NBS Source
I'm a manufacturer

"blinds"

4 results found

Sort by:

Showing 1-2 of 2

Sponsored
Hotel Jakarta, Amsterdam

Hotel Jakarta, Amsterdam

Boon Edam Australia Pty Ltd

Imagine waking up in this 4-star luxury hotel with panoramic view of the IJ and the city of Amsterdam. Hotel Jakarta: a BREEAM Excellent certified energy-neutral hotel in Amsterdam. Designed with sustainability in mind. Unique for the Netherlands is the 30-meter-high timber structure of the hotel. All columns, ceilings and frames are made from natural, FSC or PEFC certified wood. The south and east façades are covered with 700 m2 of building-integrated solar energy panels (BIPV panels). The glass roof that covers the atrium also contains BIPV cells that, in addition to collecting energy, also function as sun blinds for the subtropical inner garden. The atrium is the center of the hotel and works as a temperature controller in both summer and winter. On each side of the building, rooms have their own covered outdoor space that functions as a structural awning. A custom made revolving door provides access to the hotel where there is a dynamic public area with various bars, restaurants, coffee corners and a wellness center. This transparent revolving door is almost 6 meters high and fits perfectly with the appearance of the facade. In addition, this type of entrance solution is in line with the sustainability requirements of the building.
Sponsored
Manly Beach Below Grade Project

Manly Beach Below Grade Project

Tremco

About the ProjectThis Child Health and Learning facility in Manly, deliversspecialist child healthcare for up to 15,000 families a yearfrom rural, regional and remote New South Wales andbeyond.The new facility will integrate a state-of-the-art child schooland health service that will accommodate regional childrenand families nationwide.This six storey building includes school classrooms,consultant and observation rooms, a paediatric oral healthunit with a dental and orthodontics room, ophthalmology,occupational therapy, sensory rooms and a telecare centre.ChallengeOver 80% of construction litigation and defect claims are a result of water ingress, of that 80%, almost 30% of those are below grade issues. (City Futures Research Centre UNSW).The two biggest waterproofing challenges for this build were:1) Below Grade - Non structural Blinding Slab, 4 metres below sea level and less then 50 metres from Manly Beach. This build had decanters pumping over 1.3 million litres of water per day awayfrom the site during the construction phase.2) The creation of a waterproofing solution which would not fail if the membrane was penetrated, be it in the pre or post construction phase.Due to the proximity to the beach and the build having a raft slab in the basement, a standard cookie cutter below-grade waterproofing solution was not an option for this build.Tremco SolutionTremco were asked to provide a solution for this complex build. The biggest and most demanding waterproofing areas within the build that needed attention were:1) Below Grade - 50 metres from the ocean and 4 metres below sea level, we needed a reliable waterproofing solution, that would also be robust enough to withstand any punishment tradesdelivered post installation, we recommended and used Paraseal SW (Saltwater). Paraseal SW is a multi-layer sheet membrane waterproofing system consisting of a self-sealing, expandable layer of bentonite laminated to an impermeable, high density polyethylene (HDPE).2) iAuditor reporting- iAuditor is an onsite quality assurance program Tremco conduct for the builder and applicator to ensure our products are being installed correctly and to specification. This gives the builder the confidence that there will be no waterproofing defects within the build.Overall, both the builder and developer were happy with the end result, which provided the warranty and quality required of such a development.

Showing 1-2 of 2

Feedback