NBS Source
I'm a manufacturer

One Microsoft Place, Ireland

OVERVIEW

International technology firm Microsoft have recently moved into their brand-new office located in Leopardstown. SAS International designed and manufactured a range of metal ceilings and bespoke metalwork installed in the multi award-winning innovation hub. This modern office signifies the celebration of an extensive 30-year history Microsoft share with Ireland. SAS500 linear baffles were supplied in either RAL 9016 (Black) or in a pre-coat timber effect to enhance the natural, organic character of this project. Installed in the main office areas, galvanised SAS130 T-Grid in RAL 9016 was chosen for its industrial demeanour and sharp appearance. SAS330 C-Profiles have also been supplied in a pre-coat timber effect, achieving the popular timber natural impression while still providing the longevity and benefits of metal. Installed in a unique triangular grid pattern, this ceiling adheres to the contemporary aesthetic of an exposed ceiling. The new building has been designed with the 2,000 Microsoft employees needs in mind creating large open spaces with the aim to promote engagement amongst colleagues. SAS International achieved the artistic vision of RKD architects through the collaboration with BAM and Platt & Reilly.

No featured products in this case study

Contact SAS International Australia by clicking the button below to find out which products were used in this case study.

More case studies from SAS International Australia

View all case studies (19)
University of Technology, Sydney

University of Technology, Sydney

Miesian Plaza, Dublin

Miesian Plaza, Dublin

University of Birmingham Library

University of Birmingham Library

Dublin Airport

Dublin Airport