NBS Source
I'm a manufacturer

"rk door systems"

344 results found

Sort by:

Showing 1-36 of 39

Sponsored
A Clear Solution for Harvard’s Klarman Hall

A Clear Solution for Harvard’s Klarman Hall

SAFTI FIRST

This new 120,000 square foot, state-of-the-art convening center features a 1,000-seat auditorium that is large enough to host the entire MBA class. The glass atrium floods the multi-purpose lobby with natural light, as well as provides a visual connection between the interior of the building and the outdoor environment. To maximize transparency, SAFTI FIRST® met with the architects during the design phase to create a large, 2-hour, glass wall that separates the lobby from the auditorium while providing a visual connection between them. Since this 2-hour glass wall also serves as the entrance to the auditorium, deciding on a 90-minute door system was of upmost important. SAFTI FIRST®’s in-house engineering department provided design assistance, system details, engineering calculations and support from the planning phase all the way to the submittal process.
Sponsored
Tall Order at the Exploratorium

Tall Order at the Exploratorium

SAFTI FIRST

The newly opened Exploratorium has brought energy and excitement to the city's bustling waterfront. EHDD transformed the historic Pier 15, built in 1915, to a 330,000 square foot indoor and outdoor campus, being touted as the largest net-zero building in the city and potentially the largest net-zero museum in the world. SAFTI FIRST® supplied a total of 19 pairs of 45-minute steel doors 11 pairs on north side and 8 pairs on the south side using SuperLite® II-XL 45 IGU in GPX® Builders Series Fire Protective.
Sponsored
A Nine-Story Lesson in Branding Excellence

A Nine-Story Lesson in Branding Excellence

SAFTI FIRST

SuperLite® II-XLM 120 clear butt-glazed walls with 9 ft. GPX® Builders Series 90 minute Temperature Rise doors creates a light-filled, transparent 2-hour stairwell that is on-brand with Waste Management’s new Houston Headquarters.
Sponsored
Fire Resistive Glass Opens New Doors for Adaptive Reuse Project

Fire Resistive Glass Opens New Doors for Adaptive Reuse Project

SAFTI FIRST

Adaptive reuse, or the process of taking an old building or structure and repurposing it for something other than what it was originally designed for, has gained a lot traction with developers and architects alike – and for many good reasons. For one thing, it is more economical and sustainable to work with an existing structure than to demolish an old building, clean up the site, and rebuild with entirely new materials. It also helps preserve historical structures that add character to the community, as well as reduce urban sprawl. For the multifamily sector, we’ve seen adaptive reuse applied to old schools, government buildings, warehouses, etc. because these structures are usually centrally located in many downtown areas.
Sponsored
USA-made Fire Rated Glass Helps UC Merced Achieve Triple Zero Sustainability

USA-made Fire Rated Glass Helps UC Merced Achieve Triple Zero Sustainability

SAFTI FIRST

The Merced 2020 Project, an ambitious, $1.2B, extensive expansion of the UC Merced campus, is “the largest public-private partnership social infrastructure project completed in U.S. history,” according to the university’s website. This includes new facilities used for academic, administration, laboratories, housing and recreation. This was truly exciting, and it struck a chord with SAFTI FIRST® because Merced is home to our manufacturing facilities.
Sponsored
Enhancing the #TargetRun with Oversized Fire Resistive Butt-Glazed Glass Walls

Enhancing the #TargetRun with Oversized Fire Resistive Butt-Glazed Glass Walls

SAFTI FIRST

Who hasn’t uttered the words or at least heard of a “Target run”? What started out as a marketing campaign to get more foot traffic in their brick and mortar stores has become somewhat of a cultural phenomenon. Aside from being a call-to-action, #TargetRun is a trending hashtag used by shoppers to share their in-store shopping experience on social media.
Sponsored
Chicago Starbucks Reserve Turns Stair-Climbing Into Unforgettable Experience Using Fire Rated Glass

Chicago Starbucks Reserve Turns Stair-Climbing Into Unforgettable Experience Using Fire Rated Glass

SAFTI FIRST

The Starbucks Reserve Roastery in Chicago features an incredible, 4-story mural by local artist Eulojio Ortega. The mural, brilliant for conveying the story as visitors go from floor to floor, is interestingly located in an exit stairwell. Traditionally, stairwells are enclosed in opaque walls, leaving them dark, isolated, and rarely utilized unless in an emergency. To allow the mural to be visible through multiple floors, encourage stair usage and meet fire rated code requirements, the architects redesigned the 2- hour stairwell using transparent, floor-to-ceiling butt-glazed glass walls with the largest tested and listed fire resistive glass panels available.
Sponsored
Fire Rated Glass Contributes to Salt Lake City Public Safety Building’s Sustainable and Resilient Design Goals

Fire Rated Glass Contributes to Salt Lake City Public Safety Building’s Sustainable and Resilient Design Goals

SAFTI FIRST

The Salt Lake City Public Safety Building in Utah is the first U.S. Public Safety Building to achieve both a net-zero rating and LEED Platinum status and designed to survive a 7.5 magnitude earthquake and remain fully functional afterwards. This ensures that the city’s emergency operations center can survive and help the city recover in the event of an earthquake or a similar disaster. Fire rated glass contributes to achieving sustainable design goals by maximizing daylight penetration deep within a building and shared artificial lighting between spaces. It also ensures that occupants can exit the building safely in the event of an earthquake, which can damage sprinkler systems and render them ineffective.
Sponsored
New 45 Minute Fire Rated Glass Makes Visual Connectivity Possible, Beautiful and Affordable at Campus Housing

New 45 Minute Fire Rated Glass Makes Visual Connectivity Possible, Beautiful and Affordable at Campus Housing

SAFTI FIRST

The design limitations of fire rated ceramic glass have finally given way to a revolutionary new product like SuperClear® 45-HS-LI, a truly clear 45 minute fire rated glass that meets all fire, safety and hose stream requirements at a fraction of the price of ceramics. See how the design team at EYP used SuperClear® 45-HS-LI to their advantage at the 1,197-bed Quad on the University of Houston campus.
Sponsored
Mountain Brook

Mountain Brook

NanaWall

Mountain Brook, AL
Sponsored
Fire Rated Glazing Gets Visitors ‘In the Spirit’ of Historic Bourbon Distillery

Fire Rated Glazing Gets Visitors ‘In the Spirit’ of Historic Bourbon Distillery

SAFTI FIRST

As America celebrated National Bourbon Day on June 14, downtown Louisville also celebrated the highly anticipated grand opening of the Old Forester Distillery. This event is also touted as a triumphant return of America’s first bottled bourbon in continuous production by the same family before, during, and after Prohibition to Whiskey Row. See how SAFTI FIRST®’s fire rated glass walls helped create an immersive visitor center with a fully operational distillery, cooperage and bottling line.
Sponsored
Fire Resistive Curtain Wall Helps Hospital Meet Fire and Seismic Requirements

Fire Resistive Curtain Wall Helps Hospital Meet Fire and Seismic Requirements

SAFTI FIRST

Ratcliff was chosen as the architect to design the new three-story, 60,000 square foot San Jose Downtown Health Center that includes urgent care for adults and children, primary care for pediatric, OB/GYN and family medicine, behavioral health services, laboratory, pharmacy and radiology departments. Their design takes advantage of glazing’s ability to draw natural light from the outdoors to create a warm, pleasing atmosphere that promotes healing. Part of the hospital’s exterior curtain wall had to be fire rated for one hour and meet seismic requirements per SB 1953 as well.
Sponsored
Fire Rated Curtain Wall Performance in Dramatic Weather Conditions

Fire Rated Curtain Wall Performance in Dramatic Weather Conditions

SAFTI FIRST

As far as extreme environments go, Wisconsin has some of the most dramatic in North America. During the winter months, temperatures regularly dip well below freezing, and in the summer months the temperatures can reach up to 90 degrees Fahrenheit with significant humidity levels for extended periods of time. Given these dramatic weather conditions, the materials chosen for the building envelope should not only protect building occupants from the elements, but ensure their comfort as well.
Sponsored
Utah Business School Features Dramatic Fire Rated Glass Wall

Utah Business School Features Dramatic Fire Rated Glass Wall

SAFTI FIRST

The David Eccles School of Business on the University of Utah campus features a 28- x 18-ft 2 hour interior glass wall with a 90 minute full-vision door in an exit enclosure/stairwell. The architects selected fire rated glass to meet fire rating requirements while providing maximum visibility and natural daylighting in the space. The project’s specifications also required the fire rated glass to have the same optical clarity as the adjacent non-rated glass systems.
Sponsored
Cincinnati Art Museum Renovation Features Transparent Stairwell

Cincinnati Art Museum Renovation Features Transparent Stairwell

SAFTI FIRST

When the Cincinnati Art Museum embarked on an $11 million renovation, the architects wanted the entrance and main stair to be as inviting as possible. Transparent, fire rated glazing from SAFTI FIRST® was a key component of the design solution. To maximize the vision area in door itself, SuperLite® II-XL 60 in GPX® Builders Series Temperature Rise full-lite doors. In some of the stairwell doors in less prominent locations, SAFTI FIRST® provided SuperLite® X-90 for the vision panels under 100 sq. inches.
Sponsored
Caspian Waterfront

Caspian Waterfront

FutureGlass

Scope of WorkProcess, deliver and install façade cone glazing for the dome.Build Up12mm FT HST Sunguard Neutral 50 + 16mm Black Warm Edge spacer + 88.4 Clear HSProject DetailsCaspian Waterfront is the reimagined building of the original government congress centre. In 2016, local developer Pasha Construction started transforming the building into a 120,000 sq. m. retail entertainment and leisure complex. Located on the shore of the Caspian Sea, the structure opens onto the waterfront on three sides.The retail centre’s unique structure posed a challenge. The building complex has geometric shapes similar to the Sydney Opera House, with shell roofs that reflect the surrounding water. The central flame tower has an eight-angled glass façade inspired by the country’s emblem, the eight-pointed star. Since the building would resemble a place of pride, we had to ensure that our panels surpassed every quality level. Due to the unique triangular shape of the glass panels extra care had to be taken during production, delivery and installation to prevent injury, breakage and damage.At Future Glass, we always prioritise quality. Our state-of-the-art processing facility enabled us to deliver the panels on time with minimal on-site rejections. Today, Caspian Waterfront has become a national symbol of Azerbaijan.
Sponsored
Fire Rated Glass Helps SFPUC Building Achieve LEED Platinum

Fire Rated Glass Helps SFPUC Building Achieve LEED Platinum

SAFTI FIRST

The new San Francisco Public Utilities Commission Headquarters combines maximum daylighting and fire safety with a multi-story, fire rated glass stairwell from SAFTI FIRST. Dubbed as the "greenest building in North America," this Class A LEED Platinum office building features a transparent, 2-hour fire rated stairwell, situated prominently near the main entrance. SAFTI FIRST supplied SuperLite II-XL 120 in GPX Architectural Series Wall Framing and SuperLite II-XL 90 in GPX Builders Series Temperature Rise Door starting from the lobby all the way to the topmost floor.
Sponsored
Passive Purple - Airtight White Edition

Passive Purple - Airtight White Edition

Intelligent Membranes Canada

A case study of the use of Airtight White Intelligent Airtight Liquid Vapor Control
Sponsored
Orpington - Self Build - Timber and Masonry

Orpington - Self Build - Timber and Masonry

Intelligent Membranes Canada

Renovation stripping out the building completely and rebuilding the walls, Passive Purple® was applied in between the connections of the internal side of the external walls which were a combination of masonry, timber, and steel frame. The ground floor ceiling was removed exposing the warped old timber joists with cracks in the surrounding brickwork and mortar. This was given attention to detail using Passive Purple® Brush to seal above an airtight foam to guarantee the airtightness of this major air leak zone before the final spray coat of Passive Purple® airtight membrane was applied. Passive Purple® was also used to seal window and door linings, ready for the new triple glazed windows to go in. Passive Purple® was sprayed on all the walls and ceiling. This is an ongoing project that still is awaiting an air test, the client is looking to hit 2.5 ach and installing MVHR.
Sponsored
CSSBI SSF 42-15:
Fastening Prepainted Sheet Steel Roofing and Siding

CSSBI SSF 42-15: Fastening Prepainted Sheet Steel Roofing and Siding

Trimet Building Products

Introduction Sheet steel roofing and siding (cladding) is available in a wide variety of profiles, colours and paint systems. The modern prepainted systems used on Canadian-made products will provide decades of beautiful performance before there are any visible signs of deterioration of the paint surface. However, an important component of the cladding system is the fastener used to attach it to the structure. This fastener is not simply a screw; it is part of the roof or wall assembly and should be expected to provide the same long-term performance. This performance is not simply the capacity to safely hold the cladding in place, but also to match the colour and durability of the paint system. The selection of the correct screw for the job is the first step in the creation of a cladding system that will provide long-term performance. The next step is the installation. Installing screws in sheet steel cladding is commonplace and can be done very efficiently. The tool manufacturers have developed a wide range of options for installing fasteners into any type of substrate. Selecting the most appropriate tool will help the installation process.
Sponsored
Care and Maintenance of Prefinished Sheet Steel
Building Products

Care and Maintenance of Prefinished Sheet Steel Building Products

Trimet Building Products

Introduction Prefinished sheet steel building products, such as wall and roof cladding, liner sheet, flashing, and associated items, have experienced an enviable growth record during the past twenty years or so. Coil coated prefinished sheet steel in a variety of colours and paint systems has greatly enhanced the appearance of thousands of industrial, commercial, institutional, recreational, residential and farm buildings, providing an economical, durable and attractive alternative to traditional materials. As with all materials, a little care and maintenance pays off handsomely in terms of longevity and repair costs. The recommendations which follow have been learned at first hand and represent the collective industry experience with thin-film paint systems applied to metallic coated sheet steel by the coil coating process. In this publication the term “thin-film paint system” refers to a modified silicone polyester or a fluorocarbon type having a coating thickness about 25µm. When the guidelines listed below have been observed, thin-film paint systems have been used successfully for all types of environments other than severe industrial atmospheres which require special consideration. The guidelines are not intended for barrier coatings, laminates, and new formulations which have different characteristics than the thin-film paint systems on which these guidelines are predicated. 
Sponsored
GPX® Framing with Sunshade Connectors at Doolittle BART Station

GPX® Framing with Sunshade Connectors at Doolittle BART Station

SAFTI FIRST

For BART's Doolittle Maintenance Facility at the new Oakland Airport connector, SAFTI FIRST® provided 60 minute, fire resistive wall openings in the exterior using SuperLite® II-XL 60 insulated with low-e glazing in GPX® Framing with a clear anodized finish. SAFTI FIRST® engineered a connection that allows the structural elements of the GPX® Architectural Series Framing System to support an integral sunshade system, instead of being hung in front of it. The Doolittle Bart Station is one of the first installations of the GPX® Architectural Series System with sunshade connections, which also include SLCC New Instruction and Administrative Building in Salt Lake City, UT.
Sponsored
Cost Considerations for
Prepainted Sheet Steel Cladding

Cost Considerations for Prepainted Sheet Steel Cladding

Trimet Building Products

This Fact Sheet has been written to describe some of the factors that affect the cost of prepainted sheet steel cladding products. The most significant factors are: colour, paint system, order quantity, Fabricator's inventory and profile selection. Recognition of the impact of these factors can help you select a prepainted sheet steel cladding system to fit the aesthetic and durability requirements of your project, and still stay within a budget. 
Sponsored
Fire Resistive Curtain Wall at NYC Midtown Community Court

Fire Resistive Curtain Wall at NYC Midtown Community Court

SAFTI FIRST

The 1890s-era Midtown Community Court in New York City—a New York Historic Landmark—is currently undergoing a five year, $18 million renovation that includes a 9,650-square-foot addition for a new elevator, lobby and stairwell featuring fire resistive glass and curtain wall. The system consists of SAFTI FIRST®’s SuperLite® II-XL 120 IGU in GPX® Curtain Wall System.
Sponsored
Rockwool and Passive Purple

Rockwool and Passive Purple

Intelligent Membranes Canada

Case study of Rockwool and Passive Purple together in a system and how together they are the perfect match for airtight buildings.
Sponsored
Skyline Lodge - Highlands, NC, USA.

Skyline Lodge - Highlands, NC, USA.

Mapei Inc.

MAPEI’s Mapeheat™ radiant floor-heating system adds an extra touch of luxury to a five-star lodge.
Sponsored
Passivhaus CPD Training Facility

Passivhaus CPD Training Facility

Intelligent Membranes Canada

We built the world first Passivhaus CPD training facility / pub, this is the worlds most airtight pub at 0.07ach at 50 pa. This is a twin wall timber frame, it’s 450mm wide insulation Huntsman which is made of thousands of recycled plastic bottles. Huntsman also recycled 1 billion plastic bottles from the sea last year. We have a 7.2 KW system solar panels system that powers the building, it’s got MVHR Nilan. On the external façade we applied Passive Purple External which is airtight up to 0.03ach.
Sponsored
Repainting Factory
Prefinished Metal Panels

Repainting Factory Prefinished Metal Panels

Trimet Building Products

Introduction Prefinished sheet steel is used on many building products from wall cladding, to architectural roofing to interior panels. Prefinished sheet steel has been used in Canada for over 30 years and there may be sites were the paint surface is in need of repainting. This bulletin is intended to give some guidance on repainting prefinished panels. Due to the diversity of factory applied prefinished systems, and the diversity of potential field applied repaint systems, it is impossible to offer one comprehensive repaint procedure for all possible situations. However, it is possible to offer a set of guidelines to be considered in every potential situation.
Sponsored
CSSBI SSF 21-06:
Low Sloped Steel Roofing - The Winners in Life Cycle Cost Analysis

CSSBI SSF 21-06: Low Sloped Steel Roofing - The Winners in Life Cycle Cost Analysis

Trimet Building Products

An independent assessment of the life cycle cost for various low slope roof systems revealed that steel roofing had the longest life span, no leaks due to material failures, and the lowest overall maintenance cost.
Sponsored
CSSBI S8-2018:
Quality and Performance Specification for Prefinished Sheet Steel Used for Building Products

CSSBI S8-2018: Quality and Performance Specification for Prefinished Sheet Steel Used for Building Products

Trimet Building Products

1. SCOPE 1.1 The following specifications shall apply to hot-dipped metallic-coated sheet steel prefinished with colours of proven durability and suitable for exterior exposure as delivered from the coil coater. Proven paint systems for building products have been designed for vertical applications whose surfaces are no more than 30° to the vertical and non-vertical applications whose surfaces ranging from 5° up to 60° to the horizontal. It is not recommended for aggressive atmospheric exposure. 1.2 The prefinish system shall consist of a primer and topcoat continuously applied and cured within the paint manufacturer’s specifications on cleaned, pretreated, metallic-coated substrate. The pretreatment specified shall be zinc phosphate for galvanized steel and metal oxide pretreatment for aluminum-zinc alloy-coated steel, applied in accordance with the pretreatment manufacturer’s specifications.
Sponsored
CSSBI SSF 18-10:
Sheet Steel Products and Pressure Treated Wood

CSSBI SSF 18-10: Sheet Steel Products and Pressure Treated Wood

Trimet Building Products

IntroductionSheet Steel Roong and SidingLightweight Steel FramingIsolate the Steel and Wood ComponentsAvoid Use of Pressure Treated WoodFastenersMany buildings will include wood members in applicationssuch as sill plates, splash boards, strapping, purlins, door orwindow bucks, and posts. In some of these end-uses it is arequirement that the wood be chemically treated (pressuretreated) to extend the service life.Designers and builders need to be aware that changes in theavailable wood perservatives may impact the durability ofany connected steel components or fasteners.Eective January 1, 2004 the Environmental ProtectionAgency (EPA) banned the use of Chromated CopperArsenate (CCA) as a preservative in treated lumber forresidential construction. This was done in an eort to reducethe use of chromate and arsenic thereby mitigating thepotential health and environmental problems. The woodpreservative industry has been switching to alternativewaterborne compounds including Sodium Borate (SBX),Alkaline Copper Quat (ACQ), Copper Azole (CBA-A and CA-B),and Ammoniacal Copper Zinc Arsenate (ACZA).Unfortunately, research has indicated that ACQ, CBA-A, CA-Band ACZA, the new generation copper-based products, aremore corrosive to galvanized steel than the former CCA.Since ACQ is becoming the predominant preservative in use,the discussions in this paper will refer to it exclusively.The purpose of this Fact Sheet is to convey the recommendations of the sheet steel industry for the application of steelproducts with ACQ pressure treated wood.
Sponsored
Real Steel Cost Advantages – Consider. Choose. Challenge.

Real Steel Cost Advantages – Consider. Choose. Challenge.

Trimet Building Products

Start at the foundation where the loads imposed by a steel frame are up to 50% less than those of a concrete alternative. There is evidence in the field and through third-party case studies and comparative cost studies that steel building systems offer significant cost benefits over competitive building materials when the total cost of construction is considered.
Sponsored
San Diego Highrise Uses Fire Rated Glass on South Facade

San Diego Highrise Uses Fire Rated Glass on South Facade

SAFTI FIRST

Because the Sapphire Towers' south facing elevation was in close proximity to the adjacent property, code regulations required the south façade to either be solid, which was contrary to the design, or to have openings with a minimum fire protection of 45 minutes. SAFTI FIRST® engineered a system that met the uniform design demands and performance requirements for the windows and balconies in all 32 floors in the south-facing elevation.
Sponsored
Lofts du Village Mapeheat Installation – Chelsea, QC, Canada

Lofts du Village Mapeheat Installation – Chelsea, QC, Canada

Mapei Inc.

When the people of Canada’s capital region seek relief from city life, they often retreat to the serene, natural beauty found in Quebec’s Gatineau hills. Here, where temperatures can drop to -38°F (-39°C) and snow falls seven months out of the year, heated flooring is a practical luxury. To help recreate a Scandinavian-style getaway for the Groupe Nordik Lofts du Village project, specifiers chose one of MAPEI’s Mapeheat floor-heating systems.
Sponsored
Fire Rated Glazing Adds Visual Appeal to Parking Garages

Fire Rated Glazing Adds Visual Appeal to Parking Garages

SAFTI FIRST

Codes required fire wall separations between parking garages and businesses, markets, homes and other uses. Architects can replace entire walls with glass to open up buildings like never before. For example, SuperLite® II-XL in GPX® Architectural Series Framing by SAFTI FIRST® is a USA-made fire resistive transparent wall system that blocks radiant heat and meets the same stringent ASTM E-119/ UL 263/ NFPA 251 code requirements that any opaque fire rated wall must meet.
Sponsored
LEEDv4 and STEEL

LEEDv4 and STEEL

Trimet Building Products

Designers and builders have long recognized steel for its strength, durability and functionality. An important aspect of steel’s story is its high recycled content and end-of-life recovery rate. Both attributes are recognized by the U.S. Green Building Council’s (USGBC) green building rating system, Leadership in Energy and Environmental Design (LEED), but steel construction products can contribute to many other LEED credits as well, either directly or indirectly. USGBC’s latest version, LEEDv4, includes a completely revised and expanded Materials and Resources section, with new credits in the areas of life-cycle assessment (LCA), environmental product declarations (EPDs), and overall product transparency

Showing 1-36 of 39

Feedback