NBS Source
I'm a manufacturer

"transport communications fittings"

144 results found

Sort by:

Showing 1-6 of 6

Sponsored
Fire Resistive Curtain Wall at NYC Midtown Community Court

Fire Resistive Curtain Wall at NYC Midtown Community Court

SAFTI FIRST

The 1890s-era Midtown Community Court in New York City—a New York Historic Landmark—is currently undergoing a five year, $18 million renovation that includes a 9,650-square-foot addition for a new elevator, lobby and stairwell featuring fire resistive glass and curtain wall. The system consists of SAFTI FIRST®’s SuperLite® II-XL 120 IGU in GPX® Curtain Wall System.
Sponsored
Fire Resistive Glass Opens New Doors for Adaptive Reuse Project

Fire Resistive Glass Opens New Doors for Adaptive Reuse Project

SAFTI FIRST

Adaptive reuse, or the process of taking an old building or structure and repurposing it for something other than what it was originally designed for, has gained a lot traction with developers and architects alike – and for many good reasons. For one thing, it is more economical and sustainable to work with an existing structure than to demolish an old building, clean up the site, and rebuild with entirely new materials. It also helps preserve historical structures that add character to the community, as well as reduce urban sprawl. For the multifamily sector, we’ve seen adaptive reuse applied to old schools, government buildings, warehouses, etc. because these structures are usually centrally located in many downtown areas.
Sponsored
CSSBI SSF 20-14:
Recycled Content of Steel Building Products

CSSBI SSF 20-14: Recycled Content of Steel Building Products

Trimet Building Products

The construction industry is a vital part of the growth and success of a country. It is responsible for building the physical infrastructure that provides transportation and facilities for citizens, businesses, industries and institutions. Construction has a major influence on the economic wealth, societal well¬being and sustainability of the built environment. The Canadian construction industry employs more than 1.2 million people. In 2010 it accounted for 6% of Canada’s gross domestic product (GDP), with a total value of 73.8 billion dollars. From 2000 to 2010, the GDP from construction increased 42.7% whereas GDP for all industries increased 20.2%.(1) Construction also has a profound impact on our natural environment. In North America, the built environment accounts for approximately one third of all the greenhouse gas (GHG) emissions, as well as energy, water and materials consumption. Given the increased awareness of “green” construction, there is growing interest in using steel because of the major recycled content and recyclability attributes it provides to architects, engineers and specifiers in the construction industry. The steel industry, through the Canadian Sheet Steel Building Institute is committed to providing steel solutions that promote the use of sustainable materials in construction applications. This fact sheet provides an overview of the two main methods used to produce steel, and describes the recycled content of the steels used to manufacture building products such as roofing, cladding, decking, structural and non-structural framing and the many other construction products used in the industry. Once iron ore is extracted and refined into steel, its life never ends. This makes steel an ideal material to deploy in sustainable strategies for the construction industry. Today’s steel is produced using two technologies both of which require “old” (recycled scrap) steel to make “new” steel. The combination of these technologies enables Canadian steel mills the flexibility to produce a variety of steel grades for a wide range of product applications
Sponsored
Cost Considerations for
Prepainted Sheet Steel Cladding

Cost Considerations for Prepainted Sheet Steel Cladding

Trimet Building Products

This Fact Sheet has been written to describe some of the factors that affect the cost of prepainted sheet steel cladding products. The most significant factors are: colour, paint system, order quantity, Fabricator's inventory and profile selection. Recognition of the impact of these factors can help you select a prepainted sheet steel cladding system to fit the aesthetic and durability requirements of your project, and still stay within a budget. 
Sponsored
Harbour Central Case Study

Harbour Central Case Study

FutureGlass

About Galliard HomesHaving serviced London’s real estate market for over a quarter of a century, Galliard Homes is the English capital’s largest privately owned residential developer. Over their years in the business, Galliard has become synonymous with regeneration, rejuvenation and reinvention. About Our CustomerProviding a wide range of façade design and engineering services to real estate companies across Europe, Yuanda has been transforming the continent’s skylines for over a decade. By offering a combination of European system design and Chinese materials and fabrication, Yuanda continues to provide world-class and cost-effective façade solutions to the UK, France, Germany and Switzerland. The BriefThe Harbour Central project was conceptualised to transform the London Docklands into an up-and-coming residential area. The project, which comprises 5 residential towers, boasts a total façade area of 63,000 square metres. The façades were designed to superimpose a metal mesh on the shadow box area and showcase the aesthetics of the blocks. Moreover, the team of architects at Rolfe Judd had very precise specialty glazing requirements for the buildings. “We discussed product aesthetics, construction and design considerations. The architect had a specific idea in mind regarding the kind of colour finish they required and Future Glass was able to provide the perfect gold and silver tones that were needed.”- Mr Alain Anthony, Design Director, Yuanda EuropeThe Future Glass SolutionThe search for the perfect glass led us across countries and continents. After an exhaustive search, the silver mesh was procured from Germany while the gold mesh was procured from Italy. Since the glass panels required were of a very large size, an innovative solution was sought by which panels of a maximum size of 1,500 mm x 4,000 mm were created with the metal mesh suspended in the cavity of the IGU. To put concerns about mesh sagging and distortion to rest, a sample panel was provided to the client. For energy efficiency, Climaguard Premium 2T, a high performance Low-E coated glass was procured from Guardian Glass in Europe. The glass itself is made up of a combination of products. The outer-lite is a clear ecoLAM (HS) of 10.76 mm. The expanded metal mesh infill is within a 24 mm black spacer with argon gas. Finally,  the inner lite is a 6 mm clear ecoFACADE (HS). Despite the complicated product combination, the performance specifications were designed to meet the client’s requirements perfectly. A total of about 4,100 square metres of finished insulated glass units with expanded metal mesh were provided for the Harbour Central project.The Future Glass AdvantageAt Future Glass’ state-of-the-art facility in UAE, a dedicated workforce was tasked with ensuring the high-specialty glass was treated in a sterile environment where temperature and humidity could be controlled. Each glass panel is handmade and pieced together under the supervision of qualified engineers. The finished glass panels were placed in IPPC-certified wooden crates for transport. As per local requirements, each piece was individually banded and then shipped to Yuanda’s Shenyani factory. From there, the panels were carefully assembled into a framing system that was delivered to the site in London. Despite the fact that the materials were sourced from various countries, the logistics and operations team took every precaution necessary to ensure zero breakages during the delivery process. In case panels needed to be replaced, we did what was necessary without impacting the timelines, even though it was difficult to procure smaller quantities of mesh from the supplier.
Sponsored
Crosstown Condos - 844 Don Mills

Crosstown Condos - 844 Don Mills

Envirospec

Crosstown Condos, a landmark development in Toronto’s Don Mills neighbourhood, represents the future of modern urban living, blending quality construction, sustainability, and thoughtful design. Set adjacent to the upcoming Eglinton Crosstown LRT Line 5, the community offers seamless transit connectivity alongside state-of-the-art amenities.At the core of its expansive outdoor terraces and rooftop patios lies Envirospec’s Canadian-made PAVE-EL Pedestal system, a solution that proves smart infrastructure can deliver long-term value.Challenge:The project included large outdoor amenity spaces across multiple residential towers. These spaces required a raised pedestal system that could ensure perfect levelling, long-term durability, effective drainage, and performance in all seasons — all while being cost- and material-efficient.Solution:Envirospec’s PAVE-EL Pedestal system was selected for its precision engineering, durability, and ease of installation. Unlike screwjack systems that require full pedestals throughout, PAVE-EL’s modular approach allowed installers to use half pedestals along patio edges and quarter pedestals in corners, reducing material requirements significantly.This not only cut material waste but also reduced installation time and labour costs, with installation completed in approximately one-third the time compared to traditional systems. Backed by a 40-year track record of zero product failures and a 25-year warranty, PAVE-EL offers peace of mind along with proven long-term performance. Outcome:Material Savings: Smart use of half and quarter pedestal sizes reduced overall pedestal material needs.Cost & Time Reduction: Faster, simpler installation led to lower labour costs and project efficiency, allowing construction teams to move on to the next stage of the project more quickly.Performance: Patios achieved perfect levelling and drainage, enhancing resident comfort, enjoyment and outdoor usability.Sustainability: The polyethylene-based system is designed to last over 100 years, with a 25-year warranty, aligning with the development’s long-term sustainability goals and reducing environmental impact. Withstands all natural temperatures on Earth. Made in Canada: Supporting local innovation and supply chain reliability.By leveraging the versatility and durability of the PAVE-EL system, Crosstown Condos showcases how innovative construction solutions can elevate both form and function in modern developments.

Showing 1-6 of 6

Feedback