NBS Source
I'm a manufacturer

"elevator"

39 results found

Sort by:

Showing 1-6 of 6

Sponsored
Pier One, NSW

Pier One, NSW

Dyson (Australia)

One of Australia's most iconic hotels is using Dyson technology to elevate well-being, comfort and pleasure. From light levels and air quality to hygiene and cleanliness, the world's best hotels scrutinise every detail to enhance the guest experience.
Sponsored
33 Congress Street, Boston

33 Congress Street, Boston

Boon Edam Australia Pty Ltd

The City of Boston is known for many things – from Fenway Park to the Boston Marathon to the bar from Cheers, the city is full of iconic landmarks, events, cultural assets, education centers, and more. The City is also recognised for its vast history, especially downtown, where hundred-year-old buildings have been preserved or restored. There is also a mixture of new property development, including 33 Congress Street, in the heart of the financial district, which combines the best of historical design with new construction. 33 Congress incorporates more than 400,000 square feet of office and retail space, transforming the historic neighborhood and positioning the area as a dynamic downtown destination. The project was designed by Arrowstreet, an award-winning architecture and design firm, and was led by Jason King, AIA, LEED, AP, BD+C, Senior Associate for Arrowstreet. Blending Historical Features with a Modern Design According to King, the 33 Congress Street building consisted of three different structures that were built at separate times: in 1904, 1906, and in 1922 and then all combined into one space. While the space functioned as one building, there were three separate elevator cores, sets of restrooms, sets of stairs, and more. Those entities needed to be reconfigured into one. The most striking feature of 33 Congress is a new, modern glass and steel structure, containing 6 additional floors of office space that sits on top of the original three masonry buildings. Another important project goal was to upgrade the main lobby to a modern design that allowed public access, increased security for building employees, and respected several historical aspects. “We needed a way to get people into the new, main elevator lobby quickly due to the high volume of traffic that we were anticipating would take place after the redesign,” King said. “We also wanted to create an entrance that would create a better flow of entry from the sidewalk into the building.” The original building had an existing revolving door, but it was small and surrounded by stone. “It was dark and uninviting,” King said. “We were creating an open and airy Class A lobby space and wanted visitors to clearly see the ornate, coffered ceiling and experience the grand and historic nature of the lobby as they entered.” Revolving Door and Speed Gates Provide Aesthetics and Function King implemented a Boon Edam Crystal Tourniket manual revolving door to lead visitors in the double height lobby space. The Crystal Tournket is constructed virtually completely from glass with only a few stainless steel accents to ensure the solidity of the revolving door. It fits seamlessly with modern glass facades but can also be a beautiful eye catcher in more traditional or classic designs. For employee access, the building’s previous design did not incorporate turnstiles to the elevator banks. “The building did have card reader access, but only at certain doors and locations,” King said. King installed four lanes of Boon Edam Lifeline Speedlane Swing speed gates and two Winglock Swing model access gates to provide secure employee access to the building’s upper floors. The Lifeline Speedlane Swing speed gate manages and channels the flow of people entering and moving around buildings. It employs sensors that detect visitors approaching, with pulsing light strips to guide the user. A sleep function saves on energy use. It can be customised with dimensional and glass choices, including corporate identity colors or other options, so that it either blends-in or stands-out from its surroundings. The Boon Edam Winglock Swing is constructed from stainless steel and a single glass panel, and is unobtrusive in nature and design. The access gate easily manages bi-directional traffic, with LED lights that signal if the gate is in use or on standby. The access gate ties into a manned security desk located near the front doors. Employees gain access to the building through either the Lifeline turnstiles, or a Winglock Swing access gate, while building visitors can receive credentials at the security desk. King said, “We started the process looking at Boon Edam from a security and an aesthetic standpoint. We went through multiple product options but always had a Boon Edam product as the basis of the design. We have been happy with Boon Edam entrance solutions and we are planning to use them again for future projects.”
Sponsored
One Melbourne Quarter

One Melbourne Quarter

Sculptform

The first stage of a two hectare urban regeneration development in Docklands opened in 2018 and introduced the city of Melbourne’s first elevated public park. Floating 10 metres above open public space, a spectacular Tongue & Groove Cladding Soffit overhangs 90 metres, providing natural warmth and texture and remaining consistent with the design of the project. Installed by our partner installer Casello, the project is an example of how our expert installers can complete a project on time and on budget. Green space in the CBD Biophilic design principles were a key to the design of One Melbourne Quarter, bringing the warmth and beauty of natural materials to the workplace. The most prominent inclusion is the spectacular Skypark, located directly above the entrance of the building, on the second floor. The Skypark is a perfect ‘suspended oasis’, bringing the uniquely relaxing aspects of a local park to the inner city. A statement through a soffit With the Skypark suspended above street level, the underside presented a perfect opportunity for the architects Denton Corker Marshall to create a unique feature which was consistent with the design ambitions of the project. Behind the look Sculptform Tongue & Groove Cladding provided a beautiful natural aesthetic in spotted gum. The combination of visual features and colour variation contrasts the greys of the Melbourne CBD and contributes to the overall identity of the project. PEFC certified timber was required to meet Green Star Rating, which was then sourced by Sculptform.
Sponsored
Ferrero Rocher

Ferrero Rocher

Boon Edam Australia Pty Ltd

Ferrero’s new global HQ gathers in one building with nearly 1,300 people, previously spread over five different offices. The building, with a total floor space of almost 30,000 m², opened in December 2019. The building is designed to evoke the atmosphere of an Italian square: a vast atrium is surrounded by two multi-storey office wings. Boon Edam was appointed to craft and install the golden revolving door, on behalf of facade builder Groven + Portal, who in turn worked for general contractor Felix Giorgetti. The colour of the revolving door makes a visual reference to the world-famous golden chocolate - Ferrero Rocher. The Casa Ferrero administrative building consists of two blocks built on a common basement. It was the combination of these plots, and the architectural skills, that resulted in what you see today: a building that is both impressive and elegant as well as being a pleasant and functional workplace for the employees of the food group. Ferrero’s colours are subtly incorporated into the classic facades, with bronze tones and a gilded effect over the windows as well as the entrance glass panels. This effect was achieved by applying a gold-coloured textile fabric to the laminated glass during the project’s construction. Behind the glass facade of the entrance, the most jaw-dropping area of Ferrero’s headquarters unfolds - a central atrium that connects the two blocks and is entirely covered by a glass roof. The spacious atrium is designed to function as a reception and meeting space. Horizontal circulation between the two blocks is facilitated by connecting walkways with a range of 20 meters. The vertical circulation occurs through panoramic glass elevators. The central atrium’s glass-roofed space is open to life within the company and encourages interaction between employees. This 11-storey building, including six upper levels (ground floor + 5 floors) and five lower levels, adapts perfectly to its urban surroundings. The office areas are spread over nine floors, taking advantage of maximum light for the interior space. Levels -3 to -5 include technical areas and parking spaces. Ferrero’s wish was for a functional and pleasant building for everyone who works there. We think they have achieved this in spades!
Sponsored
Rouse Gardens

Rouse Gardens

Tremco

About the ProjectIn response to unprecedented demand, Rouse Garden is filling the void of modern-day homes close to trains, shops & jobs at the most competitive price on the market. Featuring the diversity of 1, 2 & 3 bedroom homes, there’s something for everyone in the most wondrous apartments to grace Rouse Hill. From floor to ceiling glass walls, timber hardwood flooring in your living room and a private rooftop garden terrace complete with BBQ and lounge areas. The quality of design is worthy of being marvelled at. Living rooms have been purposed to allow seamless indoor and outdoor transitions, blurring the boundaries between inside and out and elevating your home to new heights.ChallengeWhen you are building in one of the premier locations in Norwest Sydney, it’s all about the ding to match the lifestyle your new residents demand from your new community.  Presented with tight detail, the look, the feel and the performance of your build time-lines, and expectations of high quality, Hydraseal were tasked with working on Rouse Gardens. Waterproofing both the internals and roof of the building, the builder demanded warranties to match the project requirements and to deliver a quality finish demanded of this high profile project.To streamline this project, availability of stock and ease of application were key product requirements needed from the project, which Tremco were tasked with delivering.Tremco SolutionVulkem H2 Plus, Vulkem NEM, Tremflex50, Vulkem 951Hydraseal partnered with Tremco for a few reasons, primarily trust built up through a longstanding relationship provided the support necessary for the key for the success in this project.The versatility of Vulkem NEM being able to be used for internal wet areas, in conjunction with Vulkem H2, as well as for outdoor areas under Vulkem 951 NF allowed for fast and consistent application of waterproofing on the project, given the tight time frames, all backed with long warranties to match product performance.The combination of Vulkem NEM, Vulkem 951 NF and Vulkem H2 provided the warranties demanded by the builder which resulted in both Builder, and Applicator very satisfied with the job. 
Sponsored
Dexus Gateway Building, Sydney

Dexus Gateway Building, Sydney

Boon Edam Australia Pty Ltd

The Gateway building In Sydney’s Circular Quay is Australia’s first office tower to use fully integrated touchless 3D fingerprint scanning to allow authorised office workers and guests into the building. The building’s new entrance involves a complex integration of security and technology experts, including Boon Edam, Schindler Lifts, Honeywell and IDEMIA (the manufacturers of MorphoWave fingerprint scanning technology). The solution had to work seamlessly to enhance the user experience and building security for tenants and visitors at the 46-storey landmark building in Sydney’s CBD, owned by Dexus Wholesale Property Fund. Boon Edam delivered the entrance security solution, with Lifeline Speedlane Swing speed gates that are the slimmest in the market, which added to the aesthetics, and helped with design considerations within the width of the lift lobbies. Rising Demand by Tenants for Increased Protection The upgrade project required an entrance security system that incorporated sophisticated security yet kept an aesthetically pleasing and unobtrusive lobby. The ideal solution was found by integrating Boon Edam speed gates, MorphoWave fingerprint scanners mounted on a coordinating pedestal (the Lifeline Boost), Schindler Lift destination control and Honeywell access control technology. This was a response to increasing demands by building occupants to improve the entry security measures to better cater for the protection of employees, visitors and valuable data. A Complex, yet Perfect Orchestration Gateway’s access solution includes a bank of sleek and stylish security speed gates (Boon Edam’s Lifeline Speedlane Swing), which are seamlessly integrated with touchless and intelligent elevator destination control (Schindler Port’s PORT 4 mini) and security access via a biometric fingerprint scanning (IDEMIA’s MorphoWave) – all at one point, enabling quick, accurate and seamless entry to secured areas. These technologies are all controlled by Honeywell’s access control system. Mr Stephen Hodge, Senior Project Manager, Dexus added that “with so many stakeholders, and a strong need for reliability and quality, it was important that everyone knew the goals of the project and worked well together. I’m pleased to say that it was like a perfect jigsaw and everything came together smoothly.” “What was important to Dexus is that we were pushing the boundaries to create better experiences, but we’re only doing so with proven products. Boon Edam’s speed gates have been installed globally and locally, and this gave us added confidence that they were the right product for this forward-looking project,” he said.

Showing 1-6 of 6

Feedback