NBS Source
I'm a manufacturer

"moving designs ltd"

512 results found

Sort by:

Showing 37-56 of 56

Sponsored
Fire Rated Glass Adds Safety to Nanobioelectronics Clean Room

Fire Rated Glass Adds Safety to Nanobioelectronics Clean Room

SAFTI FIRST

The Joint School of Nanoscience & Nanoengineering within the Gateway University Research Park in Greensboro, North Carolina is a new 105,000 sf interdisciplinary research facility dedicated to academic and industrial research. To create an open, transparent lab design, SAFTI FIRST® provided SuperLite® II-XL 60 in GPX® Architectural Series Frames for the 60 minute walls.
Sponsored
Fire Rated Security Glass at Plaquemines Parish Detention Center

Fire Rated Security Glass at Plaquemines Parish Detention Center

SAFTI FIRST

Plaquemines Parish Detention Center was one of the major structures devastated by Hurricane Katrina in 2005. In rebuilding, designers L. R. Kimball looked for an all-in-one clear, wire-free glazing solution that protects against fire, bullets and forced entry. SAFTI FIRST® supplied a complete single-source tested and listed assembly that was easy to install and maintenance-free.
Sponsored
Technical College Renovation Features Fire Rated Glass Walls

Technical College Renovation Features Fire Rated Glass Walls

SAFTI FIRST

Central to the building's design are several simulation labs, practice labs, and mock operating rooms where students can observe instructors and each other as they perform their tasks. Because these labs are in areas where a 1-hour fire rating has to be maintained, the architects chose to combine vision, transparency, and fire safety with SuperLite® II-XL 60 in GPX® Architectural Series framing.
Sponsored
Clear, Fire Resistive Butt-Glazed Walls Create Transparent, Connected and Code-compliant Stairwell

Clear, Fire Resistive Butt-Glazed Walls Create Transparent, Connected and Code-compliant Stairwell

SAFTI FIRST

The University of Wisconsin School of Business Grainger Hall’s east and west wings are now linked by a state-of-the-art Learning Commons that encourages collaboration through technology and design. To achieve maximum transparency while meeting code requirements, the architects specified 9 ft. tall, clear, fire resistive butt-glazed walls using SuperLite® II-XLM in GPX® Architectural Series perimeter framing.
Sponsored
Beautiful 2-Hour Glass Floor Brings Light and Protection to San Francisco’s Union Square Station

Beautiful 2-Hour Glass Floor Brings Light and Protection to San Francisco’s Union Square Station

SAFTI FIRST

SAFTI FIRST® provided a unique, artistic 2-hour fire resistive glass floor to the new Union Square Station in San Francisco. This glass floor acts as a lightwell and designed to improve wayfinding by welcoming commuters into the concourse level while meeting all the fire rated code requirements. Because SAFTI FIRST®’s products are proudly USA-made, it met the Buy America requirements of the project as well.
Sponsored
THE BENEFITS OF STEEL VS. WOOD FOR MID-RISE BUILDING CONSTRUCTION

THE BENEFITS OF STEEL VS. WOOD FOR MID-RISE BUILDING CONSTRUCTION

Trimet Building Products

Sustainability, durability, fire resistance, structural performance and cost-effectiveness are some of the strongest reasons for using structural steel or cold-formed steel framing in mid-rise building construction. As a dependable, noncombustible material, steel-framed structures provide a wise investment for builders and the occupants who live and work in them. Steel structures provide long-term, consistent performance. • Steel framing will not rot, warp, split, crack or creep. • Steel framing is not vulnerable to termites. • Steel framing does not expand or contract with moisture content. • Steel framing is produced in strict accordance with national standards, with no regional variations. Steel is a noncombustible material and will not contribute to the spread of a fire. • Because steel is noncombustible, it reduces the fire risk to occupants, firefighters and property/business owners. Steel framing improves design efficiency, saves time, and reduces costs. • Steel framing provides a significantly greater strength-to-weight ratio than wood. • Steel framing allows for larger bays and wider frame spacing than wood construction. • Increased flexibility in bay spacing and framing layout maximizes usable floor space for owners and tenants. • Steel is typically fabricated off-site, reducing on-site labor, cycle time and construction waste. • Shorter construction time results in earlier occupancies and lower financing costs. Steel structures perform well during earthquakes and other extreme events. • Steel is a resilient material, with reserve strength and ductility that result in significant advantages in natural disasters such as hurricanes and earth- quakes, and in other extreme events like fire and blast. • Steel construction is engineered to provide a reliable, consistent load path. • Steel construction employs quality control and quality assurance procedures to ensure that the project requirements are met. Steel framing provides environmental benefits and complies with sustainable building standards. • Steel framing results in less scrap and job site waste than lumber. • Structural steel is continually recycled with a current recycling rate of 98 percent, meaning that these steels will still be in use hundreds of years from now, lessening impacts on future generations. • Steel, when recycled, loses none of its inherent properties and can be recycled into different products such as cars, bridges, cans, etc. • Steel can be used to comply with the requirements of sustainable design standards such as the International Green Construction Code (IgCC), ASHRAE Standard 189.1 (Standard for the Design of High-Performance Green Buildings Except Low-Rise Residential Buildings), and the National Green Building Standard (ICC-700). Steel can also provide credit points for green building rating systems like the USGBC’s LEED (Leadership in Energy and Environmental Design) and the Green Building Initiative’s ANSI/GBI-01 (Green Building Assessment Protocol for Commercial Buildings).  
Sponsored
Fire Rated Glass Transforms Retail Parking Garage with Natural Light and Vision

Fire Rated Glass Transforms Retail Parking Garage with Natural Light and Vision

SAFTI FIRST

Traditional parking garage designs used to have opaque fire rated building materials like concrete, masonry and drywall which made these spaces dark, cold and uninviting. That all changed, thanks to the emergence of new technology, clear, fire resistive glazing tested to ULC/CAN S101 up to 2 hours that are available in large sizes and low-iron glass make-ups with high visible light transmission for superior clarity and color neutrality.
Sponsored
Fire Rated Glass Brings Whimsical and Reliable Protection at Children’s Hospital

Fire Rated Glass Brings Whimsical and Reliable Protection at Children’s Hospital

SAFTI FIRST

One of the highlights of the SUNY University Hospital’s vertical expansion is the addition of the Golisano Children’s Hospital on the top two floors of the six-story addition. Since the project added new floors, stairwell enclosures were also added. Traditionally, stairwells are relegated to the back of the building, and are usually closed-off, dimly lit and seldom used. Today, stairwells are becoming a prominent design feature and their use is encouraged more and more for the health benefits that stair climbing provides.
Sponsored
Light-Filled Transit Center Receives Honor with the Help of Fire Resistive Butt-Glazed Glass Walls

Light-Filled Transit Center Receives Honor with the Help of Fire Resistive Butt-Glazed Glass Walls

SAFTI FIRST

Bringing the outside in was an important design element for the newly opened BART Milpitas Transit Center. ASTM E-119/UL 263/CAN ULC S101 rated, fire resistive SuperLite® II-XLB 60 butt-glazed walls were used for the 1 hour light wells to allow abundant natural light to flow vertically and horizontally through two levels – from the entrance/ticketing level and all the way down to the tracks where the train cars are.
Sponsored
Cincinnati Art Museum Renovation Features Transparent Stairwell

Cincinnati Art Museum Renovation Features Transparent Stairwell

SAFTI FIRST

When the Cincinnati Art Museum embarked on an $11 million renovation, the architects wanted the entrance and main stair to be as inviting as possible. Transparent, fire rated glazing from SAFTI FIRST® was a key component of the design solution. To maximize the vision area in door itself, SuperLite® II-XL 60 in GPX® Builders Series Temperature Rise full-lite doors. In some of the stairwell doors in less prominent locations, SAFTI FIRST® provided SuperLite® X-90 for the vision panels under 100 sq. inches.
Sponsored
Fire Rated Glass Provides Privacy, Daylight at Ridgewood High

Fire Rated Glass Provides Privacy, Daylight at Ridgewood High

SAFTI FIRST

For a recent renovation of a stairwell and exit corridors at Ridgewood High School in Illinois, the design team specified SuperLite® II-XL 60 in GPX® Architectural Series Framing for its optical clarity, storefront-like appearance, and high STC ratings. In order to meet the code requirements and maximize the daylight penetrating into the building, the architects decided to use fire rated glass in the one-hour exit corridor. Because the glazing exceeds 25% of the wall area, fire resistive glass and framing assemblies rated equal to the wall had to be used.
Sponsored
Fire Resistive Blast and Ballistic Glass Walls in High Security Facilities

Fire Resistive Blast and Ballistic Glass Walls in High Security Facilities

SAFTI FIRST

A building’s design is very much influenced by the function it performs and the perceived threats that it may face – whether it’s from natural disasters, accidents or terrorist attacks – with the latter being a foremost concern for federal courthouses, embassies, government facilities and other high profile buildings. Because of these security concerns, trade-offs have been made when it comes to daylighting, energy efficiency and aesthetics to name a few. The good news is that today, high-performance security glazing make-ups are available to meet the level of protection needed while continuing to provide natural light and a feeling of openness.
Sponsored
Medical Center Maximizes Natural Daylight with Fire Rated Glass

Medical Center Maximizes Natural Daylight with Fire Rated Glass

SAFTI FIRST

Central to the new UC Davis Medical Center Surgery and Emergency Services Pavilion's design was a large skylight that allows natural light to vertically flow into the atrium area and other light wells throughout the building. However, they also wanted to let light flow horizontally into the adjacent hallways, rooms, etc. Because the walls in the atrium and light wells have to meet a 2-hour rating, Stantec Architects approached SAFTI FIRST® for a solution. Large portions of the 2 hour atrium and light well walls were made “transparent” with the use of SuperLite® II-XL 120 in GPX® Framing.
Sponsored
Fire Resistive Glass Opens New Doors for Adaptive Reuse Project

Fire Resistive Glass Opens New Doors for Adaptive Reuse Project

SAFTI FIRST

Adaptive reuse, or the process of taking an old building or structure and repurposing it for something other than what it was originally designed for, has gained a lot traction with developers and architects alike – and for many good reasons. For one thing, it is more economical and sustainable to work with an existing structure than to demolish an old building, clean up the site, and rebuild with entirely new materials. It also helps preserve historical structures that add character to the community, as well as reduce urban sprawl. For the multifamily sector, we’ve seen adaptive reuse applied to old schools, government buildings, warehouses, etc. because these structures are usually centrally located in many downtown areas.
Sponsored
CSSBI S8-2018:
Quality and Performance Specification for Prefinished Sheet Steel Used for Building Products

CSSBI S8-2018: Quality and Performance Specification for Prefinished Sheet Steel Used for Building Products

Trimet Building Products

1. SCOPE 1.1 The following specifications shall apply to hot-dipped metallic-coated sheet steel prefinished with colours of proven durability and suitable for exterior exposure as delivered from the coil coater. Proven paint systems for building products have been designed for vertical applications whose surfaces are no more than 30° to the vertical and non-vertical applications whose surfaces ranging from 5° up to 60° to the horizontal. It is not recommended for aggressive atmospheric exposure. 1.2 The prefinish system shall consist of a primer and topcoat continuously applied and cured within the paint manufacturer’s specifications on cleaned, pretreated, metallic-coated substrate. The pretreatment specified shall be zinc phosphate for galvanized steel and metal oxide pretreatment for aluminum-zinc alloy-coated steel, applied in accordance with the pretreatment manufacturer’s specifications.
Sponsored
How To Series - Pre-finished Sheet Steel for Retrofit

How To Series - Pre-finished Sheet Steel for Retrofit

Trimet Building Products

Preface This How To Series publication is an educational tool intended to give guidance to anyone specifying sheetsteel building products. This particular publication deals with the retrofit of the building envelope utilizing sheet steel. This is a generic guide giving the basic details and should only supplement the specific recommendations or design guidance published by the manufacturer appropriate to their own products. The material presented in this publication has been prepared for the general information of the reader. While the material is believed to be technically correct and in accordance with recognized good practice at the time of publication, its should not be used without first securing competent advice with respect to its suitability for any specific application. Neither the Canadian Sheet Steel Building Institute norites Members warrant or assume liability for the suitability of the material for any general or particular use.
Sponsored
Prepainted Sheet Steel: Taking on Canada’s Climate
for Decades

Prepainted Sheet Steel: Taking on Canada’s Climate for Decades

Trimet Building Products

Four Key Components Constitute Prefinished Sheet Steel Prefinished sheet steel for construction consists of four major components: the sheet steel itself, a metallic (zinc or aluminum-zinc alloy) coating, chemical pre-treatment and primer, and a top coat. Each performs an important role in providing designers with a high quality, aesthetic, cost competitive and corrosion-resistant material. The backbone of the system is sheet steel, an ideal material for covering large surface areas because of its economy and high strength-toweight ratio. Protection against the demanding Canadian environment is provided by the metallic coating, one of the most effective methods of protecting bare steel from corrosion. Both zinc and aluminum-zinc alloy provide a tough, non-porous coating
Sponsored
One World Trade Center

One World Trade Center

Master Builders Solutions

Soaring to a height of 1,776 feet (540-meters), the 2.6-million-squarefoot (242,000-square-meter) skyscraper known as One World Trade Center in the lower Manhattan district of New York City is a marvel of design and engineering. Construction of the building, previously called the Freedom Tower, began in April 2006 and at the time was the tallest building in the United States.The Challenge Sustainable design was a central theme to One World Trade Center’s development, with the Port Authority of New York/ New Jersey imposing a strict requirement for the replacement of Portland cement with recycled materials. In addition, extremely high performance concrete was necessary to meet the compressive strength requirements of the steel and concrete structural columns, which ranged from 14,000 psi (97 MPa) to 12,000 psi (83 MPa) for the lower 40 floors and 10,000 psi (69 MPa) to 8,600 psi (59 MPa) for the upper floors. The 12,000 psi (83 MPa) concrete phase of the project was the most challenging, with the engineers, owners and contractors all having their own requirements and specifications.The ResultsThrough Master Builders Solutions‘ Green Sense Concrete mixture optimization service, Eastern Concrete Materials was able to proportion an EF Technology® concrete mixture with 71% cement replacement. The mixture replaced Portland cement with the recycled materials, non-cementitious fillers and specialized admixtures to exceed all the performance targets specified by the One World Trade Center project stakeholders. This EF Technology mixture was used for the 38,000 yd3 (29,000 m3) of concrete needed for the columns through the first 40 floors. To quantify the environmental impact of sustainable concrete for the structure, an Eco-Efficiency Analysis was conducted, using a methodology validated by NSF International, to compare the specialized EF Technology mixture to a reference mixture. Some practical equivalents for these savings are: Water savings equal to 1,177,329 half-liter bottles of waterReduced carbon footprint equal to 1,835,494 gallons of gasolineFossil fuel savings equal to 29,872 barrels of oil
Sponsored
Silicon Central

Silicon Central

FutureGlass

Scope of WorkProcess and deliver double-glazed triangle-shaped units with a dotted frit ceramic design with 50% coverage providing shading to the internal areas. The mall's skylight required 6,000 individual units in multiple configurations with a total area of ….m2Build Up39.52 mm ecoTHERM (IGU) consisting of ecoSHIELD (T) 10 mm COOL-LITE SKN 144, 16 mm spacer, ecoSHIELD (T) 6 mm clear (Guardian), 1.52 mm clear PVB (Trosifol), ecoSHIELD (T) 6 mm clear (Guardian), U-insert (Silicon Dow Corning – 3362)Triangle Glass – 29.52 mm ecoTHERM (IGU + LAMI) consisting of ecoSHIELD (T) 6 mm COOL-LITE SKN 144, 12 mm spacer, ecoSHIELD (T) 5 mm clear, 1.52 mm clear PVB (Trosifol), ecoSHIELD (T) 5 mm clear, U-insert (Silicon Dow Corning – C-3362)Project DetailsThe Lulu Group, known predominantly for its hypermarkets spread across Dubai, decided to create a mall in the heart of the Silicon Oasis Smart City. Silicon Central was designed with sustainability at the forefront, populated by plants, water and natural light.Given Dubai’s harsh summers, we had to ensure the skylight allowed light to pass while filtering heat and minimising glare to ensure shoppers had a comfortable experience. Only 50% of the skylight is transparent, while the rest is opaque. We achieved the shading effect by using dotted ceramic frit in the panels. The main atrium skylight comprised triangle-shaped panels, which complicated the processing due to sharp corners. To ensure the delivery of all 6,000 panels seamlessly, we set up a multi-glass management system to easily track and handle the different glass sizes and codes.The skylight was installed successfully, and Silicon Central has become an integral part of the sustainable Silicon Oasis neighbourhood.
Sponsored
CSSBI SSF 24-07:
Natural Finish Metallic Coatings - Attractive but not Architectural

CSSBI SSF 24-07: Natural Finish Metallic Coatings - Attractive but not Architectural

Trimet Building Products

Architects and Specification Writers are increasingly selecting unpainted metallic coated steels for architectural roofing and cladding applications on building exteriors where they want a “Silver” metallic finish. This is occurring more frequently, and even on “prestige” type projects. The Canadian Sheet Steel Building Institute whose fabricator members manufacture a wide variety of building panel profiles for roofing and cladding applications, are being asked to supply unpainted (natural finish) galvanized or resin coated 55% Aluminum-Zinc coated steel for these architecturally exposed end uses. Oftentimes, these materials are specified because the designer finds the natural finish of these products very appealing and sometimes because of material cost savings opportunities. This Fact Sheet has been developed to provide guidance in material selection and provide information on the Architectural Metallic Finishes that are available for highly visible steep slope roofing and cladding applications. 

Showing 37-56 of 56

Feedback