NBS Source
I'm a manufacturer

"fountain"

75 results found

Sort by:

Showing 1-3 of 3

Sponsored
Transvaal Square

Transvaal Square

RBA Group

The Transvaal Square features the following RBA products:RBA8901-102  Watermarked Drinking FountainRBA8888-100  ‘Euro’ BasinRBA1083-600   Stainless Steel Time Flow TapRBA8851-428   Accessible Stainless Steel WCRBA4150-101   BackrestRBA4041-900   Wraparound 40° LHH Grab RailKB110-SSWM Koala Kare Horizontal Stainless Steel baby Change TableRBA8889-186  ‘Curvalinear™’ Stainless Steel Accessible Basin & Matching TapwareRBA8820-100  High efficiency UrinalRBA8851-156  Ambulant Stainless Steel WCRBA4090-450  Ambulant grab rail
Sponsored
Altona Dog Beach Showers, VIC

Altona Dog Beach Showers, VIC

BRITEX Metal Products

Commissioned by Hobson Bay City Council as part of the PA Burns Reserve and Altona Dog Beach Upgrade, Britex supplied a set of purpose built, custom designed Vandal Resistant Stainless Steel Dog Showers. Accessible Drinking Fountains with additional Dog Bowl were also supplied. The Customised Britex Dog Shower supplied included: 4 x Vandal Resistant Stainless Steel Square Dog Showers Manufactured from Marine Grade Stainless Steel Various heights supplied, 800mm and 1200mm options Integrated Lead Connectors • Vandal Resistant Time Flow Tapware Multiple Shower Sets installed at different heights for small and big dogs Integrated Safety Grab Rails
Sponsored
ANZAC Memorial

ANZAC Memorial

Tremco

About the ProjectThe ANZAC Memorial was designed as a sculptural monument, a unique collaboration between Architect Charles Bruce Dellit and sculptor George Rayner Hoff; it is arguably one of the finest examples of the union of architecture and art in Australia.The building is a striking architectural form, symmetrical on both axes. It uses elements reminiscent of traditional Gothic architecture (buttresses, cathedral windows, high ceilings) in the Art Deco style. The Memorial is adorned externally with twenty sculptures representing the units of the Australian Imperial Force (AIF). These are the sentinels of the building, keeping watch while representing the fallen to whom the building is dedicated.Bruce Dellit’s vision for the Memorial included a still pool bounded by poplars to the north of the building (included for their significant symbolic association with the battles in France and Belgium), and a cascading fountain to the south.The Hall of Service, at the centre of the Centenary Extension, is a civic space that architecturally and artistically mirrors the Hall of Silence. The Hall was named in acknowledgment of the original Memorial halls and to recognise more than a century of service by Australian servicemen and servicewomen. At the threshold to the space are the words: “NSW Service with and for All Australians”.The ChallengeWhen restoring a National War Monument visited by hundreds of thousands of people, you need to provide the highest quality results and finishes expected of such a significant structure in our history. The challenge here, comes from creating a restoration solution on a building which was designed in the early 1930’s, which will be flexible enough to maintain the architects core design features but also created and executed within a tight time frame in time for ANZAC day. The solution needed to encompass modern technology with traditional design features to ensure the restoration lasts for the next 100 years as a memorial to our fallen heroes.Tremco SolutionTremco worked closely with Sure Seal and Built to provide a solution which was both timely and high quality. the installers long standing relationship with Tremco, a number of unique solutions, together with a 20 year warranty period proved a success.Over 15,000m2 of Tremco products were installed on this historic site. Tremco provided regular iAudit reports on the job site (iAudits is a quality control measure used to ensure the products are being applied consistently to maintain warranty conditions) During regular site visits, Tremco were able to provide a high level of customised Technical information and design advice to ensure the project ran smoothly and to Built’s expectations.

Showing 1-3 of 3

Feedback