NBS Source
I'm a manufacturer

"senior architectural systems ltd"

1,523 results found

Sort by:

Showing 37-72 of 304

Sponsored
Adagio Apartments, WA

Adagio Apartments, WA

Capral Aluminium

The term ‘adagio’ is an instruction to slow down and function at a leisurely pace, which makes it an appropriate name for the recently completed apartment complex. Designed by Hanssen Pty Ltd, minimalist design principles are apparent in the building’s sleek lines, as evidenced in the strong use of high-performance window systems, doors and balustrades; low-maintenance aluminium framing; and a simple linear design promoting an outward-looking connection to the environment. The affordability, strength, adaptability and quality of manufacture of the Capral Apartment Collection made it our ‘material of choice’ for the Adagio high-rise.
Sponsored
Australis Apartments, VIC

Australis Apartments, VIC

Rondo Building Services Pty Ltd

Working beside Doig Architecture, Rondo provided expert design and technical advice particularly with the high internal walls. Regular on-site inspections ensured products were installed to specification and delivered on time. Rondo Technical Sales Representative Tino Cucinotta said “The project benefited from our Technical Service team who were readily available to provide design advice when required”.
Sponsored
Westfield Chermside, QLD

Westfield Chermside, QLD

Rondo Building Services Pty Ltd

The curved suspended ceilings, that features wavy ‘skylights’ meant the Top Cross Rail component had to be made to a radius that met the architectural specification. This, in turn required the expertise of the Rondo Technical Services Team to ensure the wave, ‘skylight’ feature (using KEY-LOCK Concealed Suspended Ceiling components) would actually work. Not only that, the Rondo Team also had to adhere to strict deadlines to ensure the material could be supplied to the project on time.
Sponsored
Family Connections, VIC

Family Connections, VIC

Capral Aluminium

Steve Domoney Architecture took on the challenge of designing a home for clients with children. This project came with a clear vision of a spacious family home, contemporary in line and warm in tone. The dining room has Capral AGS windows opening at exterior ground level to a fernery, while high-level Capral AGS 419 Flushline Framing System beyond the kitchen provides views to distant trees in the south-east. The formal lounge opens to a generous decking and garden behind.
Sponsored
Cork County Council Office, Cork

Cork County Council Office, Cork

SAS International Australia

SAS International provided an unusual feature perforation to a metal ceiling solution for Cork County Council’s redevelopment of their MOT office. The refurbishment of Cork County Council has created an outstanding open plan office for their upgraded MOT Office. Included in the redevelopment is the installation of 240 meters squared of acoustic SAS500, with a unique OB50 perforation, installed within the open plan office, meeting rooms and cellular offices. Conserving the original architectural features was significant when embarking on the reconstruction of the building. SAS500 was chosen to accommodate the spacing of existing structural beams, the system hung on secondary grids to adhere to specific architectural requirements. To adhere to the recent popularity in open soffit trends, SAS500 offers a solution in addition to providing acoustic absorption. A unique OB50 perforation was specified in the design of the baffles for this project. SAS International worked in collaboration with Cork County Council Architects and CField Construction to provide bespoke design solutions for this project.
Sponsored
City West Police Complex, VIC

City West Police Complex, VIC

Rondo Building Services Pty Ltd

Melbourne’s CBD features a $230 million Victoria Police ‘super’ complex. Designed by Woods Bagot Architects, the 12 level, 27,000m2 project provided Rondo Victoria’s Charlie Khoury with the opportunity to work with their project team in the early design process to come up with solutions to meet their architectural requirements. Together with Rondo’s technical services engineers many solutions were found such as how to satisfy a requirement for the many free-standing walls to be constructed without using structural steel.
Sponsored
Bourke Street Contemporary Office & Living Space, NSW

Bourke Street Contemporary Office & Living Space, NSW

Breezway Australia Pty Ltd

Designed by Smart Design Studio, the building is an honest layering of old and new as expressed by the raw treatment of the exterior façade through to the smooth, modern interior. The rooftop addition connects the double-height banks of glass Breezway Louvres with an articulated aluminium roof folding down as a screen to the back of the building. The end result successfully incorporates flexible and functional office interiors and a two-bedroom rooftop apartment within a rigorously controlled contemporary architecture of old and new.
Sponsored
Minter Ellison, Sydney

Minter Ellison, Sydney

SAS International Australia

Minter Ellison's award-winning office specified SAS International ceilings as part of their overall workplace well-being strategy. Designed by BVN, the feature ceilings enhance the open floor design while minimising the use of materials. BVN challenged internal preconceptions of how major law firms present themselves to staff and clients alike. Deliberately shying away from a stiff, corporate feel, they specified SAS750 Tubeline in black. Their aim was to evoke a sleek and forward-thinking dynamism while maintaining a highly professional atmosphere. Elsewhere in the office areas SAS310 metal pan ceilings were specified with an unusually large perforation. This design feature creates a visually engaging ceiling which offers subtle system integration for sprinklers, down-lighters and other small services. Due to a tight project programme, micro-perforated SAS150 was specified knowing the tiles were readily available in the Sydney warehouse. The system satisfied acoustic absorption requirements too, achieving 0.95 NRC. Minter Ellison invested in not just a Grade A office redevelopment, but also their staff, improving motivation and retention. The reinvigorated space also communicates a clear sense of approach to visiting clients, underlining core brand values. Occupying the top 8 floors of the Governor Macquarie Tower, the project won the 'John Verge Award for Interior Architecture (NSW Architecture Awards) in 2016.
Sponsored
Polaris Data Centre

Polaris Data Centre

Construction Specialties

To protect the priceless infrastructure and mission-critical IT information in Australia’s first custom built, high-tech data centre, Polaris, Project Manager Thiess turned to the leading manufacturer of specialist building products, Construction Specialties.Integral to the $121 million construction was the regulation of airflow to safeguard the computer hardware; Construction Specialties’ customised performance louvres were the only product in Australia able to meet this construction challenge.Boasting 14,000m2 of floor space on 5 storeys with 7000m2 of raised floor over three data centre levels, the project, based in Springfield, Queensland, is the largest of its kind in Australia and will be Queensland’s only Tier 3+ data collection point.So important were the Construction Specialties performance louvres to the development, much of the building design was driven by the positioning, material specifications and design of the louvres.Lawrence Issa, Project Manager for Construction Specialties, and project partners Darryl Wright and Steve Emery of Project Sales worked closely with the Polaris construction team from project inception to completion to devise the most effective weatherproofing and airflow option for the building which also matched the intended aesthetic.“In-depth collaboration with the Polaris team led to the selection of our Architectural Line Louvres, of which two types were used – our RS7305a and LSM louvre models,” Lawrence said. “Unlike other louvres on the market, this range prevents up to 99% water penetration and maximises airflow, while also complementing the building facade as the horizontal louvre frames selected are hidden from view.“Our performance louvres cover 345m2 of the exterior building and are specifically customised in terms of size, shape and colour for the data centre,” Lawrence said.Miguel Thievent, Senior Project Engineer at Thiess, remarks that the CS Louvres perform to the highest standard, which was essential in meeting the building specifications.“It was vital we didn’t compromise on weather proofing and airflow,” Miguel said. “For example, we have six generators integral to maintaining the whole IT system in case of power failure which would not run if the airflow was affected or they were damaged by rain.“The Construction Specialties performance louvres were the only ones on the market that could guarantee damage would not occur as a result of bad weather conditions,” Miguel said.Construction Specialties’ performance louvres are at the leading edge of louvre design and are tested under real world conditions to meet the maximum standards demanded.Construction Specialties offers a broad selection of louvres under 3 main categories:Storm Resistant/Performance Louvres – The main objective of Performance Louvres is to allow the passage of air, whilst providing the area beyond the room with protection from rain penetration.Standard Louvres – A standard louvre will provide the maxiumum airflow required, but with minimal rain defence.Screening Louvres – Screening louvres, are low cost solutions that hide plant or other equipment from view.CS Louvre systems are available in a comprehensive range of finishes and colours, ensuring there is a Construction Specialties Louvre system to suit most aesthetic and performance needs.Louvre panels are factory assembled in a controlled and quality assured environment and provided to site in a fully finished modular form; thus, allowing for trouble-free and fast installation.A comprehensive range of accessories including insect/bird mesh and blanking panels in various materials and finishes is available to complete the application.
Sponsored
ABC Melbourne Office, VIC

ABC Melbourne Office, VIC

Capral Aluminium

The ABC project in Melbourne’s Southbank precinct represents a bold union of the national broadcaster’s multiple aims and responsibilities. With its bold style, internal and external openness and highly innovative use of technology, the ABC’s Victorian headquarters embodies socially responsible design. The central design theme of transparency is perfectly suited to the Capral curtain wall, window and door systems throughout. The building, which designer Cox Architecture characterise as fostering a ‘dynamic, integrated and visually transparent environment which promotes interaction across program teams’, also invites ‘greater public interest and participation’.
Sponsored
33 Congress Street, Boston

33 Congress Street, Boston

Boon Edam Australia Pty Ltd

The City of Boston is known for many things – from Fenway Park to the Boston Marathon to the bar from Cheers, the city is full of iconic landmarks, events, cultural assets, education centers, and more. The City is also recognised for its vast history, especially downtown, where hundred-year-old buildings have been preserved or restored. There is also a mixture of new property development, including 33 Congress Street, in the heart of the financial district, which combines the best of historical design with new construction. 33 Congress incorporates more than 400,000 square feet of office and retail space, transforming the historic neighborhood and positioning the area as a dynamic downtown destination. The project was designed by Arrowstreet, an award-winning architecture and design firm, and was led by Jason King, AIA, LEED, AP, BD+C, Senior Associate for Arrowstreet. Blending Historical Features with a Modern Design According to King, the 33 Congress Street building consisted of three different structures that were built at separate times: in 1904, 1906, and in 1922 and then all combined into one space. While the space functioned as one building, there were three separate elevator cores, sets of restrooms, sets of stairs, and more. Those entities needed to be reconfigured into one. The most striking feature of 33 Congress is a new, modern glass and steel structure, containing 6 additional floors of office space that sits on top of the original three masonry buildings. Another important project goal was to upgrade the main lobby to a modern design that allowed public access, increased security for building employees, and respected several historical aspects. “We needed a way to get people into the new, main elevator lobby quickly due to the high volume of traffic that we were anticipating would take place after the redesign,” King said. “We also wanted to create an entrance that would create a better flow of entry from the sidewalk into the building.” The original building had an existing revolving door, but it was small and surrounded by stone. “It was dark and uninviting,” King said. “We were creating an open and airy Class A lobby space and wanted visitors to clearly see the ornate, coffered ceiling and experience the grand and historic nature of the lobby as they entered.” Revolving Door and Speed Gates Provide Aesthetics and Function King implemented a Boon Edam Crystal Tourniket manual revolving door to lead visitors in the double height lobby space. The Crystal Tournket is constructed virtually completely from glass with only a few stainless steel accents to ensure the solidity of the revolving door. It fits seamlessly with modern glass facades but can also be a beautiful eye catcher in more traditional or classic designs. For employee access, the building’s previous design did not incorporate turnstiles to the elevator banks. “The building did have card reader access, but only at certain doors and locations,” King said. King installed four lanes of Boon Edam Lifeline Speedlane Swing speed gates and two Winglock Swing model access gates to provide secure employee access to the building’s upper floors. The Lifeline Speedlane Swing speed gate manages and channels the flow of people entering and moving around buildings. It employs sensors that detect visitors approaching, with pulsing light strips to guide the user. A sleep function saves on energy use. It can be customised with dimensional and glass choices, including corporate identity colors or other options, so that it either blends-in or stands-out from its surroundings. The Boon Edam Winglock Swing is constructed from stainless steel and a single glass panel, and is unobtrusive in nature and design. The access gate easily manages bi-directional traffic, with LED lights that signal if the gate is in use or on standby. The access gate ties into a manned security desk located near the front doors. Employees gain access to the building through either the Lifeline turnstiles, or a Winglock Swing access gate, while building visitors can receive credentials at the security desk. King said, “We started the process looking at Boon Edam from a security and an aesthetic standpoint. We went through multiple product options but always had a Boon Edam product as the basis of the design. We have been happy with Boon Edam entrance solutions and we are planning to use them again for future projects.”
Sponsored
Townsville Hospital, QLD

Townsville Hospital, QLD

Rondo Building Services Pty Ltd

Rondo has so far provided over 10,000lm of various wall and ceiling systems, including Rondo Steel Stud Drywall Framing System, KEY-LOCK Suspended Ceiling System and DUO Exposed Grid Ceiling System. More complicated designs arose when it was discovered that the high cyclonic winds would affect the facade of the building.
Sponsored
Santiago Airport, Spain

Santiago Airport, Spain

SAS International Australia

A Tricell system was designed by SAS International to fit the "Y" shaped departure lounge at Santiago Airport. SAS International has designed, manufactured and installed metal ceiling solutions for both interior and exterior areas of the new 74,000m² terminal of the Aeropuerto de Santiago, Spain. SAS810 tricell has been installed to create a triangular aesthetic in the departure lounges. This open cell system provides a geometric form that can easily be repeated for a striking finish. The flexible approach in SAS International’s design process enabled this unique solution to fit within the ‘Y’ shaped designed departure lounge. Installed in the main terminal and baggage hall, as well as exterior ceiling areas, is the linear profile system SAS710. The linear slat ceiling, designed so that each slat lines up neatly with the next, forms a perfect row resulting in clean and simple architectural lines. SAS710 was also chosen for the exterior of the building to provide continuity of design. Using specially designed slat retaining angles, the system has been adapted for strength and durability to prevent slats from being dislodged in high wind.
Sponsored
Evolution Tower, Russia

Evolution Tower, Russia

Guardian Glass (Australia)

The unique spiral design of the tower is a remarkable architectural accomplishment, with an overall twist of 156 degrees clockwise – one of the most extreme twists in any architectural project. Each of the tower’s 52 floors is rotated through 3 degrees, leading to its twisted corkscrew shape.
Sponsored
Termimesh - Protecting Historical Landmarks – Norwood Oval Adelaide

Termimesh - Protecting Historical Landmarks – Norwood Oval Adelaide

Termimesh

Termi Home & Commercial (SA) were proud to be a part of the historic Norwood Oval Redevelopment project in Adelaide, South Australia. As one of the most iconic football grounds in Adelaide only a non chemical termite management solution would do. We designed and installed the Termimesh System keeping in mind both the historical significance and the new facilities.The suitability of the Termimesh system for this project is based on its flexibility, which was necessary due to complex external geometry of the new construction and integration with the existing buildings. This presented challenges in performing remedial work. For example the Sir Edwin Smith Grandstand is heritage listed meaning minimal work was allowed to the external façade. This is where the strength of our termite management system lies. It can be customised for each individual project. Our estimating and design team will work alongside the architect, marking up plans and explaining how the system is applied to the design. Which in the case of the Norwood Oval was extremely important. We are on hand during the construction phase to iron out any challenges that may arise ensuring the installation process is simple, smooth and straightforward.Termimesh has maintained our position as market leader in termite protection in the South Australian construction industry for over 25 years, with a strong domestic and commercial portfolio. We are one of few companies that are triple certified to AS48001, ISO9001 and ISO14001 which delivers additional peace of mind for our clients.CONSTRUCTION TEAMSchiavello ConstructionOur team has a good relationship with the lead contractor, Schiavello, having worked on past projects together. They knew our capability and after a detailed review of the construction programme, we were sure we could meet their requirements. As a supporter and sponsor of the Norwood Football Club, Schiavello recognised the significance of the project for the community.  PROJECT DETAILSClient                          City of Norwood, Payneham & St Peters. Specifying Architects                                    Tridente ArchitectsInstallation Year                                              2019Installation Duration                                      7 monthsProject Value                                                    $9 mil TECHNICAL DETAILSInstallation Type                                             NumberService penetrations                                     200Column blockouts                                          7.5 LM                 Cluster penetrations                                     4Control joints                                                   315 LMConstruction joints                                        73 LMSaw cut service penetrations                    147 LMConcrete slab pours                                      NumerousPerimeter                                                          147 LMKey Termimesh Personnel                          Drew Wilson- Account Development ManagerShane Waye, Senior EstimatorAnthony Bennett- Operations Field Manager
Sponsored
Functional Coatings - Crystalbrook Kingsley

Functional Coatings - Crystalbrook Kingsley

ECOTONE

CollaborationArchitect: EJE ArchitectureBuilder: Core Project GroupBreifDevelop the best coating system to maintain the surface appearance of the newly restored heritage-listed Kingsley building to align with its vision of being a true luxury hotel.Material & ApplicationECOCLEAN Porosity CoatingECOCLEAN Self-Cleaning CoatingOutcomeThe ECOCLEAN coating system uses self-cleaning technology to preserve the concrete appearance of the Kingsley – the first luxury hotel in Newcastle. Winner of two Asia-Pacific Hotel of the Year awards, the Kingsley is a remarkable example of what photocatalyst coatings can do to preserve the appearance of heritage-listed buildings while reducing maintenance budgets.TestimonialAn old soul with a fresh twist, Crystalbrook Kingsley is culturally connected, sustainably-led, simply sophisticated, and steeped in history. The first luxury hotel to grace Newcastle, Crystalbrook Kingsley sparks vibrant energy and nostalgia in one moment.
Sponsored
Parramatta Square, NSW

Parramatta Square, NSW

Rondo Building Services Pty Ltd

Rondo provided a range of market leading wall and ceiling systems for both buildings 3 and 4. Our KEYLOCK Concealed Suspended Ceiling System and Steel Stud and Track Wall Framing System were used for the internal fit out, completed by AUSTRAL Interiors. SMTM Projects used our 1.15 BMT Stud and Track with top hats.
Sponsored
The Podiums, QLD

The Podiums, QLD

Rondo Building Services Pty Ltd

For instance, Superior faced the challenge of creating curved detailed bulkheads and feature ceilings. However, with Rondo’s help using a hybrid of the Rondo KEY-LOCK Concealed Ceiling System and Stud & Track Wall Framing System, they managed to create a great outcome.
Sponsored
Skycity Casino & Hotel, SA

Skycity Casino & Hotel, SA

Rondo Building Services Pty Ltd

The KEYLOCK Concealed Suspended Ceiling System, Steel Stud and Track Wall Framing System, and XPRESS Drywall Grid Ceiling System have been integrated throughout the project. Rondo’s long-term relationship with Ceiling & Wall Contractors enables the project to run smoothly and the onsite coordination is exemplary.
Sponsored
Royal Hobart Hospital, TAS

Royal Hobart Hospital, TAS

Rondo Building Services Pty Ltd

As the project was located in Hobart, it required the project team including Rondo to work together to be organised and keep a clear path of communication. This resulted in the full specification being completed early in the process, the specification included Rondo Wall Stud, KEY LOCK Ceiling Systems, DUO Ceiling Systems, External Soffit Systems and our extensive knowledge on seismic design.
Sponsored
The 2 Girls Building, VIC

The 2 Girls Building, VIC

Alspec

A mixed use building that fuses art, photography and architecture
Sponsored
Form Meets Function - Space House, NSW

Form Meets Function - Space House, NSW

Alspec

An architectural accomplishment of interlocking pavilions arranged as floating prisms
Sponsored
National Portrait Gallery, Canberra ACT

National Portrait Gallery, Canberra ACT

Alspec

Winner of the Sir Zelman Cowen Award for Public Architecture
Sponsored
Lambton Square, NZ

Lambton Square, NZ

Rondo Building Services Pty Ltd

The $11.3 million dollar renovation of Lambton Square required Rondo product throughout including our Key-Lock Concealed Ceiling System, Steel Stud Wall framing system and various other Rondo components for the fixing of plasterboard and feature panels.
Sponsored
Health & Innovation Building, SA

Health & Innovation Building, SA

Rondo Building Services Pty Ltd

he developments $247.3m price tag makes it marginally more expensive than the $246m Adelaide University building next door. HIB will house the Centre for Cancer Biology and UniSA’s pharmacy school, with 450 researchers between them. Rondo’s involvement included providing ceiling and wall systems using our Shaftwall One-Way Erected System, KEY-LOCK Concealed Ceiling System and PANTHER Access Panels to create the desired effect.
Sponsored
Moonee Ponds, VIC

Moonee Ponds, VIC

Rondo Building Services Pty Ltd

Rondo Technical Representative Tino Cucinotta, worked closely with the 2DG team – and assisted with the supply of QUIET STUD Acoustic Wall System, Stud & Track and Finishing Sections, whilst Rondo’s newly released XPRESS Drywall Grid Ceiling System was due to arrive, ensuring the project could continue efficiently.
Sponsored
102 The Mill, Balmain NSW

102 The Mill, Balmain NSW

Alspec

The architecturally designed home uses Alspec door and framing products in its transformation.
Sponsored
Adelaide Convention Centre, SA

Adelaide Convention Centre, SA

Rondo Building Services Pty Ltd

The project has called on our Technical Services Team for wall and ceiling designs, with significant quantities of Rondo systems used in the project including Rondo Stud and Track, KEY-LOCK Concealed Suspended Ceiling Systems and PANTHER Access Panels.
Sponsored
Mark Moran Group Aged Care, NSW

Mark Moran Group Aged Care, NSW

Boon Edam Australia Pty Ltd

The first installation in Australasia has been completed of Boon Edam’s Circleslide architectural curved automatic sliding doors that elegantly cater to access for disability needs of modern and traditional buildings. The Circleslide installation for Mark Moran Group at Pacific Highway Warrawee on Sydney’s North Shore provides a prestigious, weather-protected entrance to a development of up-market aged care accommodation built by Next Group for Benson McCormack Architecture.  The door’s practical advantages also apply to a wide range of buildings in Australia and New Zealand, including commercial and public and private facilities, including offices, aged care, health, hospitality, restaurant, retail, tourist and transport facility uses, says Boon Edam Australia Managing Director, Michael Fisher.Circleslide installations consist of two sets of curved sliding doors – one on each of the entrance and exit sides – to provide a larger opening than traditional sliding doors, and retaining the elegant shape of revolving doors. This extra space is a major advantage for people with a disability, or those that require mobility aids. Enhanced accessibility Circleslide curved automatic sliding doors provide spacious and comfortable access for everyone using them including especially people with disability and their carers, and particularly people those with mobility issues who rely on wheelchairs, mobility scooters, wheeled walkers and other mobility devices commonly used in workplaces and public facilities. “Access to public and private facilities is an important and increasing issue for more than five million Australians and New Zealanders living with disabilities. This growing sector of the population includes the higher proportion of older people with limited mobility, including more than 750,000 Australasians who use mobility aids,” says Mr Fisher. “Where building professionals seek to provide for such people but want to retain the prestigious shape and functionality of revolving doors, Circleslide doors are an ideal solution that provides the additional capacity required,” he says. Circleslide doors complement Boon Edam’s global ranges of revolving doors, which is one of the world’s most comprehensive ranges. Their elegant design and access control functionality are preferred by architects, builders and designers for Fortune 500 companies in 27 countries. Customisable features The Circleslide door has an optional “winter mode” whereby only one sliding door opens at a time, which can reduce HVAC losses and contribute to the overall sustainability of the building. Like all Boon Edam revolving doors, Circleslide is available in a wide variety of colours and finishes, so it can be customised to the look and feel of contemporary and period buildings. The self-learning technology incorporated in the curved sliding door mechanism ensures extremely quiet and smooth movement of the doors. Options include: Interlocking modeConnection to external alarm system (e.g. fire alarm, smoke detector)Push-button free outKey impulse switchDirection sensitive motion detectorsGlass protection sheetsFloor matsAuthorised night entry·        Air curtain technology to create a barrier of air flowing from the revolving door’s canopy or sides to further extend revolving doors’ built-in advantage of excluding heat or cold to save HVAC costs through their unique always-open, always-closed configuration.  Night Locking Options include an electromechanical lock that can be unlocked with a key or by means of an optional key impulse switch.
Sponsored
Bailey Hotel and Resort

Bailey Hotel and Resort

Mapei Australia Pty Ltd

Installation of floor and wall coverings, Sealants application, Surface preparation, Tile & stone installation systems, Waterproofing
Sponsored
Wynn Place, Macau

Wynn Place, Macau

Rondo Building Services Pty Ltd

The hotel and casino will include a luxury hotel, gaming areas, dining, and retail and convention facilities along with numerous special attractions. Rondo provided this project with all the Drywall Steel Stud Partition Systems for the podium, gaming areas and the hotel tower. Included in the plan were also specially designed and supplied maintenance WALK–ABOUT Trafficable Ceiling Systems as per the project requirements.
Sponsored
Burj Khalifa

Burj Khalifa

Boon Edam Australia Pty Ltd

The Burj Khalifa – formerly the Burj Dubai – is a legendary building that can only be described in superlatives. At 828 metres high, it is the tallest building in the world. The Burj Khalifa has 160 floors, more than any building in the world. The building also has the highest floor, the highest façade made of aluminium and glass, the highest nightclub and the highest restaurant, the highest service lift and the lift with the longest travel distance. Finally, the building has the highest positioned revolving doors ever installed in a façade worldwide. In less than 30 years, Dubai has become the leading city in the Middle East and is known for its architectural and technical excellence. The Burj Khalifa has become the symbol of this progress. The Burj Khalifa also takes the title of the highest structure in the world back to the Middle East; the Great Pyramid of Giza used to hold the title 4 millennia ago. International Collaboration The tower was designed by architectural firm Skidmore, Owings & Merril, known for their designs for the Willis Tower (formerly the Sears Tower) and the new One World Trade Center in New York. The three-pronged design is based on the spider lily desert flower and consists of three elements around a central core, with the elements spiralling upwards. It can rightly be called an international project: the construction team consisted of Samsung Engineering & Construction employees from South Korea in collaboration with Besix from Belgium and Arabtec from the United Arab Emirates. The UK consultancy Hyder Consulting was responsible for overseeing construction of the building. In total, companies from more than 30 different countries contributed to the construction of the Burj Khalifa. A Windy Challenge The wind is quite a challenge when building a skyscraper of this size. Without additional measures, the top of the building would move so much from side to side due to the wind that people would become seasick. Dubai is also regularly tested by the shamals: sandstorms that can last for days. As the outer façade of the Burj Khalifa contains an enormous amount of glass, these weather conditions presented a considerable challenge. The three-part design proved to be the solution because the spiral floors break the wind currents around the building, resulting in a stable structure. The World's Highest Revolving Doors Skidmore, Owings & Merril's design includes an observation platform on the 124th floor of the building. Two glass revolving doors provide access to this room. At 442 metres above the ground, these are the highest positioned revolving doors ever installed in the façade of a building. The revolving doors must also be able to withstand an extremely high wind load of at least 3000 Pascal, which corresponds to an F3 class tornado. The Burj Khalifa required two automatic revolving doors with a diameter of 3,000 mm and a total height of 2,700 mm; the cover could only be 300 mm high with the motor installed. Generally speaking, a revolving door with these specifications would only be able to withstand wind loads of up to 689 Pascal. It was clear, then, that not every revolving door manufacturer could supply an entrance that met these requirements. Challenge Accepted Koninklijke Boon Edam was one of only two companies invited to devise a system for this challenge. There were two main problems that had to be solved: the round sides of the revolving door had to be strong enough to resist the wind, and the door set had to be properly fixed so the door wings could not be blown off during a storm. Boon Edam worked closely with Mace, the Hyder Consulting Group, Samsung Engineering and Construction and Turner Construction, the subcontractor, to develop a system that met all these requirements. During the first phase of the process, the second company invited to tender had to give up because their design did not meet the challenging conditions on the 124th floor. Boon Edam persisted in its efforts, and after conducting various wind load and glass tests, it became possible to adapt the construction of the Tourniket to the requirements of the Burj Dubai. A Tornado-Proof Revolving Door at the Burj Khalifa Our proposal for the Burj Khalifa consisted of a Tourniket with specially reinforced door frames twice the width and thickness of a normal revolving door. These were securely anchored with special bolts under the floor to guarantee the structure's rigidity. Although most revolving doors are installed on the top of the subfloor, this door was installed under the top finish layer of the concrete floor. To guarantee the stability of the door set, an extra-thick steel frame was added to the structure. This allows the door wings to easily withstand the wind pressure. Expansion on the 148th Floor in 2014 Boon Edam installed the same specially designed Tourniket revolving door on the 148th floor as on the 124th floor. However, the new project brought an extra challenge: transporting all of the materials from the basement of the building to the 148th floor. First, the materials had to be transported in one lift to the 111th floor. They were then transferred to a second lift, from where everything had to be moved manually from the 149th floor to the 148th floor, to the door's location. Special Projects Based on Standard Solutions The revolving doors we created for the Burj Khalifa were an extreme challenge. The experience and expertise of our technicians combined with the tried and tested technology of the Tourniket enabled us to develop a successful solution. Both revolving doors are now used daily and give visitors a spectacular view of Dubai. The glass design beautifully complements the modern façade of the observation platform and puts Dubai's beautiful skyline in the spotlight.
Sponsored
Park Hyatt, NZ

Park Hyatt, NZ

Rondo Building Services Pty Ltd

Due to tight plenum space and extremely congested plenum areas, Rondo’s new Xpress Drywall Grid System was the ideal ceiling system to use. This maximised the ceiling heights in all guest rooms while offering compliant plenum vertical clearances. Contractors implemented Rondo’s intricate feature ceilings and bulkheads throughout the entire building, such areas included the lobby, restaurants and conference areas.
Sponsored
Macquarie University Car Park Turf Cell

Macquarie University Car Park Turf Cell

Atlantis

APPLICATION: 52mm Turf CellPROJECT LOCATION: North Ryde NSWPROJECT DETAILS: Macquarie University Permeable Overflow Car ParkPROJECT COMPLETION: March 2017Established in 1964, Macquarie University began as a bold experiment in higher education. Built to break from traditions: to be distinctive, progressive, and to be transformational. Today its pioneering history continues to be a source of inspiration as they celebrate their place among the best and brightest minds.When Macquarie University’s existing cark park became too small for the amount of cars now using it, it was decided to construct an overflow car park. However, not just any car park, but in keeping with their innovative thinking, an environmentally friendly permeable car park. Of course the Atlantis® Turf CellTM system was chosen, so that turf covered parking spaces could be provided.The project required 9,843sq. m of Atlantis® Turf CellTM system, which is constructed from 480mm x 260mm x 52mm panels and has a rigid interlocking clipping system and is made from high quality recycled polypropylene. The project was undertaken by J & G Excavations and Asphalting (NSW) Pty Ltd.The Turf CellTM cells were laid on a bed of permeable soil, and filled with sandy soil and turf was then placed on top of the linked Atlantis® Turf CellTM cells and rolled with a heavy roller to press the roots into the soil in the cells, where they were protected from compaction and could grow freely both horizontally and vertically.The Turf CellTM system is another Atlantis invention, and is specifically suited for car parks, access roads, aircraft taxiways and helicopter landing pads as it has the following features:a high load bearing of approximately 4000t/sq. M;protects the root system of grass from compaction, while allow for vigorous horizontal and vertical root growth;permits surface water absorption and infiltration;has a long use life; andaesthetically, the system allows the grass to fill in completely, creating a lush lawn with an invisible reinforcement structure.
Sponsored
Ivy 95 Residences, Broadbeach, QLD

Ivy 95 Residences, Broadbeach, QLD

Alspec

Durable architectural grade aluminium framing products provide peace of mind for residents of these luxury seaside apartments.
Sponsored
Peppers Pier Resort, QLD

Peppers Pier Resort, QLD

Rondo Building Services Pty Ltd

The Rondo Technical Services Department worked closely with CSR Gyprock to come up with a suitable External Wall system. The project consists of over 30,000 lineal metres of 92 1.15bmt lipped studs used for the external wall system and over 45,000 lineal metres of 64mm 0.50bmt lipped studs for the internal walls.

Showing 37-72 of 304

Feedback