You are viewing content for Canada.

Choose a country to see content for your location. Changing region will navigate you to the homepage.

NBS Source
I'm a manufacturer

"office management software"

148 results found

Sort by:

Showing 1-13 of 13

Sponsored
Casa Loma, Toronto

Casa Loma, Toronto

ACO Canada

Casa Loma is a Gothic Revival castle-style mansion and garden in midtown Toronto, Ontario, Canada, that is now a historic house museum and landmark. It was constructed from 1911 to 1914 as a residence for financier Sir Henry Pellatt.Part of the renovations carried out was improving the water management on the exterior terrace located at the back of the building. The requirement was for the stormwater to be collected and disposed of efficiently without creating an unsightly 3D grading of the terrace surface. Linear drainage was the natural selection.ACO KlassikDrain KS100 was chosen for its robustness and ability to withstand Canadian weather conditions. The perforated stainless steel grate will resist corrosion and it is AODA and heelproof compliant, important requirements for this public venue.
Sponsored
Rose Rocket

Rose Rocket

Hush Acoustics (Canada)

Rose Rocket, a Canadian software company, established their head office in the heart of downtown Toronto in 2020. They chose a heritage site featuring a three-story atrium surrounded by a ‘U’-shaped office space. Ray Architecture Studio partnered with Hush Acoustics to bring their interior design vision to life, which included smaller meeting rooms, larger boardrooms, and an open office concept.
Sponsored
Molson Brewery

Molson Brewery

ACO Canada

Located at the foot of the Cascade mountain range in Chilliwack, the brand-new Molson – Coors was inaugurated in 2019. It has the capacity to produce 300 million litres of beer a year. The brewery is equipped with advanced technologies for operational efficiency, and it is considered Molson’s most modern facility.The plant was designed with optimised equipment layouts that help reduce beer loss and wastage. Hygienic industrial drainage is a major component of the design and ACO drainage was selected for its proven performance.Benefits of ACO StainlessEasy to clean hygienic designStainless steel is highly resistant to corrosionHigh hydraulic efficiency for fast removal of surface waterACO’s experience in drainage for food processing environments
Sponsored
Al Wasl Plaza

Al Wasl Plaza

FutureGlass

Al Wasl Plaza was the heart of Dubai Expo 2020 and continues to remain the focal point of Expo City. The central dome, surrounded by a decorative garden and five buildings, truly reflects the theme, Connecting Minds, Creating the Future. Working on the Al Wasl Plaza required careful thought and consideration. We had to ensure that the three office buildings and two hotels enjoyed unobstructed views of the garden and dome while maintaining energy efficiency and privacy.  The project was designed by Chicago-based architecture firm Adrian Smith + Gordon Gill. Since the project was part of Expo 2020, which invited representatives from around the globe, we had to ensure we met and exceeded global glass and glazing standards. We understood that the buildings were the supporting cast for the dome and gardens, yet they played a crucial role in making the entire plaza the focal point of the Expo.
Sponsored
A Nine-Story Lesson in Branding Excellence

A Nine-Story Lesson in Branding Excellence

SAFTI FIRST

SuperLite® II-XLM 120 clear butt-glazed walls with 9 ft. GPX® Builders Series 90 minute Temperature Rise doors creates a light-filled, transparent 2-hour stairwell that is on-brand with Waste Management’s new Houston Headquarters.
Sponsored
Fire Rated Glazing Helps Achieve Unobstructed, Floor-to-Ceiling Views in 2-Hour Atrium Wall

Fire Rated Glazing Helps Achieve Unobstructed, Floor-to-Ceiling Views in 2-Hour Atrium Wall

SAFTI FIRST

There is a growing trend in office space design that favors increased opportunities for connectivity and collaboration among its occupants. In buildings with multiple floors, this can be a challenge as the vertical separation between floors makes face-to-face encounters less likely to happen. One way to get around this is by incorporating an atrium. See how fire rated glass helped the designers meet the fire rated requirements for this atrium while providing clear, unobstructed views.
Sponsored
Korean Pavilion

Korean Pavilion

FutureGlass

Project DescriptionOne of the most awe-inspiring pavilions at the Expo 2020, was the Korean Pavilion embodying the theme “Smart Korea, Moving the World Forward.” It was the fifth-largest exhibit at the Expo, and the entire pavilion was shaped like an octagon. The unique pyramid structure ensured enough light entered the pavilion, while the north façade had rotating cubes that displayed myriad images and colours. To truly revel in the beauty of the pavilion, visitors could walk through the spiral aisles to admire the exhibits inside while still catching glimpses of the extraordinary view.About the ClientEstablished in 1962, the Korea Trade-Investment Promotion Agency (KOTRA) helps expand small and medium local businesses in overseas markets. They also work to attract foreign investment and develop international trade relations. KOTRA is known for spearheading innovative businesses and successfully building mutually beneficial partnerships. They sustain their growth through 127 offices worldwide, with over 15 offices in West Asia, including one in Dubai Media City.The BriefThe client wanted to truly showcase Korea’s forward-thinking vision. They designed a unique façade for the pavilion, with a steep slope on the south to let in adequate light and warmth. On the opposite side, a rotating cube protrudes from the basic slope, creating a dynamic façade that changes with
Sponsored
Fire Rated Glass Helps SFPUC Building Achieve LEED Platinum

Fire Rated Glass Helps SFPUC Building Achieve LEED Platinum

SAFTI FIRST

The new San Francisco Public Utilities Commission Headquarters combines maximum daylighting and fire safety with a multi-story, fire rated glass stairwell from SAFTI FIRST. Dubbed as the "greenest building in North America," this Class A LEED Platinum office building features a transparent, 2-hour fire rated stairwell, situated prominently near the main entrance. SAFTI FIRST supplied SuperLite II-XL 120 in GPX Architectural Series Wall Framing and SuperLite II-XL 90 in GPX Builders Series Temperature Rise Door starting from the lobby all the way to the topmost floor.
Sponsored
Qatar National Library

Qatar National Library

FutureGlass

About the ProjectThe Qatar National Library covers over 42,000 sq. metres and houses millions of books, e-books, historic texts, manuscripts, periodicals and more. The entire building has been envisioned to look like a single room with clear views of the surrounding areas. Tying into the entire project’s overarching theme, the architect designed the building to resemble a diamond. A sunken patio in the heart of the building provides light to the office spaces while also serving as a transition space between the harsh outdoors and the sanctuary of books inside.The ChallengeThe customer’s vision for the library required panels that offered clear views with minimal to no reflection.
Sponsored
Position Paper on Oil-Canning: Specifying Wide Flat
Panels in Metal Cladding

Position Paper on Oil-Canning: Specifying Wide Flat Panels in Metal Cladding

Trimet Building Products

What is Oil-Canning? Oil-canning is associated with all thin sheet metal products and occurs in the wide flat portions of the cladding profile. It is seen as a series of standing waves, or regular bumps and hollows alternating along the flat length of the panel. This waviness, when viewed under certain conditions, can be undesirable aesthetically and may not meet with the owner’s expectations. The CSSBI wants to help avoid this situation. The cladding manufacturers are aware of the potential for oil-canning in the cladding profiles and can help minimize the effect. It is important for the proper steps to be taken during manufacturing and installation to produce a quality finished product; therefore, specifiers should insist on product from a reliable, experienced cladding manufacturer, like a CSSBI member company. Quality control, however, cannot end on the shop floor. The building project needs the cooperation and knowledge of everyone involved to enhance the quality of the finished job. Oil-canning is a phenomenon that can be managed if the following factors are considered at the beginning of a project.
Sponsored
College of Business

College of Business

FutureGlass

About the ProjectA new educational hub in the heart of Kuwait, the College of Business is known for its impeccable design and breathtaking facade. A part of Kuwait’s much larger Sabah Al Salem University complex, the college building is an interactive teaching and research space where students hone their business skills. The building’s unique architecture, with vertical louvre shades and expansive rooflines, was created to maximise the natural airflow while minimising solar penetration The ChallengeThe building had a roof of approx 4,000 sq. m., which would allow a large amount of heat to enter through the skylight. This posed a big challenge to the architects in order to manage the cooling loads for the building. Our brief was to make the building as energy-efficient as possible, which called for us to find a way to keep heat transmission to a minimum while also maximising light transmission. Finding the appropriate build-up for the skylight was key for the success of the project completion in the short term and for the operation of the building in the long term to ensure sufficient light disbursement and reduction of solar heat gain. The glass make up had to protect the interiors from the harsh sunlight while also ensuring that the sun’s movement did not leave parts of the building in darkness. The idea was to ensure uniform dispersion of sunlight so as to reduce the occurrence of shadows and contrasts within the space. 
Sponsored
Steel: unparalleled fire safety

Steel: unparalleled fire safety

Trimet Building Products

Steel: unparalleled fire safety Life safety, and specifically fire protection, has been a primary concern of the building codes. Steel is a non-combustible material and consequently does not burn, provide an ignition source or add fuel load that would enable a fire to spread or grow into a catastrophic event. Steel does not melt at temperatures typically encountered in a building fire. Its non-combustibility and assembly fire ratings do not degrade over the lifecycle of a building. This provides a reduced fire risk, to workers and occupants, minimizes the impact on municipal fire services, decreases the reliance on sprinklers, and results in less property damage and collateral damage to adjacent buildings if a fire should ever occur. • Steel has a melting point of approximately 1,500ºC (2,700ºF). In a typical fire, such as in an office, residential or retail occupancy, the maximum temperature of a fully developed fire will not likely exceed a range of 800ºC to 900ºC (1,500ºF to 1,650ºF), though it could reach a peak of 1,100ºC (2,000ºF) for a short duration. • Building codes recognize the fact that buildings, designed with non-combustible materials like steel, pose less of a fire risk to the public than combustible systems, which are limited to six storeys in height in Canada and 25.9m (85 ft.) in the US. STEEL IS A NON-COMBUSTIBLE MATERIAL AND CONSEQUENTLY DOES NOT BURN, nor does it provide an ignition source or add fuel load that would enable a fire to spread or grow into a catastrophic event. “Changes in the building codes that allow combustible framing in taller and larger buildings have gone too far and it’s created a perfect storm that can quickly overwhelm the ability of the fire service to respond.” CHIEF STEVE LOHR, HAGERSTOWN (MD) FIRE DEPARTMENT
Sponsored
Silicon Central

Silicon Central

FutureGlass

Scope of WorkProcess and deliver double-glazed triangle-shaped units with a dotted frit ceramic design with 50% coverage providing shading to the internal areas. The mall's skylight required 6,000 individual units in multiple configurations with a total area of ….m2Build Up39.52 mm ecoTHERM (IGU) consisting of ecoSHIELD (T) 10 mm COOL-LITE SKN 144, 16 mm spacer, ecoSHIELD (T) 6 mm clear (Guardian), 1.52 mm clear PVB (Trosifol), ecoSHIELD (T) 6 mm clear (Guardian), U-insert (Silicon Dow Corning – 3362)Triangle Glass – 29.52 mm ecoTHERM (IGU + LAMI) consisting of ecoSHIELD (T) 6 mm COOL-LITE SKN 144, 12 mm spacer, ecoSHIELD (T) 5 mm clear, 1.52 mm clear PVB (Trosifol), ecoSHIELD (T) 5 mm clear, U-insert (Silicon Dow Corning – C-3362)Project DetailsThe Lulu Group, known predominantly for its hypermarkets spread across Dubai, decided to create a mall in the heart of the Silicon Oasis Smart City. Silicon Central was designed with sustainability at the forefront, populated by plants, water and natural light.Given Dubai’s harsh summers, we had to ensure the skylight allowed light to pass while filtering heat and minimising glare to ensure shoppers had a comfortable experience. Only 50% of the skylight is transparent, while the rest is opaque. We achieved the shading effect by using dotted ceramic frit in the panels. The main atrium skylight comprised triangle-shaped panels, which complicated the processing due to sharp corners. To ensure the delivery of all 6,000 panels seamlessly, we set up a multi-glass management system to easily track and handle the different glass sizes and codes.The skylight was installed successfully, and Silicon Central has become an integral part of the sustainable Silicon Oasis neighbourhood.

Showing 1-13 of 13

Feedback