IronAsh columns support the Macquarie University Incubator building

IronAsh columns support the Macquarie University Incubator building

Australian Sustainable Hardwoods

Macquarie University’s Incubator building represents education, technology and innovation. This building may not be the tallest or largest mass timber structure in Australia, but should be equally celebrated for its total commitment to prefabricated timber. The Macquarie University Incubator was a collaboration between Lipman, Architectus, Strongbuild, Taylor Thompson Whitting, Arup and Against the Grain. The design required a prefabricated structure, to enable future dismantle, relocation and reassembly. Through the unique collaboration of the entire team the building was erected in just 37 days and the entire project completed within 6 months.
Sponsored
Mumbai Airport, India

Mumbai Airport, India

Rondo Building Services Pty Ltd

Rondo provided a solid support foundation, using resources from both international and Australian technical services departments. The South West Pier (Stage 1), was built by Rachana Arts and saw Rondo provide assistance for the Corian cladding to the columns by creating adjustable and concealed fixings that were purposely designed for the hollow section support framing, as well as providing Stud and Track to support the various cladding materials.
Sponsored
Span+ & EasyMech MR - Mixed Use Project, TAS

Span+ & EasyMech MR - Mixed Use Project, TAS

Con-form Group

This project is a great example where the client wanted to realise the instant savings of Con-form Group’s engineer certified, rafter mounted system, over costly traditional mounting systems.With a mixture of our EasyMech MR (purlin-mounted), and Span+ (rafter-mounted), HVAC platforms - the client was able to successfully mount all mechanical units across the roof of this mixed-use development in Tasmania.Spanning over 9 metres, this retrofitted Span+ (rafter-mounted), installation answered the clients brief in more ways than one.Rated to 2.5kPa and attached to Con-form Groups proprietary steel stub columns – this platform and it’s screens were retrofitted to the roof of this shopping centre within 2 days.Paired with our Louvre airflow and Classic Screen Walls.
Sponsored
Hotel Jakarta, Amsterdam

Hotel Jakarta, Amsterdam

Boon Edam Australia Pty Ltd

Imagine waking up in this 4-star luxury hotel with panoramic view of the IJ and the city of Amsterdam. Hotel Jakarta: a BREEAM Excellent certified energy-neutral hotel in Amsterdam. Designed with sustainability in mind. Unique for the Netherlands is the 30-meter-high timber structure of the hotel. All columns, ceilings and frames are made from natural, FSC or PEFC certified wood. The south and east façades are covered with 700 m2 of building-integrated solar energy panels (BIPV panels). The glass roof that covers the atrium also contains BIPV cells that, in addition to collecting energy, also function as sun blinds for the subtropical inner garden. The atrium is the center of the hotel and works as a temperature controller in both summer and winter. On each side of the building, rooms have their own covered outdoor space that functions as a structural awning. A custom made revolving door provides access to the hotel where there is a dynamic public area with various bars, restaurants, coffee corners and a wellness center. This transparent revolving door is almost 6 meters high and fits perfectly with the appearance of the facade. In addition, this type of entrance solution is in line with the sustainability requirements of the building.
Sponsored
Heathrow Airport, Terminal 4

Heathrow Airport, Terminal 4

SAS International Australia

The £70 million project saw SAS International design and manufacture bespoke spun alum­inium profiled discs, acoustic metal wall panelling and System 600 rafts in the new terminal. The architects 3D Reid had to make the building light, airy and modern yet the façade and various materials used within the terminal had to withstand potential of a security breach. All products installed ‘land-side’ were required to meet the requirements of Aviation Security in Airport Development (ASIAD). The result answers aesthetic demands, yet provides the highest level of performance for the requirements of the building. For the design to be realised, square aluminium sheets were cut by the manufacturer into a circle and spun into a dome. Installation in such an environment means safety cables had to be attached to each disc, wall panel, tile and raft to ensure they do not fall and cause injury. Allowance for safety cables to be attached had to be taken into consideration during the design phase. Large vertical wall panels with an ultra-micro perforation were also specified to provide the necessary acoustic properties required for this vast open space. The very fine 0.7mm perforation, with 1% open area, helps to manage acoustics within the large open spaced terminal. The off-site modular manufacture of the architectural metalwork products meant installation was quicker, which causes less disruption to such a busy environment, and in addition there is no waste on site. Aesthetic versatility can be achieved using SAS International Architectural Metalwork throughout projects. It also allows for inte­gration of M&E services into the building design while meeting design demands and durability requirements. The range includes acoustic baffles, acoustic wall panels, air handling units, bespoke ceilings, and column casings.
Sponsored
Termimesh - Protecting Historical Landmarks – Norwood Oval Adelaide

Termimesh - Protecting Historical Landmarks – Norwood Oval Adelaide

Termimesh

Termi Home & Commercial (SA) were proud to be a part of the historic Norwood Oval Redevelopment project in Adelaide, South Australia. As one of the most iconic football grounds in Adelaide only a non chemical termite management solution would do. We designed and installed the Termimesh System keeping in mind both the historical significance and the new facilities.The suitability of the Termimesh system for this project is based on its flexibility, which was necessary due to complex external geometry of the new construction and integration with the existing buildings. This presented challenges in performing remedial work. For example the Sir Edwin Smith Grandstand is heritage listed meaning minimal work was allowed to the external façade. This is where the strength of our termite management system lies. It can be customised for each individual project. Our estimating and design team will work alongside the architect, marking up plans and explaining how the system is applied to the design. Which in the case of the Norwood Oval was extremely important. We are on hand during the construction phase to iron out any challenges that may arise ensuring the installation process is simple, smooth and straightforward.Termimesh has maintained our position as market leader in termite protection in the South Australian construction industry for over 25 years, with a strong domestic and commercial portfolio. We are one of few companies that are triple certified to AS48001, ISO9001 and ISO14001 which delivers additional peace of mind for our clients.CONSTRUCTION TEAMSchiavello ConstructionOur team has a good relationship with the lead contractor, Schiavello, having worked on past projects together. They knew our capability and after a detailed review of the construction programme, we were sure we could meet their requirements. As a supporter and sponsor of the Norwood Football Club, Schiavello recognised the significance of the project for the community.  PROJECT DETAILSClient                          City of Norwood, Payneham & St Peters. Specifying Architects                                    Tridente ArchitectsInstallation Year                                              2019Installation Duration                                      7 monthsProject Value                                                    $9 mil TECHNICAL DETAILSInstallation Type                                             NumberService penetrations                                     200Column blockouts                                          7.5 LM                 Cluster penetrations                                     4Control joints                                                   315 LMConstruction joints                                        73 LMSaw cut service penetrations                    147 LMConcrete slab pours                                      NumerousPerimeter                                                          147 LMKey Termimesh Personnel                          Drew Wilson- Account Development ManagerShane Waye, Senior EstimatorAnthony Bennett- Operations Field Manager