NBS Source
I'm a manufacturer

"xổ số miền trung thứ năm tuần trước【URL:zenfonemax.com】💯nhywj.html"

105 results found

Sort by:

Showing 1-36 of 45

Sponsored
Deakin Uni LC Building

Deakin Uni LC Building

RBA Group

The Deakin Uni LC Building features the following RBA products:RBA2733-032 – Compact Water Cooler Stainless Steel ShroudRBA2732-001 – Push Button Bottle Filler Stainless SteelDeakin University holds multiple campuses across multiple Melbourne suburbs. The University houses four main faculties, arts & education, business & law, health, and science, engineering & built environment. Deakin Uni is also renowned for its world-leading online tertiary education program, innovating modern education. Located to the west of the heart of Melbourne, the Burwood Campus holds the newly-unveiled LC Building, designed in an innovative way, holding multiple levels of formal and informal learning areas, health and wellbeing services and a premium staff working space for the Law School. The building aims for sustainability, sporting solar panels, native flora in its Wellness Garden and indoor greenery. The contemporary “green” design had to include RBA, as we share the same goal of sustainability. Furthermore, by providing to the ever-innovative Deakin University, we are improving the learning experience of the education sector.Pictured below, RBA’s ‘Compact’ Water Cooler, or the RBA2733-032, flows 30L of water per hour. RBA categorises the unit as ‘heavy duty’, meaning it maintains to be strong and long-lasting. Made of Stainless Steel with a Satin Finish, it has an Anti-microbial flexible bubbler with self-closing push button and non-squirt features (stainless steel bubbler options available upon request). Included is an integral perforated drain for hygiene & ease of cleaning. The Water Cooler exhibits a smooth radiused design that eliminates sharp corners thus minimising catch. All pipework is concealed within the Stainless Steel Shroud and contains the option of a Bottle Filler.Deakin University LC Building decided to pair the Water Cooler with a Push Button Bottle Filler, or the RBA2732-001. Users hold their bottle in the recess provided and press the button to activate the flow of water. Flow stops upon releasing the button. Spillage is directed onto the deck of the Water Cooler mounted underneath. Thus, students have a sustainable alternative for hydrating.
Sponsored
Supercar, Super Finish - Porsche Showroom Germany

Supercar, Super Finish - Porsche Showroom Germany

Hempel

Supercar, Super FinishThe new Porsche dealership in central Hamburg provides customers with the high-level comfort, convenience and safety associated with the brand. A striking new complex is being erected in Hamburg city centre, which includes the Porsche Center Hamburg Alstergate, due to open this spring. Hamburg is a leading Porsche stronghold, reputed to have the highest density of Porsche owners in the world, with a 0.8% quota of the city’s car population and nearly 1,000 vehicles a year sold regionally since 2014. Covering almost 8,000m2 of land, the Alstergate plot has over 200 parking spaces, including an underground car park with valet parking service. Attending to the growing Porsche model range, the building will have four new charging points for electric and hybrid vehicles and will be one of the few German competence centres for the 918 Spyder supercar and Carrera GT. Along with the new building, Porsche’s workforce in the region is set to grow to 115 employees.Such a prominent Porsche dealership in northern Germany’s foremost metropolis demands extraordinary standards from the construction and décor contractors entrusted with the project. Applicators Strahl, Reinigungs & Anstrichtechnik of Kiel, with whom Hempel already has long-standing commercial relations, were required to produce the extra smooth surface finishes sought by thedesigners. Furthermore, public safety is an inherent factor that has to be considered in all aspects of construction, so applicators chose to apply Hempacore One as the intermediate coat on ready-primed steelworks, prior to finishing with a topcoat of our Hempathane 87481 enamel.Both Hempacore One 43600 and its fast-drying 43601 version provide up to 120 minutes retardation in the event of fire, a factor of great importance in buildings designed for public access. Significantly on this occasion, Hempacore One does not just offer excellent passive fire protection but also certain additional features of great value to designers and applicators alike. The fact that its full fire retardant properties can be achieved with much lowerlayer thicknesses makes for speedier work and also more natural aesthetics on visible steelwork. Lower layer thickness naturally means less paint consumption, thus allowing project managers to make significant savings.Porsche’s new state-of-the-art centre in Hamburg underlines the company’s values of Tradition & Innovation; Performance & Practicality; Design & Functionality; and Exclusiveness & Social Acceptance and the professional application of Hempel coatings help to uphold and enhance those same values.
Sponsored
Silkstone State School Parking Bays

Silkstone State School Parking Bays

Atlantis

APPLICATION: 52mm Drainage Cell.PROJECT LOCATION: Silkstone Qld.PROJECT DETAILS: Parking Bays at the Silkstone Primary School.PROJECT COMPLETION: Sep 2013.Atlantis system saves big old tree.At Silkstone State school Qld. a contentious issue arose. The school required car parking and a sealed one at that. But, in the proposed car park was a huge old tree. The tree could be cut down and the roots dug out or the tree couldbe left, with open soil above the root system to allow for infiltration to keep the tree healthy; but this would lose atleast six car spaces. What was to be done?The answer turned out to be simple – keep the tree, but surround the tree with Atlantis® Gravel Cell™ 52mm cells.Hence while the rest of the car park was sealed, the areaaround the tree was prepared and the 52mm cells werelaid and clipped together there and filled with 10mmgravel. This area was of sufficient size to provide 3 carplaces on each side of the tree and a driveway in frontof the tree, while at the same time allowing rainfall toinfiltrate through the gravel into the root system.Thus we had a win-win situation. Not only was the treesaved, and money saved on not having to remove it, butthe root system of the tree was protected by the GravelCell™ system, and six extra car spaces were created.
Sponsored
Saving Energy in Style

Saving Energy in Style

Alspec

We all know we need to embrace more energy-efficient products in our homes and fortunately they are no longer so unattractive.
Sponsored
Preserving a World Heritage Site

Preserving a World Heritage Site

Atlantis

APPLICATION: Road CellPROJECT LOCATION: Chan Chan PeruPROJECT DETAILS: Protecting Walkways and Preventing erosionPROJECT COMPLETION: Sep 2016Chan Chan, the largest City of the pre-Columbian era in South America is now an archaeological site in La Libertad Region, 5 kilometres west of Trujillo Peru. Chan Chan is located in the mouth of the Moche Valley and was the capital of the historical empire of the Chimor from 900 to1470, when they were defeated and incorporated into the Inca Empire. The city Chan Chan spanned 20km2 and had a dense urban centre of 6 km2.The increasing popularity of the site forced the authorities to consider how to protect the walkways and to provide drainage, to remove rain water from the site to prevent erosion. The solution was to use the Atlantis® Road CellTM 53mm drainage cell. This installation made Chan Chan the second World Heritage site in all of Peru to have a highly technical system of protection of the original pavement installed and it covered almost the entire tourist circuit with the exception of the funeral zone.A layer of water proof membrane was laid down on the walkway and the the Atlantis® Road CellTM 53mm drainage cells were clipped together on the water proof membrane and filled with gravel. Thus providing protection for the walkway and also providing a drain for directing rain water away from the archaeological site to ameliorate erosion. Also it facilitated the access of visitors, especially those with disabilities, by providing a firm stable walk way.In all 1,700 m2 of the Atlantis® Road CellTM 53mm drainage cell were laid, and filled with gravel.
Sponsored
Polaris Data Centre

Polaris Data Centre

Construction Specialties

To protect the priceless infrastructure and mission-critical IT information in Australia’s first custom built, high-tech data centre, Polaris, Project Manager Thiess turned to the leading manufacturer of specialist building products, Construction Specialties.Integral to the $121 million construction was the regulation of airflow to safeguard the computer hardware; Construction Specialties’ customised performance louvres were the only product in Australia able to meet this construction challenge.Boasting 14,000m2 of floor space on 5 storeys with 7000m2 of raised floor over three data centre levels, the project, based in Springfield, Queensland, is the largest of its kind in Australia and will be Queensland’s only Tier 3+ data collection point.So important were the Construction Specialties performance louvres to the development, much of the building design was driven by the positioning, material specifications and design of the louvres.Lawrence Issa, Project Manager for Construction Specialties, and project partners Darryl Wright and Steve Emery of Project Sales worked closely with the Polaris construction team from project inception to completion to devise the most effective weatherproofing and airflow option for the building which also matched the intended aesthetic.“In-depth collaboration with the Polaris team led to the selection of our Architectural Line Louvres, of which two types were used – our RS7305a and LSM louvre models,” Lawrence said. “Unlike other louvres on the market, this range prevents up to 99% water penetration and maximises airflow, while also complementing the building facade as the horizontal louvre frames selected are hidden from view.“Our performance louvres cover 345m2 of the exterior building and are specifically customised in terms of size, shape and colour for the data centre,” Lawrence said.Miguel Thievent, Senior Project Engineer at Thiess, remarks that the CS Louvres perform to the highest standard, which was essential in meeting the building specifications.“It was vital we didn’t compromise on weather proofing and airflow,” Miguel said. “For example, we have six generators integral to maintaining the whole IT system in case of power failure which would not run if the airflow was affected or they were damaged by rain.“The Construction Specialties performance louvres were the only ones on the market that could guarantee damage would not occur as a result of bad weather conditions,” Miguel said.Construction Specialties’ performance louvres are at the leading edge of louvre design and are tested under real world conditions to meet the maximum standards demanded.Construction Specialties offers a broad selection of louvres under 3 main categories:Storm Resistant/Performance Louvres – The main objective of Performance Louvres is to allow the passage of air, whilst providing the area beyond the room with protection from rain penetration.Standard Louvres – A standard louvre will provide the maxiumum airflow required, but with minimal rain defence.Screening Louvres – Screening louvres, are low cost solutions that hide plant or other equipment from view.CS Louvre systems are available in a comprehensive range of finishes and colours, ensuring there is a Construction Specialties Louvre system to suit most aesthetic and performance needs.Louvre panels are factory assembled in a controlled and quality assured environment and provided to site in a fully finished modular form; thus, allowing for trouble-free and fast installation.A comprehensive range of accessories including insect/bird mesh and blanking panels in various materials and finishes is available to complete the application.
Sponsored
The Venetian, Macau

The Venetian, Macau

Rondo Building Services Pty Ltd

The casino is the largest in the world with 3,400 slot machines, 800 gambling tables and a 15,000 seated arena for entertainment/sports events. The Venetian Macau is so large that 90 Boeing 747 jumbo jets could fit into it.
Sponsored
105 Mitchell St, NT

105 Mitchell St, NT

Rondo Building Services Pty Ltd

Rondo has played a major role in the nearly 5,000m2 ‘105 on Mitchell Street’ hotel redevelopment. Rondo has so far provided about 8,000m2 of KEY-LOCK Concealed Suspended Ceiling System and 76mm Steel Stud Drywall Framing to this project.
Sponsored
Permeable Car & Trailer Park

Permeable Car & Trailer Park

Atlantis

Snapper Creek Car Park was developed as an environmentally friendly permeable car park. As such the Atlantis® Turf CellTM and Atlantis® Gravel CellTM systems were chosen, to provide gravel driveways and grass parking areas, thus preventing compaction of the soil and to protect the grass and to stabilize the gravel and provide a permeable car park.The parking areas were divided into car only parking and car & trailer parking.The area, consisting of natural sandy material, was excavated to a depth of 300mm, and a tensar grid was placed into the excavation and the excavated material placed back on top of the tensar grid and compacted.A layer of 100mm of gravel was then place on the areas where the Atlantis® Gravel CellTM modules were to be used and the Atlantis® Gravel cellTM modules positioned thereon and filled with gravel.The Atlantis® Turf CellTM modules were installed and filled with soil and then the area was grass seeded; no turf was used. The project was completed in mid 2014 and was at that stage semi grassed and in use.The project required 4,300sq. m of Atlantis® 52mm drainage cell, which are 480mm x 260mm x 52mm panels and have a rigid interlocking clipping system and are made from recycled polypropylene.In August 2017, the operators of the car park, which is still operating, were contacted and they stated that they were extremely happy with the condition of the car park, even though it has heavy traffic as there is a boat ramp there, and some areas have been flooded by Snapper Creek.The Atlantis® Turf CellTM & Atlantis® Gravel CellTM systems are specifically suited for car parks, access roads, aircraft taxiways and helicopter landing pads as it has the following features:a high load bearing of approximately 4000t/sq. M;protects the root system from compaction, while allow for vigorous horizontal and vertical root growth;permits surface water absorption and infiltration; andhave a long use life.
Sponsored
Robertson Home Spears the Sky, SA

Robertson Home Spears the Sky, SA

Alspec

Being in the southern area of SA the winters are cold so thermal double glazing was also a must. Being perched up high in the valley with the high wind speeds the product performance was a priority along with minimal maintenance from the elements that the home is exposed to, that is why the Alspec Commercial products were chosen.
Sponsored
Townsville Hospital, QLD

Townsville Hospital, QLD

Rondo Building Services Pty Ltd

Rondo has so far provided over 10,000lm of various wall and ceiling systems, including Rondo Steel Stud Drywall Framing System, KEY-LOCK Suspended Ceiling System and DUO Exposed Grid Ceiling System. More complicated designs arose when it was discovered that the high cyclonic winds would affect the facade of the building.
Sponsored
The Grand Hôtel-Dieu, France

The Grand Hôtel-Dieu, France

Guardian Glass (Australia)

Didier Repellin, from the architectural firm RL & Associés, oversaw the project. As honorary Chief Architect of Historical Monuments and a member of the French Heritage Society (among other titles), he was the perfect choice for the renovation of the buildings and the grounds. His vision was to make use of the history of the city to embellish the ancient buildings and has done so by respecting the history of the Hôtel-Dieu while giving back the grounds to the inhabitants of Lyon.
Sponsored
Large Family Home Maximising Beach-Side Views & Ventilation, QLD

Large Family Home Maximising Beach-Side Views & Ventilation, QLD

Breezway Australia Pty Ltd

Designed by Tempus Design Studio, this project was the winner of the BDAQ Regional Design Awards 2019 – New Houses $750,001 – $1,000,000 Construction Cost. Breezway Louvre Windows are incorporated into the bedrooms, kitchen and alfresco area to offer a number of benefits to the homeowners including fresh air and wide open views out onto the natural surroundings. When closed, they offer protection from the elements so outdoor time can be enjoyed without the worry of the weather changing.
Sponsored
Federation Square, VIC

Federation Square, VIC

Dyson (Australia)

When Fed Square was first opened in 2002 the original design expected 4 million visitors per annum. Fed Square now has 10 million visitors per annum and so have undergone an upgrade project of their main public amenities in St Paul's Court. Dyson Airblade Tap hand dryers have been implemented on this project to minimize the mess from paper waste and efforts involved with re-stocking of paper towers.
Sponsored
IronAsh and recycled brick, a match made in heaven.

IronAsh and recycled brick, a match made in heaven.

Australian Sustainable Hardwoods

“Having considered both performance and materiality factors, The Winton was designed with a green conscience. Reclaimed bricks provided such an interesting personality to the build, so it was important that the soft character of a natural timber species delivered the contrasting features” - Orbis Construction. Due to Victorian ash’s natural blonde tones, IronAsh has the flexibility to grey off or to be stained to meet any design needs. IronAsh is the combination of GoodWood Victorian ash and unique water-based additives to give a H3 treated exterior timber.
Sponsored
Versatile 52mm Drainage Cell

Versatile 52mm Drainage Cell

Atlantis

The 52mm drainage cell has been used as normally in two guises. Firstly as a TurfcellTM grass reinforcement such as at Natural Designer Homes , a display home in Casuarina NSW. The photograph of the driveway is from about 1year ago, some 4 years from installation. As there are several cars in the family as well as work trucks the installation looks quite good.Secondly as a Gravel cellTM gravel retainer, such as that used at Leaf and Limb Nursery in Kin Kin Qld., where they use the 52mm cell in the walkways as this makes it easier for them to run the trolley through the gravel.However there is a third use for the 52mm drainage cell. That is as walk ways in mining camps. Traymark Industrial Caravans make the vans for accommodation for the workers and Atlantis® 52mm cells are supplied with each van to be used as a walk way to keep workers out of the mud and dirt when at their accommodation..Secondly as a Gravel cellTM gravel retainer, such as that used at Leaf and Limb Nursery in Kin Kin Qld., where they use the 52mm cell in the walkways as this makes it easier for them to run the trolley through the gravel.Now for another use: a client already was successfully using our 52mm drainage cell as reinforcement for parking bays beside a river and in August 2011, it occurred to him that he could extend the parking area into a boat ramp. Our 52mm drainage cell is made from recycled polypropylene with U. V. protection, in sheets being 480mm x 260mm x 52mm.Two tracks, being 0.96m in width were connected to the 52mm drainage cell in the parking area and also were secured by metal hook pegs to the drainage cell of the parking area. The tracks lead to a full width ramp (2.88m in width) into the water.To prevent the ramp from sinking fully into the silt, the ramp and adjacent section of the two tracks are formed by two layers of 52mm drainage cell connected to each other by cable ties. Metal hook pegs were also used to assist in holding the ramp in position.We contacted our client in August 2017 and he is very happy with the boat ramp which is still in use despite several floods, and constant exposure to the elements.Thus the high load bearing of approximately 4000t/sq. M and the long useful life of the 52mm drainage cell has permitted the 52mm drainage cell to be used and still being used in many ways.
Sponsored
Robust passive fire protection for major ice hockey stadium - Jordal Amfi Stadium Norway

Robust passive fire protection for major ice hockey stadium - Jordal Amfi Stadium Norway

Hempel

At the new 6,000-seater Jordal Amfi ice hockey stadium in Oslo, Norway, player and spectator safety is a top priority. The stadium owner wanted a coating system which included passive fire protection, so, when Danish-based Give Steel was contracted to produce the steel structures, they had to not only meet the customer specification for fire protection but also consider the logistics of the project.The steel pieces were produced in Denmark, and Give Steel needed a coating system that was robust enough to protect the steel during transportation and erection onsite.
Sponsored
ANZAC Memorial, Hyde Park

ANZAC Memorial, Hyde Park

ECOCLEAN

COLLABORATIONArchitects: Johnson Pilton Walker (JPW) and the Government Architect’s Office.Builder: Built.BRIEFThe project required a coating that would preserve and protect the feature precast concrete ceiling, beams, walls, and eyelet as part of the Anzac Memorial Centenary Project.MATERIAL & APPLICATIONECOCLEAN Porosity SealerECOCLEAN Self-Cleaning CoatingOUTCOMEA stunningly sustainable multi-award-winning project that includes the prestigious Sulman Medal. Our team is so proud to have played a part in the preservation of one of Sydney’s most iconic monuments, a symbol of our history and our future.
Sponsored
Sea Temple Apartments

Sea Temple Apartments

Tremco

About the ProjectSea Temple is unrivalled as THE 5-star resort in Port Douglas. The beautifully manicured grounds, stylish accommodation, world class facilities and spectacular 3000m2 central swimming lagoon, places Sea Temple in another league when compared with other resorts in the region. Sea Temple Luxury Apartments is a collection of 6 stunning 2 and 3 bedroom Swim-out and Penthouse apartments within the Pullman Sea Temple resort complex. The apartments have been selected for their ideal positions within the resort, relaxed atmosphere and unparralled quality facilities set the scene for pure enjoyment.The ChallengeWhen you are working with one of the most prestigious resorts in Port Douglas where the highest quality of facilities, services and experiences are expected, you need to provide unparalled results. Also when your guests are paying a premium price, your solution needs to be low odour so as to not disrupt the experience of paying guests whilst the work is being completed. The harsh North Queensland conditions demand a high quality product strong enough to withstand all types of weathering. So when Sea Temple Apartments discovered a problem with their waterproofing a high quality but aesthetically pleasing solution was the only option.Tremco SolutionWith the contractor previously using liquid membranes, a more robust and durable solution was needed which would also provide the warranty, demanded of a high quality building such as Sea Temple.Having previously completed many other successful projects with Tremco Systems, the applicator had trust in the Tremco solution, and a dual layer of Tremproof Torch 3000 seemed the logical choice for this end high development. The low VOC and odour levels of Tremproof Torch 3000 helped seal the deal in the built up 5 star accommodation to reduce neighbourhood discomfort.
Sponsored
Functional Coatings - Anzac Memorial

Functional Coatings - Anzac Memorial

ECOTONE

CollaborationArchitects: Johnson Pilton Walker (JPW) and the Government Architect’s Office.Builder: Built.Material & ApplicationFunctional Coatings were applied to precast concrete elements to protect the memorial from carbonation in addition to giving the surface self-cleaning and air-purification propertiesOutcomeA stunningly sustainable multi-award winning project that includes the prestigious Sulman Medal. Our team is so proud to have played a part in the preservation of one of Sydney’s most iconic monuments, a symbol of our history and our future.TestimonialThe Anzac Centenary Project not only realises the vision from our past, it will continue to remind future generations of the contributions made by our servicemen and women.The Right Hon. Clover Moore, Lord Mayor of Sydney
Sponsored
Springvale Rise Primary School

Springvale Rise Primary School

Adventure+

Springvale Rise Primary School engaged adventure+ to redevelop two of the school’s playgrounds. Utilising funds provided from a government election promise enabled the school to provide the best for their students. The scope included designing and installing two spectrum+ combination units and one large pinnacle+ rope climbing structure in the areas. As part of the package, adventure+ supplied and installed shade sails and undersurfacing in both play areas. Careful selection of colours ensured the playgrounds both matched with the surrounding environment and newly constructed buildings and gave an inviting and engaging atmosphere for the students. The pinnacle+ rope structure has been so successful for the school that they have to roster turns for the children! Providing the entire playground package ensured the playground redevelopment experience was as smooth as possible for the school.
Sponsored
Shrine of Remembrance

Shrine of Remembrance

Interpon Powder Coatings

A significant Melbourne landmark, Victoria’s Shrine of Remembrance has undergone a major redevelopment by local firm ARM Architecture. Completed in late 2014, the redesign accommodates new requirements of the memorial that have evolved in recent years, while respecting the original design by Hudson and Wardrop, thus ensuring the memorial’s use by future generations.  Built between 1928 and 1934 to honour those who served in the First World War, the Shrine was inspired by the tomb of King Mausolus, one of the seven wonders of the ancient world. In the late 1990s, the Shrine of Remembrance Trustees embarked on a bold plan for the site. Access to the upper levels of the Shrine was problematic, especially for veteran visitors, and public visitation was increasing as younger generations came to understand the legacy of their forebears. Accordingly, the Shrine’s collections were expanding with donations of artefacts from families and a growing need for education facilities and an improved visitor experience became evident.  In 2001, ARM Architecture were commissioned to develop a master plan to develop the Shrine. Following the original 1920s design, ARM proposed four symmetrical zig-zag shaped courtyards, allowing access to the undercroft spaces under the existing structure which now house gallery areas, an auditorium, dedicated education rooms, an archive and offices. Stage 1 of the project saw the Visitor Centre and two of the courtyards completed on the north side of the structure in 2003. Stage 2 expanded the undercroft with the addition of the Education Centre and Galleries of Remembrance, and the final two courtyards. ARM Design Architect Jeremy Stewart explains “It was important that each of the courtyards had a distinct feel”. The open air Student Entry Courtyard offers a separate entrance to the Shrine for school groups, with a large sculptural poppy, the flower of wartime remembrance, suspended overhead. With the colour red notorious for fading on external structures, Interpon Powder Coatings recommended a system that would be colourfast. In a high traffic space that closes for only two days each year, with the additional solemnity of the memorial environment, choosing a product that would last the distance and require minimal maintenance was essential to this project. Interpon’s D2015 Gold Global Warranty offers the Shrine Trustees this assurance. Working with Locker Group, HDM Metal, an experienced fabricator and Interpon Approved Applicators AAF Vic and Powdercoating Services ACT as exclusive warrantors provided further reassurance of the product quality.  The giant overheard poppy features Interpon D2015 Ultriva™ R15 Crimson Matt YG215A and its support structure Interpon D2015 Ultriva™ Ebony YN201A. On the south west diagonal, the Terrace Courtyard features a lush green referencing South East Asian inspired garden. Amidst the greenery, laser cut aluminium panels coated in Interpon D2015 Ultriva™ R14 Waratah Matt YG222A list the names of Victorian towns, providing a reference point for visitors. The zig-zag shape of the terrace courtyards infer irregular exposure to the sun, further emphasising the need for a product of premium quality. “Interpon are interested in and open to ideas”, says Stewart, making this a win-win collaboration for the architects of this redevelopment of Victoria’s premier place of remembrance.  
Sponsored
Crescent Head Surf life saving club

Crescent Head Surf life saving club

ECOCLEAN

COLLABORATIONArchitect: Neeson Murcutt ArchitectsDeveloper: Surf Life Saving NSWBRIEFNeeson Murcutt Architects needed a solution that would protect the glazed ceramic tile roof on the $2.2 million rebuild of the Old Kempsey-Crescent Head Surf Life Saving Club. They wanted to avoid grime and salt accumulation on the roof system with minimal maintenance from the volunteers and to reduce maintenance costs.The architect designed the outside surfaces so they would be durable in the marine environment and easy to maintain. With difficult access to the roof, the builders decided on ECOCLEAN to help with maintenance and cleaning of glazed ceramic roofingMATERIAL & APPLICATIONECOCLEAN Porosity SealerECOCLEAN Self-Cleaning CoatingOUTCOMEUsing the power of daylight, rainwater and dew, ECOCLEAN created a self-cleaning roof that continually breaks down algae, mould and organic matter, which can cause unsightly stains. The Crescent Head Surf Club went on to win three awards including the NSW Sulman Medal for Public Architecture.
Sponsored
Dexus Gateway Building, Sydney

Dexus Gateway Building, Sydney

Boon Edam Australia Pty Ltd

The Gateway building In Sydney’s Circular Quay is Australia’s first office tower to use fully integrated touchless 3D fingerprint scanning to allow authorised office workers and guests into the building. The building’s new entrance involves a complex integration of security and technology experts, including Boon Edam, Schindler Lifts, Honeywell and IDEMIA (the manufacturers of MorphoWave fingerprint scanning technology). The solution had to work seamlessly to enhance the user experience and building security for tenants and visitors at the 46-storey landmark building in Sydney’s CBD, owned by Dexus Wholesale Property Fund. Boon Edam delivered the entrance security solution, with Lifeline Speedlane Swing speed gates that are the slimmest in the market, which added to the aesthetics, and helped with design considerations within the width of the lift lobbies. Rising Demand by Tenants for Increased Protection The upgrade project required an entrance security system that incorporated sophisticated security yet kept an aesthetically pleasing and unobtrusive lobby. The ideal solution was found by integrating Boon Edam speed gates, MorphoWave fingerprint scanners mounted on a coordinating pedestal (the Lifeline Boost), Schindler Lift destination control and Honeywell access control technology. This was a response to increasing demands by building occupants to improve the entry security measures to better cater for the protection of employees, visitors and valuable data. A Complex, yet Perfect Orchestration Gateway’s access solution includes a bank of sleek and stylish security speed gates (Boon Edam’s Lifeline Speedlane Swing), which are seamlessly integrated with touchless and intelligent elevator destination control (Schindler Port’s PORT 4 mini) and security access via a biometric fingerprint scanning (IDEMIA’s MorphoWave) – all at one point, enabling quick, accurate and seamless entry to secured areas. These technologies are all controlled by Honeywell’s access control system. Mr Stephen Hodge, Senior Project Manager, Dexus added that “with so many stakeholders, and a strong need for reliability and quality, it was important that everyone knew the goals of the project and worked well together. I’m pleased to say that it was like a perfect jigsaw and everything came together smoothly.” “What was important to Dexus is that we were pushing the boundaries to create better experiences, but we’re only doing so with proven products. Boon Edam’s speed gates have been installed globally and locally, and this gave us added confidence that they were the right product for this forward-looking project,” he said.
Sponsored
Universal Store Driving Sustainability - Industrial market Segment

Universal Store Driving Sustainability - Industrial market Segment

HOLCIM (AUSTRALIA) PTY LTD

How does it work?ECOPact uses alternative materials to reduce the environmental footprint of the concrete mix.ECOPact alone reduces embodied carbon emissions by 30-60% without the use of offsetsSimilar technical qualities of conventional concreteECOPact zero goes one step further buy offsetting the residual emissions of ECOPact concrete to achieve 100 emissions reduction.The issueThe built environment is responsible for 39% of global energy-related emissions. Over a quarter of these emissions arise from running existing buildings, whilst 11% is attributable to the embodied emissions from the construction of new buildings. Did you know – concrete is the most widely used building material in the world? The production of concrete is highly energy intensive and generates significant emissions.Business GrowthAs we continue to grow and expand our store footprint nationally, in 2022 we are building a new home for Universal Store. Our objective is to accelerate our journey to a sustainable future, so we have made it a priority to integrate environmentally sustainable features in the design of this exciting new project. This also entails considering the climate impacts of this project. EcoPact - Zero ConcreteWe will need tons of concrete and other materials for the structure of our new Universal Store home. But the good news is that some pioneers are investing in research and development to deliver carbon neutral concrete.We are working closely with our construction partners - developer TradeCoast Central, and builder McNab to deliver a sustainable building. The Universal Store new purpose-built facility will make use of carbon neutral concrete supplied locally by Holcim. Their EcoPact concrete can be made carbon neutral by compensating for residual carbon emissions. In fact this product is so much better for the planet, it has just won the Best of the Best 2021 Sustainability Awards from Architecture and Design.We chose this product to achieve the following benefits:·Conserve natural resources - the product uses alternative materials (fly ash, blast furnace slag or silica fume) instead of virgin raw materials (mainly limestone and silica). ·Reduce the carbon footprint of the project - this product achieves a reduction of 30-100% of embodied emissions related to concrete usage in comparison to standard concrete. ·Use our influence and leadership to support the transition to a low carbon economy·Demonstrate that a sustainable future is within reach.
Sponsored
University of Utrecht

University of Utrecht

Boon Edam Australia Pty Ltd

With its glass walls, transparent façade and LED lighting, the Victor J. Koningsberger building, in the suburb of Uithof in Utrecht, cannot help but capture the eyes of all passers-by. The Viktor J. Koningsbergergebouw is dedicated to the faculties of Geosciences, Science and Medicine was designed by the renowned Rotterdam-based Ector Hoogstad Architects. This latest building addition to the University of Utrecht opted for a revolving door at their main entrance. The 3-winged Tourniket revolving door was custom-made and has been constructed almost entirely of glass. Director and project architect Joost Ector said, "The entrance had to be functional and recognisable, but also belong to the story of the building." The three central themes in the design of this iconic building are lightness, openness and transparency. All of these properties can be clearly seen in the building’s façade and play an important role at the main entrance. This bespoke revolving door towers at an impressive nine meters height. However, at this height issues such as rotating parts stand in the way, so a different solution needed to be chosen. Watch the video below to see which route architect Joost Ector selected and why.
Sponsored
Flower Power HQ

Flower Power HQ

ECOCLEAN

PROJECT NAMEFlower Power HQLOCATIONErskine Park, NSW – AUCOLLABORATIONFlower Power Head Office TeamBRIEFFlower Power is one of Australia’s leading garden centres. They wanted an earth-friendly and sustainable solution to keep the Flower Power head office as healthy and safe as possible for staff members.MATERIAL & APPLICATIONECOCLEAN Antiviral coating was applied to the interior office building and common touchpoints.OUTCOMEECOCLEAN is not only providing long-term protection from the spread of viruses but preventing the spread of bacteria, mould, and VOCs creating a safer and healthier workplace for the Flower Power team and staff members.TESTIMONYAt Flower Power, sustainability and safety have always been important to our garden centre business. So, when the ECOCLEAN team showed us how their clever coatings could help keep our workplace safe, it was a no-brainer for us to try them. Now more than ever we have a responsibility to keep our workplaces and each other safe.John Summit, CEO Flower Power
Sponsored
Columbia College, USA.

Columbia College, USA.

Boon Edam Australia Pty Ltd

The new Student Center at Columbia College Chicago, located at 754 South Wabash Avenue in Chicago, opened its doors in the fall of 2019. This brand-new building offers five spectacular stories of spaces for students including music and film-screening rooms, dining options, a fitness centre, a reflection room for meditation and prayer, and event spaces for meetings, performances, and receptions. Columbia College Chicago has a closed campus. In order to enter any building on campus students and staff must have a Columbia ID or visitors must have a valid appointment. The main entrance at the Student Centre is the Tourniket manual revolving door that leads to a public foyer that includes a coffee shop and lounge. Since the speed gates are just past the security desk at the boundary of this area, they serve as a visual and physical indicator of where the public area terminates. Next to the Speedlane Open speed gates, which are notable because they do not have any closing barriers, guards watch as people pass through them to ensure that everyone is scanning their IDs and that the IDs are valid, in which case the speed gate shows a green light. In a situation where a red light shows and the gate alarms, the guard will check the person’s credentials and can try to troubleshoot the ID card. “The decision was really about what creates the least barrier to those entering and exiting the building,” said Dutil. “We don't really want our students to feel like they are overly policed or that our buildings are not accessible to them. So the design of the Open speed gates provided the best solution in terms of controlling access without being obtrusive." Swift Passage While Maintaining Accountability Before the Student Center was built, students entering any campus building would just show their ID to the security officer as they walked past. The administration realised that while this does provide some level of security, it is not foolproof – particularly when many people are entering at the same time for a class. The College’s head of security made the suggestion to install a system that would allow for swift passage of authorised people while maintaining accountability around who enters and exits the building. As anticipated, there was a brief learning curve for the students using the new system. “This was the first system like this on our campus,” said Dutil. “And the first few days that the new Centre was open were also the first few days of school. There were a lot of people new to the campus who required a bit of coaching from guards and our student staff in terms of where to place your card, and to not walk through before you place your card.” Coming Out Ahead of Swinging Doors Dutil confirms that the access systems placed at Boon Edam speed gates are actually outperforming those placed at swing doors across the campus for convenience and adoption. Across the campus, there is a card reader at every swing door entrance of a building where you present your card and a light turns red or green. But oftentimes the card reader is missed, or depending on the placement of the lights and placement of the guard, it can be kind of hit or miss with students walking right by it. “But with the Open speed gates, they're very visible and although they're not a total barrier to entry, they are something that's right in front of you. Because it's very noticable and not easily overlooked, the students have learned pretty quickly to get their ID out. In fact, this was meant to be a test run for the campus to ensure it would be viable and worthwhile for other buildings as well.” Advanced Features Add Value and Flexibility The speed gates have delivered additional benefits beyond basic campus security, according to Dutil. “One of the nice things about a system like this is that we can count visitors to the Student Centre because we get the data of everybody that scans in. So on a busy day for us it's about 2500 people throughout the day. That can range depending on what's going on and what time of year it is. On weekends we're very slow, since there are no classes – maybe 900 to 1200.” “We are a rental venue as well, so we have times where the building is open to non-Columbia College Chicago people for events or other functions. There's a really convenient touch panel right at the security desk called the BoonTouch, where the officer can turn off the turnstiles during those times and then attendees can move through freely without any alarms going off at all.” A New Revolving Door Adds Comfort and Peace of Mind Finally, the Tourniket manual revolving door delivers one additional benefit to the Student Centre, located in a city known for harsh weather. “Revolving doors are always preferred at a building like this that gets a lot of traffic going in and out. We have cold, drafty weather that blows right into our main space at that first floor entry. The revolving door helps to keep the building warm and saves energy and utility costs as well,” said Dutil. “Students feel safe and comfortable entering the building at night,” he concludes. “Our building has a lot of nooks and crannies, and someone can end up alone in a space. And so I think knowing that the only people that are in that building are the ones that are supposed to be there is helpful. Overall, our students appreciate the effort to try to keep them safer.”
Sponsored
Mercedes-Benz Stadium

Mercedes-Benz Stadium

ASI JD MacDonald Pty Ltd

The new Mercedes-Benz Stadium in Atlanta, home of the Atlanta Falcons and Atlanta United, welcomed 75,000 fans to Super Bowl LIII in a beautifully designed and environmental friendly facility that is devoted to providing the ultimate fan experience. The HOK-designed $1.5 billion stadium opened in August 2017, an architectural icon in the city’s impressive downtown skyline.Amid its extensive post-game coverage of the Super Bowl, ESPN.com’s NFL page featured a story by ESPN Senior Writer David Fleming detailing an important and little discussed aspect of watching a game live…the quality of stadium restrooms.In his article, Fleming quoted Mercedes-Benz Stadium GM Scott Jenkins as saying,“You add a restaurant or a walkway feature to the stadium, some people will use it, but everyone is going to use the restroom. So the functionality, the quantity, the aesthetics of your bathrooms is critical. It seems unremarkable to most people, but, trust me, you invite 70,000 people to your house and you get the bathrooms wrong — you’ve got a huge problem”…”That Toilet seat, is now just as important as your Super Bowl seat.”
Sponsored
Hadspen Bull Run Reserve

Hadspen Bull Run Reserve

Adventure+

The Hadspen Bull Run Reserve playground is an excellent example of a community playground that suits everyone! Located within the Meander Valley Council in Tasmania, the park is a central hangout for the community in Hadspen. The vast range of equipment within the park is what makes this playground so special. There is something for all ages and interests, with a play unit, flying fox, multi-user rocker, wheelchair carousel, swings, single rocker, interactive panels, and a fitness station. While there is plenty for children, the fitness station also provides for the older demographic that may be minding the children on the playground, or doing their morning workout. Having the playground accessible was an important feature in the brief provided to adventure+. To reflect this, our design team included rubber paths for access through the playground, with access to low-level interactive panels and a wheelchair carousel. With our serious approach to play, we always aim to make our playground designs engaging and enjoyable. But, making the playground attractive is also essential. Selecting a modern colour scheme, as well as a play panel with an engraved bull image, makes the playground enticing, and ties the design to the name of the park.
Sponsored
Santiago Airport, Spain

Santiago Airport, Spain

SAS International Australia

A Tricell system was designed by SAS International to fit the "Y" shaped departure lounge at Santiago Airport. SAS International has designed, manufactured and installed metal ceiling solutions for both interior and exterior areas of the new 74,000m² terminal of the Aeropuerto de Santiago, Spain. SAS810 tricell has been installed to create a triangular aesthetic in the departure lounges. This open cell system provides a geometric form that can easily be repeated for a striking finish. The flexible approach in SAS International’s design process enabled this unique solution to fit within the ‘Y’ shaped designed departure lounge. Installed in the main terminal and baggage hall, as well as exterior ceiling areas, is the linear profile system SAS710. The linear slat ceiling, designed so that each slat lines up neatly with the next, forms a perfect row resulting in clean and simple architectural lines. SAS710 was also chosen for the exterior of the building to provide continuity of design. Using specially designed slat retaining angles, the system has been adapted for strength and durability to prevent slats from being dislodged in high wind.
Sponsored
Ivanhoe Apartments

Ivanhoe Apartments

Sculptform

Ivanhoe’s newest building is a landmark you can’t miss. The facade components of light bricks, dark cladding and luminous aluminium Click-on Battens perfectly complement each other, creating a contemporary finish. The interior also features our battens, which seamlessly connects to the exterior. The building comprises a three-level basement, ground floor retail outlets, two levels of offices and multiple fully appointed apartments among the two upper levels. The building is bordered on three sides by busy public roads which posed logistical challenges with its construction. However, the speed and ease of installing Click-on Battens alleviated this issue on the upper levels. The curved facade is wrapped in Sculptform aluminium Click-on Battens. They were installed upon standard and curved tracks which were delivered to site in a flexible state so that they’re able to be wrapped around the substrate and hug the exterior. Batten clips are factory fixed to the tracks at the spacing sequence that is specified. Helping to save time installing on-site. Battens are simply push-clicked onto mounting tracks that are positioned behind the battens in a concealed manner.
Sponsored
Arthur Cox, Dublin

Arthur Cox, Dublin

SAS International Australia

Ireland’s second largest legal firm, Arthur Cox, has moved to its new headquarters, Ten Earlsfort Terrace, Dublin. Located a stone’s throw from St. Stephen’s Green, the LEED Platinum fit-out building is a marker of sustainable design. Architects, Scott Talon Walker, had a specific design requirement in mind so chose SAS International for their longstanding relationship and expertise. To accommodate the number of recurring apertures, Scott Talon Walker collaborated with SAS to create bespoke service panels within the SAS330 hinged mega panel tartan grid. The panel design features five unperforated squares which create a single unit capable of housing fire detectors, movement sensors and other electrical devices. These unique panels satisfy the client’s M&E stipulations, ensuring the building’s sustainable performance well into the future. Additional SAS systems installed include: SAS500 acoustic lighting baffles and SAS150. Both of these systems assure complete design flexibility and service maintenance in equal measure. Nominated for Fit Out Project of the Year – Large Office, SAS International has once again exceeded the mark to deliver premium metal ceiling solutions for its client.
Sponsored
Qantas Headquarters, Mascot, Australia

Qantas Headquarters, Mascot, Australia

SAS International Australia

7000m² of SAS310 helped Qantas Airways overcome acoustic challenges, controling reverberation time and meeting a very high acoustic performance target. Qantas Airways Limited, nicknamed ‘The Flying Kangaroo’, is Australia’s largest airline. The new headquarters is the largest property project undertaken by Qantas Airways in the last 10 years. The project aims to rejuvenate the existing campus, consolidating and upgrading four existing office buildings and joining them together with an interconnecting hub. Selected areas of the existing building floorplate have been extended into the new atrium space creating balconies and office pods. These improved physical and visual connections aim to encourage interaction and engagement between workers. With a brief for high acoustic performance, SAS International were an obvious choice for Hassell architects, due to our vast portfolio of high acoustic rated metal ceiling tiles. SAS provided 7000m² of SAS310. The acoustic challenge was to control the reverberation time in a large volume space accommodating a PA system and a very high acoustic performance target. The reverberation time was significantly reduced with the addition of absorptive material and purposed designed acoustic ceiling panels. Qantas Headquarters was constructed with longevity in mind so the durability of the tiles was key, an advantage of using metal. The finish completely meets the performance demands, is extremely functional and cost effective, an A Grade corporate campus that incorporates the latest developments in sustainability and energy efficiency.
Sponsored
The Icon - St Kilda

The Icon - St Kilda

Interpon Powder Coatings

A bold and significant new development has emerged in St Kilda as a ‘liveable Lego tower’, rising in tiered rainbow cubes that appear to balance like building blocks. Aptly named The Icon, the distinctive new building is wrapped in expanded aluminium mesh that changes colour as sunlight moves.The inspiration of artist Matthew Johnson, who worked with Jackson Clements Burrows Architects to conceptualise the distinctive complex, was achieved with Interpon Powder Coating on board as a collaborative partner.“My vision for the project was for people look up and see something interesting, to see something that is in a sense iconographic – as a marker or reference point,” explains Matthew.Interpon were involved with the project “right from the start”, explains Gareth Connell, Regional Specification, Interpon. Their association began after they were introduced to Pace Developments to discuss colour and product selection for the external façade.“We work closely with Interpon, and Pace asked us to quote with the product already powder coated,” says Ian Dunstan, southern regional sales manager at Locker Group, who manufacture perforated and expanded metal. Interpon were able to step in and develop the colour range separately, to meet the design brief and provide an ultra-durable coating system that meet the expectations of all parties.“The team at Interpon were very accommodating, engaged and professional in taking the concept on board,” says Matthew. “We were able to manifest unique colours based on the ratios I created with their chemist, inventing a whole new series of colours. This was crucial, as each level is depicted in different colour hue variations from earth to sky, which cross reference the nature of the geographical and environmental stratums. This flux of seasonal change is portrayed through subtle tonal gradation. Working with Interpon was a very fluid operation.”Interpon has collaborated on several high profile property developments and high rises over the years – although perhaps none quite as unique or with as many distinct characteristics as The Icon. “The nature of expanded aluminium mesh is such that it is formed by shearing and expanding aluminium sheet to create the ‘3D form’ effect. A visually appealing system for a façade, the shearing of the metal can present issues with very sharp edges, particularly in aggressive coastal environments,” Gareth explains.“Part of understanding this project was to comprehend as many elements as possible. Given the location was in St Kilda, with the bay just over 1.5km away, environmental considerations such as UV degradation, exposure to corrosive sea salts and prevailing winds needed to be considered.”After reviewing available data, such as Bureau of Meteorology weather patterns and local geography and topography maps, a specific duplex or two-layer powder finishing system was specified.“This consisted of a controlled preparation process for the expanded aluminium sheets. An epoxy barrier primer (was specified) to provide enhanced protection and to build the sharp edges in order to minimise issues associated with filiform corrosion. And the ultra-durability polyester powder top coat was developed in 34 distinct colours,” Gareth says.After the colour range was developed, it was applied by powder coating specialists Mansutti Bros. Lead by managing director Claude Mansutti, the team refinished hundreds of mesh panels over a period of nine months.“It was a major benefit to be using powder coating because, unlike liquid paints, powder is cured once it comes out of the oven and it’s ready to go once it’s cooled down. If they were painted, the drying phase could delay the process from refinish to installation by up to two weeks. It meant we were able to keep to a very strict schedule,” Claude says.“The project involved a lot of large spreadsheet work. There were 17 floors and over 30 colours, with panels in 15 sizes; it was quite a matrix to work with. But the end result is so different and so unique. It’s an interesting design and I’m sure it’s going to be a talking point for the area for many years.”
Sponsored
Macquarie University Car Park Turf Cell

Macquarie University Car Park Turf Cell

Atlantis

APPLICATION: 52mm Turf CellPROJECT LOCATION: North Ryde NSWPROJECT DETAILS: Macquarie University Permeable Overflow Car ParkPROJECT COMPLETION: March 2017Established in 1964, Macquarie University began as a bold experiment in higher education. Built to break from traditions: to be distinctive, progressive, and to be transformational. Today its pioneering history continues to be a source of inspiration as they celebrate their place among the best and brightest minds.When Macquarie University’s existing cark park became too small for the amount of cars now using it, it was decided to construct an overflow car park. However, not just any car park, but in keeping with their innovative thinking, an environmentally friendly permeable car park. Of course the Atlantis® Turf CellTM system was chosen, so that turf covered parking spaces could be provided.The project required 9,843sq. m of Atlantis® Turf CellTM system, which is constructed from 480mm x 260mm x 52mm panels and has a rigid interlocking clipping system and is made from high quality recycled polypropylene. The project was undertaken by J & G Excavations and Asphalting (NSW) Pty Ltd.The Turf CellTM cells were laid on a bed of permeable soil, and filled with sandy soil and turf was then placed on top of the linked Atlantis® Turf CellTM cells and rolled with a heavy roller to press the roots into the soil in the cells, where they were protected from compaction and could grow freely both horizontally and vertically.The Turf CellTM system is another Atlantis invention, and is specifically suited for car parks, access roads, aircraft taxiways and helicopter landing pads as it has the following features:a high load bearing of approximately 4000t/sq. M;protects the root system of grass from compaction, while allow for vigorous horizontal and vertical root growth;permits surface water absorption and infiltration;has a long use life; andaesthetically, the system allows the grass to fill in completely, creating a lush lawn with an invisible reinforcement structure.

Showing 1-36 of 45

Feedback