NBS Source
I'm a manufacturer

"pump"

39 results found

Sort by:

Showing 1-3 of 3

Sponsored
Rainwater harvesting for a government facility

Rainwater harvesting for a government facility

Atlantis

Project Location: Amberley, Queensland, AUSTRALIA.In Amberley is one of the largest base facilities in Australia. The redevelopment works are valued at AU$331.5 million. New construction and refurbishment works to be undertaken include newliving-in accommodation, maintenance facilities, storage, working and training accommodation, a combined mess and a new physical fitness centre.The site is owned by an Australian Government Department. The Atlantis® Turf Cell® was supplied by Atlantis and was installed by Kennedy Projects Group in April 2009. The system is located at the playing fields on the south-western corner of Gannet St and Rosewood Road, Amberley, QLD.A vegetated swale surrounds the playing field. The swale is an open, shallow channel designed to slow runoff, filter it, and promote infiltration into the ground. Excess water moving through the soil profile is captured by Atlantis® Matrix® Tank – Single modules. The use of a swale to collected water results in smaller runoff volumes, lower peak discharge rates and cleaner runoff. The vegetation in swales, usually thick grass, helps to trap pollutants such as suspended solids and trace metals. The Atlantis Matrix modules extend 3m (10ft) wide under the swale for 110m (360ft).Water collected by the swale is collected in a stormwater harvesting tank located adjacent to the north-western corner of the playing field. Perforated corrugated plastic pipes used as subsurface drainage pipes extend for 1560m (5110ft) is also collected by the stormwater harvesting tank.The stormwater harvesting tank is located subsurface and is constructed of a heavy duty low density polyethylene liner and non woven geotextile surrounding Atlantis® Matrix® Tank - Double modules. The Atlantis stormwater tank has a 4,100m3 (144,80 ft3) capacity. Water collected by the swale and stormwater tank system is used for irrigation of the sports field.The Atlantis stormwater tank has eight (8) cleanout / inspection ports placed through the systems. A 1200mm (4ft) dia. wet well with bolt down lids has been installed adjacent to the tank serves as a pump out pit. The overflow from the tank has a 15m (50ft) long x 400mm (1.3ft) deep spill way with scour protection into an adjacent creek.
Sponsored
Manly Beach Below Grade Project

Manly Beach Below Grade Project

Tremco

About the ProjectThis Child Health and Learning facility in Manly, deliversspecialist child healthcare for up to 15,000 families a yearfrom rural, regional and remote New South Wales andbeyond.The new facility will integrate a state-of-the-art child schooland health service that will accommodate regional childrenand families nationwide.This six storey building includes school classrooms,consultant and observation rooms, a paediatric oral healthunit with a dental and orthodontics room, ophthalmology,occupational therapy, sensory rooms and a telecare centre.ChallengeOver 80% of construction litigation and defect claims are a result of water ingress, of that 80%, almost 30% of those are below grade issues. (City Futures Research Centre UNSW).The two biggest waterproofing challenges for this build were:1) Below Grade - Non structural Blinding Slab, 4 metres below sea level and less then 50 metres from Manly Beach. This build had decanters pumping over 1.3 million litres of water per day awayfrom the site during the construction phase.2) The creation of a waterproofing solution which would not fail if the membrane was penetrated, be it in the pre or post construction phase.Due to the proximity to the beach and the build having a raft slab in the basement, a standard cookie cutter below-grade waterproofing solution was not an option for this build.Tremco SolutionTremco were asked to provide a solution for this complex build. The biggest and most demanding waterproofing areas within the build that needed attention were:1) Below Grade - 50 metres from the ocean and 4 metres below sea level, we needed a reliable waterproofing solution, that would also be robust enough to withstand any punishment tradesdelivered post installation, we recommended and used Paraseal SW (Saltwater). Paraseal SW is a multi-layer sheet membrane waterproofing system consisting of a self-sealing, expandable layer of bentonite laminated to an impermeable, high density polyethylene (HDPE).2) iAuditor reporting- iAuditor is an onsite quality assurance program Tremco conduct for the builder and applicator to ensure our products are being installed correctly and to specification. This gives the builder the confidence that there will be no waterproofing defects within the build.Overall, both the builder and developer were happy with the end result, which provided the warranty and quality required of such a development.
Sponsored
Iconic Maison de l’Ordre des Avocats fire-protected by Hempafire Pro 315

Iconic Maison de l’Ordre des Avocats fire-protected by Hempafire Pro 315

Hempel

With a glass façade symbolising the transparency of justice and a glossy metal exoskeleton, the new Maison de l’Ordre des Avocats (House of the Paris Bar Association) is a stunning addition to the French capital’s new Batignolles judicial city. For the building owner, safety is a top priority. Therefore, the exoskeleton needed a proven passive fire protection coating that would enable the steel to maintain its load-bearing capacity for up to 60 minutes during a fire, giving those inside valuable extra time to evacuate.The challenge Specialist paint application and surface treatment company ROTH & Cie was contracted to apply the passive fire protection coating system. ROTH & Cie has worked with Hempel for many years and was keen to work with us on this project. However, due to the project schedule, the tubular exoskeleton framework was delivered to the construction site with a competitor’s epoxy primer already applied. ROTH & Cie therefore wanted a Hempel passive fire protection system that would work with the existing primer. Also, as building aesthetics are important in the overall design, the exoskeleton needed a high-quality matt satin finish. The solution Our solution was to specify a system of Hempafire Pro 315 and Hempathane 55750. A single component intumescent coating, Hempafire Pro 315 complies with the EN 13501-2 standard for the fire classification of construction products. It is optimised to provide 60 minutes of passive fire protection, as well as partial protection up to 90 minutes. In addition, thanks to its exceptionally low loadings, Hempafire Pro 315 requires significantly lower dry film thicknesses than competitor products. As a result, ROTH & Cie could apply the coating in a thinner coat, significantly reducing paint consumption, application time and project costs. The full system was completed with Hempathane 55750, a polyurethane topcoat with quick crosslinking properties that provides the matt satin appearance required by the specifications. Our dedicated passive fire protection R&D Centre in Barcelona, Spain verified that Hempafire Pro 315 could be applied on top of the existing primer. The entire system was spray applied using an electric airless pump, which is ideal for construction sites as it does not require an air compressor. The project is just another in a long line of successful collaborations with ROTH & Cie, which also include previous passive fire protection coating projects, most notably La Halle Secrétan covered market and La Samaritaine department store, both in Paris.At a glance Project Name: Maison de l’Ordre des Avocats (House of the Paris Bar Association) Customer: ROTH & Cie System: Hempafire Pro 315 + Hempathane 55750 Volume: 4,080 litres

Showing 1-3 of 3

Feedback