metal ceiling solutions (with integrated acoustic pads) to provide the necessary acoustic control for this project. Lighting was suspended neatly between the rafts to also provide a modern finish to the corridors. In addition Perimeter heating and air handling grilles also enhance the experience.
Sponsored
Ropemaker Place, London

Ropemaker Place, London

SAS International Australia

SAS International bespoke metalwork comprising of a striking waveform shaped ceiling was designed by architects Arup Associates to feature in the construction of Ropemaker Place, London EC2 for British Land. Simon Anson, architect at Arup Associates comments; “The purpose of the ceiling was to provide the 10.5m tall entrance foyer with an acoustic performance, and create a lighting source providing both uplight and downlight. The illuminated ceiling provides the entrance foyer with visual impact from views of City Point Plaza, Ropemaker Street and The City.” Simon Anson continues, “The appearance of the ceiling is that of a series of illuminated vaulted waves flowing into the interior, the volume of the space perceptually expanded by the uplit waveform surfaces. The vaulted ceiling with its flowing contours provides a visually stunning focal point as well as a practical solution to the acoustic requirements of the interior of the building.” Specialist bespoke wave ceilings were installed in the atrium, main reception area, lift lobbies and main external canopy. The waveform panel, although elegant in appearance, had to have the required strength to support the light fitting. The extra weight posed a significant design challenge of how to integrate and support the light fitting into the waveform panel. The complex design required all fixings to be concealed, as a large proportion of the face and rear of the waveform tiles are visible. In the design development and installation of the system, Arup Associates worked closely with SAS International and the specified lighting manufacturer, Zumtobel, to ensure the panels integrated seamlessly with the luminaires to produce the optimum installation.
Sponsored
Skype, Luxemborg

Skype, Luxemborg

SAS International Australia

SAS International's bespoke waveform acoustic baffle ceiling solution was used as a feature in the new Skype Headquarters. An SAS International bespoke waveform acoustic baffle ceiling solution incorporating luminaires by Zumtobel, was specified by Walker and Martin Architects (WAM) for the new Skype Headquarters. Situated in Luxembourg, the new building forms part of the regeneration works to an existing brewery located in Clausen, the old quarter of Luxembourg City. The challenge set by the client was to provide an interior that would inspire innovation in the daily workplace of Skype employees whilst retaining an element of corporate sophistication. The solution helped create a dynamic and flexible office space. In the design, development and installation of the system, WAM worked closely with SAS International, to ensure the baffles integrated seamlessly with the luminaires to suit the ceiling and building shape. WAM designed the acoustic baffle ceiling solution with technical help from SAS International, then developed the layout to achieve the ‘wave’ and ‘fluid’ affect. Stuart Walker adds, “The ceiling design gives an uplifting ambience to the space, people ‘look up’ when they enter and immediately know they are in a space that challenges office convention with innovative thinking.” Another consideration that WAM took when selecting materials for the fit out process was the impact on the environment. SAS International metal ceilings have a lifespan in excess of 25 years with only very basic maintenance. These products withhold a residual value and can be recycled at end of life into new virgin steel or aluminium without any loss of properties; this ensures products do not end up in costly and unsustainable landfill sites.
Sponsored
Oracle Apartments, WA

Oracle Apartments, WA

Rondo Building Services Pty Ltd

Rondo worked closely with C&L Ceilings who were charged with the wall and ceiling contract. In order to be sure that the building’s external facade would remain structurally secure and adhere to the architectural detail, C&L installed Fibrous Cement Sheets, supported by heavy gauge Rondo components.
Sponsored
Elm & Stone, VIC

Elm & Stone, VIC

Rondo Building Services Pty Ltd

Rondo were approached by Expoconti to supply the necessary wall and ceiling component of the build. The tower features multiple “loft” style apartments, which allows it to nestle one and two-bedroom apartments in an overlapping formation, giving both high-ceiling living areas and lofty mezzanine interior spaces.
Sponsored
Baldivis High School, WA

Baldivis High School, WA

Rondo Building Services Pty Ltd

Rondo provided technical design specifications when it came to the development and execution of an SAW Tooth ceiling which is featured in the main areas of the school building. BSHS will feature Rondo’s popular KEY-LOCK Suspended Ceiling System, Steel Stud and Track and EXANGLE products throughout the internal building frame.
Sponsored
Westfield Centrepoint, NSW

Westfield Centrepoint, NSW

Rondo Building Services Pty Ltd

Westfield Shopping Centre in Sydney represents the next generation of retail experiences and is quickly becoming one of Westfield’s global flagships. In order to achieve the architectural specifications, Rondo designed a unique suspended ceiling system using boxed Rondo Steel Studs as ceiling joists to accommodate the loading of custom made timber panels.
Sponsored
Royal Hobart Hospital, TAS

Royal Hobart Hospital, TAS

Rondo Building Services Pty Ltd

As the project was located in Hobart, it required the project team including Rondo to work together to be organised and keep a clear path of communication. This resulted in the full specification being completed early in the process, the specification included Rondo Wall Stud, KEY LOCK Ceiling Systems, DUO Ceiling Systems, External Soffit Systems and our extensive knowledge on seismic design.
Sponsored
Karratha Cultural Arts Centre, WA

Karratha Cultural Arts Centre, WA

Rondo Building Services Pty Ltd

The Project team consisted of builder, Doric, who awarded the ceiling and wall package to Ceiling & Wall Contracting (CWC) and KB Carpentry. Rondo Partner Network Distributer, Superb Group, provided supply of various Rondo products. Rondo was engaged by Peter Hunt Architects early in the documentation stages of the project, allowing an ease of understanding between all parties.
Sponsored
Parramatta Square, NSW

Parramatta Square, NSW

Rondo Building Services Pty Ltd

Rondo provided a range of market leading wall and ceiling systems for both buildings 3 and 4. Our KEYLOCK Concealed Suspended Ceiling System and Steel Stud and Track Wall Framing System were used for the internal fit out, completed by AUSTRAL Interiors. SMTM Projects used our 1.15 BMT Stud and Track with top hats.
Sponsored
Parramatta Sky High, NSW

Parramatta Sky High, NSW

Rondo Building Services Pty Ltd

Rondo together with the builder, architect and primary contractor Cubic assisted in creating the contemporary high-rise educational facility. Rondo were engaged to provide external and internal wall and ceiling designs. Rondo’s technical team successfully worked with the teams onsite to overcome a range of complex wall types and design issues. The project required both Seismic design for the ceilings and special wind designs for the external framing.
Sponsored
Health & Innovation Building, SA

Health & Innovation Building, SA

Rondo Building Services Pty Ltd

he developments $247.3m price tag makes it marginally more expensive than the $246m Adelaide University building next door. HIB will house the Centre for Cancer Biology and UniSA’s pharmacy school, with 450 researchers between them. Rondo’s involvement included providing ceiling and wall systems using our Shaftwall One-Way Erected System, KEY-LOCK Concealed Ceiling System and PANTHER Access Panels to create the desired effect.
Sponsored
Westfield Chermside, QLD

Westfield Chermside, QLD

Rondo Building Services Pty Ltd

The curved suspended ceilings, that features wavy ‘skylights’ meant the Top Cross Rail component had to be made to a radius that met the architectural specification. This, in turn required the expertise of the Rondo Technical Services Team to ensure the wave, ‘skylight’ feature (using KEY-LOCK Concealed Suspended Ceiling components) would actually work. Not only that, the Rondo Team also had to adhere to strict deadlines to ensure the material could be supplied to the project on time.
Sponsored
No.1 Collins Wharf, VIC

No.1 Collins Wharf, VIC

Rondo Building Services Pty Ltd

No 1. Collins Wharf is the latest part of the $1.2 billion development of the Victoria Harbour precinct. The 29-level apartment complex, built by Lend Lease and designed by Architectural firm, Bates Smart was completed in September this year and boasts 321 water-lined apartments and townhouses. Expoconti were awarded the wall and ceiling contract for the $106M development and soon after contacted Rondo to supply systems for the external walls, external cladding and internal suspended ceiling system.
Sponsored
Victoria Gardens Shopping Centre, VIC

Victoria Gardens Shopping Centre, VIC

Sculptform

The refurbishment of the Victoria Gardens shopping centre designed by Colab Design Studio uses Sculpform's Aluminium Click-on Batten system to create a stunning curved Oculus, along with feature walls and ceilings throughout the centre. Sculptform’s Click-on batten system provided a unique solution that could be customised to address the incredibly complex geometry of the existing architecture. Being able to use the same system for the mall cladding, mall ceiling installations and the oculus cladding ensured absolute consistency across the entire centre.
Sponsored
Minter Ellison, Sydney

Minter Ellison, Sydney

SAS International Australia

Minter Ellison's award-winning office specified SAS International ceilings as part of their overall workplace well-being strategy. Designed by BVN, the feature ceilings enhance the open floor design while minimising the use of materials. BVN challenged internal preconceptions of how major law firms present themselves to staff and clients alike. Deliberately shying away from a stiff, corporate feel, they specified SAS750 Tubeline in black. Their aim was to evoke a sleek and forward-thinking dynamism while maintaining a highly professional atmosphere. Elsewhere in the office areas SAS310 metal pan ceilings were specified with an unusually large perforation. This design feature creates a visually engaging ceiling which offers subtle system integration for sprinklers, down-lighters and other small services. Due to a tight project programme, micro-perforated SAS150 was specified knowing the tiles were readily available in the Sydney warehouse. The system satisfied acoustic absorption requirements too, achieving 0.95 NRC. Minter Ellison invested in not just a Grade A office redevelopment, but also their staff, improving motivation and retention. The reinvigorated space also communicates a clear sense of approach to visiting clients, underlining core brand values. Occupying the top 8 floors of the Governor Macquarie Tower, the project won the 'John Verge Award for Interior Architecture (NSW Architecture Awards) in 2016.

Showing 1-36 of 112

Feedback